Guide to the Canadian Electrical Code, Part I — Instalment 17

September 12, 2016

William (Bill) Burr

In this article: Section 28 — Motors and Generators. The code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.

Section 28 is a supplementary or amendatory section of the code and provides additional and specific requirements for the installation, protection, and control of all motors and generators. Appendix B contains important additional helpful notes and the CEC Handbook contains helpful information on determining conductor sizes and protection ratings.

General

This section is divided into a number of parts, with rules 28-010 to 28-016 applying to all motors and generators, and additional parts that deal with specific installation, protection, control and particular motor applications and generators.

Rule 28-010 – Special terminology, has definitions for terms specifically used in this section:

Hermetic refrigerant motor-compressor is a unit in which the compressor and motor are within a single container with no external shaft or seals and the motor windings operate within the refrigerant atmosphere.
Locked rotor current rating, usually marked on the equipment or deemed equal to 6 times full load current or as per Table 44 or 45.
Non-continuous duty motor, a motor with short-time, intermittent, periodic or varying duty as per Section 0 definitions.
Service outlines definitions of various applications of motors such as continuous or non-continuous duty service as described above.
Service factor is a multiplier of the rating of a motor or generator indicating the permissible continuous loading that may be carried at a rated voltage and frequency.

Rule 28-012 provides for guarding live parts of motors and controllers and conditions where live parts may be exposed.

Rule 28-014 describes methods of guarding motors having exposed live parts.

Rule 28-016 outlines ventilation methods to prevent overheating of motors including using suitable enclosed motors in dust or flyings situations where ventilation is not possible.

Appendix B contains a diagram of circuits, control and protective devices for motors which you will find invaluable in determining the requirements for the type and rating of conductors, control, protection and other elements of motor circuits.

Wiring methods and conductors

Rules 28-100 and rule 28-102 state that all wiring methods for stationary motors follow the requirements of Section 12 or Section 36 – High-voltage installations, and that portable motors may be connected with a minimum type S flexible cord.

Rule 28-104 outlines the use of Table 37 to determine the insulation temperature rating and ampacity of motor supply conductors. Rules 28-106 to 28-112 outline the use of Table 27 to determine the ampacity rating of conductors supplying individual motors, two or more motors, feeder and secondary conductors. A chart in Appendix B will help with these calculations.

Overcurrent protection

Rule 28-200 provides the requirements for motor branch circuit overcurrent protection using either Table 29 or one of the options outlined in subrules (b) to (g). Again a chart in Appendix B will help with these calculations.

Rule 28-202 requires that, notwithstanding the options in 28-200 above, if the characteristics and ratings of the branch circuit overcurrent protection devices for motor control equipment are marked on the equipment, they shall not be exceeded.

Rule 28-204 specifies the conditions and methods for rating and setting feeder overcurrent protection.

Rule 28-206 permits the grouping of motors on a single branch circuit overcurrent device under the conditions outlined in subrules (a) to (f).

Rule 28-208 prohibits the size of fuseholders smaller than the maximum rating in Table 29 except under the conditions outlined in subrules (a) to (c).

Rule 28-210 governs the use, rating and adjustment of instantaneous-trip circuit breakers for branch circuit protection.

Rule 28-212 permits the use of semiconductor fuses where integral to an approved controller.

Overload and overheating protection

Rule 28-300 requires that, in addition to overcurrent protection as outlined in the rules above, the branch circuit conductors and control equipment of each motor, except with the conditions under 28-308 below, must have overload protection.

Rule 28-302 outlines the types of overload protection devices or fuses to be used.

Rule 28-304 prescribes the number and location of overload devices required, whether fuses or other devices, as specified in Table 25, are used. The note in Appendix B regarding the location of overload devices for three-phase motor circuits provides additional information.

Rule 28-306 provides that the rating or trip selection of overload devices shall be set for the service factor marked on the motor or 115% of full load current if not marked.

Rule 28-308 allows that overload protection for motors is not required under the conditions outlined in subrules (a) to (c).

Rule 28-310 permits the shunting of overload protection during the starting period of the motor provided that the overcurrent device is maintained throughout and the overload protection is restored to the circuit after the starting period.

Rule 28-312 prohibits automatic restarting of a motor after an overload shutdown to prevent injury to persons.

Rules 28-314 to 28-318 provides that overheating protection is required for each motor, the types of overheating protection required, and conditions where overheating protection is not required.

Undervoltage protection

Rule 28-400 states that undervoltage protection is required for motors to prevent hazards on restart either by low-voltage protection or low-voltage release depending on conditions outlined in subrules (a) or (b).

Control

Rule 28-500 specifies that a motor starter or controller is required with a horsepower rating not less than that of the motor and need not be the disconnecting means of the motor. Subrule (3) provides exemptions to this rule for specified applications.

Rule 28-502 requires the motor control to be in a location suitable to prevent accidents due to contact of persons with live or moving parts or to allow the machine to be stopped in an emergency.

Rule 28-504 requires that for starters having different running and starting positions the construction must not allow remaining in the starting position.

Rule 28-506 specifies that no accidental grounded control circuit conductor can cause the motor to start or prevent the stopping of the motor by a safety device.

Disconnecting means

Rule 28-600 requires that each motor branch circuit, starter or controller, and each motor be provided with a separate disconnecting means. A single disconnecting means may serve more than one function or motor grouped on a single branch circuit.

