Illumination Project to Animate Calgary Underpass

Illumination Project to Animate Calgary Underpass

August 3, 2016

Calgary city councillors have approved a plan to illuminate a downtown underpass variously described as “scary” and “a space of fear.” The project will feature interactive lighting that will change as pedestrians approach, offering a creative solution to an unsafe eyesore, and is part of a larger $6.7 million revitalization of the underpass. 

More than 8,000 pedestrians use the 4th Street SW underpass each weekday, but many report feeling uncomfortable or unsafe, particularly at night. The underpass connects the downtown core with the “Beltline,” a densely populated urban neighbourhood featuring apartments, condos and offices. The term Beltline comes from an early 20th-century streetcar route.

The 4th St. illumination project, created by Marc Boutin Architectural Collaborative and artist Krzysztof Wodiezko, was one of several design concepts considered by the city. According to the project proposal, “the introduction of animated light and colour, responding to the flow of people through the space, ensures the redesign remains evocative, varied and timeless… Integrated into the frame, the animated surface introduces a capacity for multiple readings and emergent experiences which amplify the city as a space for interaction. Activation of the wall surface is triggered by the presence of the body; in live time, animated light escorts visitors they move through the underpass. The capacity of sensors to detect movement and proximity enables visitors to deliberately augment the response of the light as they move through the space.”

Illuminate Calgary Underpass

The public art lighting strategy comprises three interrelated lighting components: 

• screen lighting: responsive, high-resolution, pixel-based fixtures; hosts the lighting narrative (between bridges)

• veil lighting: responsive, low-resolution, linear-based fixtures; extends the public art lighting strategy as an urban gesture (through the veil)

• frame lighting: non-responsive, low-resolution, linear-based; conditions the experience of the pedestrian through light (under bridges)

Both the veil and the screen lighting will respond to the presence of people in the space.

A portion of the funding — $2.2 million — will come from two development-funded sources: the Beltline Community Investment Fund and the city’s public art capital deposit program. 

Construction is scheduled to begin this summer and finish by the end of 2017.

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…