Rules 28-602 and 28-604 provide for the types, ratings, application and location of disconnecting means depending on the conditions outlined in subrules 28-604 (1) to (7).

Hermetic refrigerant motor-compressors

Rules 28-700 to 28-714 apply to hermetic refrigerant motor-compressors, and supplement or amend some of the other rules of this section. There are separate rules for marking, horsepower rated equipment, conductor ampacity, overcurrent protection, overload protection, control equipment, and disconnecting means for motors in this particular application.

Multi-winding and part winding-start motors

Rule 28-802 states that where the windings are in a permanent connection configuration, the motor is treated as a single winding motor.

Rules 28-804 to 28-812 provide for selecting the conductor sizes, overcurrent protection, overload protection, control and disconnecting means for multi-winding and part winding-start motors.

Protection and control of generators

Rule 28-900 specifies the configuration and provision of disconnecting means required for generators and all control apparatus and protective devices.

Rule 28-902 outlines the required protection for constant-voltage generators with noted exceptions.

Rule 28-904 requires a generator not driven by electricity supplying a 2-wire grounded system to have a protective device that disconnects both conductors.

Rule 28-906 requires balancer sets to have protective devices to disconnect the system in the case of an excessive unbalanced voltage.

Rule 28-908 provides requirements for circuit breakers and tripping elements on three-wire DC generators.

In the next instalment, we will be discussing Section 30 — Installation of Lighting Equipment.

* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA


Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11
Part 12: Guide to the Canadian Electrical Code, Part 1 — Instalment 12
Part 13: Guide to the Canadian Electrical Code, Part 1 — Instalment 13 
Part 14: Guide to the Canadian Electrical Code, Part 1 — Instalment 14
Part 15: Guide to the Canadian Electrical Code, Part I — Instalment 15
Part 16: Guide to the Canadian Electrical Code, Part I – Installment 16

 


William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

Related Articles


Latest Articles

  • Efficiency Nova Scotia Rebates

    Efficiency Nova Scotia Rebates

    January 24, 2025 NEW Up to 75% of product costs in rebates for energy efficient products or interest-free financing for up to 24 months. Get rebates Before You Buy, at the counter, or After You Buy with mail-in and instant rebates. Before you Buy Instant Rebates No paperwork required. Save at the counter when you… Read More…

  • The Drive Towards Energy-Efficient Data Centres

    The Drive Towards Energy-Efficient Data Centres

    Data centres are the backbone of our digital world. They serve as the foundation for various online activities like streaming, e-commerce, website/app usage, Digital transformation. Read More…

  • Multi-Unit Construction Intentions Push Down the Residential Sector for November 2024 Building Permits

    Multi-Unit Construction Intentions Push Down the Residential Sector for November 2024 Building Permits

    January 20, 2025 The total value of building permits issued in Canada decreased by $739.5 million (-5.9%) to $11.7 billion in November, a second consecutive monthly decline. The residential sector led the decrease, followed by the non-residential sector. On a constant dollar basis (2017=100), the total value of building permits issued in November declined 5.8% from the previous… Read More…

  • Ontario Save On Energy Home Renovation Savings Program

    Ontario Save On Energy Home Renovation Savings Program

    January 20, 2025 On January 7, the Government of Ontario announced 14 new and expanded energy-efficiency programs, including the Home Renovation Savings Program, as part of a new $10.9 billion investment in energy efficiency to help families and businesses save money. Save on Energy and Enbridge Gas, with endorsement from the Ontario government, have partnered to… Read More…


Changing Scene

  • Agence Ricard Welcomes New Business Development Specialist for the South Shore of Montreal 

    Agence Ricard Welcomes New Business Development Specialist for the South Shore of Montreal 

    January 24, 2025 Agence Ricard is proud to announce the arrival of Fred Dozois as new business development specialist for the South Shore of Montreal. With over 10 years of experience in the electrical industry, Fred brings an impressive wealth of knowledge and skills that will strengthen the team at Ricard.  Recognized for his expertise,… Read More…

  • Graybar Transforming Branches From Coast to Coast

    Graybar Transforming Branches From Coast to Coast

    January 24, 2025 Exciting transformations are happening at Graybar Canada. Across the nation, Graybar branches are getting a refreshed look, inside and out. These updates reflect their dedication to maintaining modern, welcoming spaces that showcase the strength of their brand and world class manufacturer partners. From sleek new shelving to vibrant wall murals, these renovations are designed… Read More…

  • New Address for Franklin Empire London, ON Branch

    New Address for Franklin Empire London, ON Branch

    January 24, 2025 Franklin Empire are pleased to announce the new address of their London, Ontario branch. Address:552 Newbold StreetLondon, Ontario N6E 2S5 Source Read More…

  • Ontario Launches Regional Economic Development Through Immigration Pilot Program 

    Ontario Launches Regional Economic Development Through Immigration Pilot Program 

    January 24, 2025  The Ontario government has launched the Regional Economic Development through Immigration (REDI) pilot program to target highly-skilled immigration for four rural and northern regions with a high demand for skilled labour: Lanark, Leeds and Grenville, Sarnia-Lambton, and Thunder Bay. REDI enables local employers in these communities to attract up to 800 additional… Read More…