Canadian Lighting Project Wins Prestigious International Award

Church

October 5, 2016

Lighting for Eglise Sainte-Agnès in Lac-Mégantic, Quebec has won a 2016 darc award in the category Structures —Best Exterior Lighting Scheme, High Budget. The awards were announced at a gala event in London, U.K.

Organized by mondo*arc / darc magazine, the darc awards are the first ever peer-to-peer system for a lighting design awards. Winners are determined by Independent architectural lighting designers and light artists. The Eglise Sainte-Agnès project was one of seven Canadian entries. The lighting was designed by Ombrages, using lighting products supplied by Lumenpulse.

The church, a landmark in Lac-Mégantic, stands as a symbol of solidarity and support to a community severely affected by the rail tragedy of July 6, 2013. Built in the beginning of the twentieth century, the Eglise Sainte-Agnès has a religious heritage recognized by the Quebec’s Ministry of Culture and Communications, and is made of up many beautiful architectural details, reliefs, materials and structural elements. Using light to enhance these individual elements helps to accentuate the distinctive and prestigious signature of the building.

To highlight the distinctive architectural elements, simplicity in the concept’s design was the key element. The selection of elements to highlight on the building, which colours to use, and what materials to accentuate, were approached with care, consideration, respectfulness towards the buildings heritage.

The stained glass windows of the church are lit by RGBW luminaires, allowing for a fantasy of colour where hues are representative of religious celebration. In the centre square out front of the church entrance, a projector equipped with a gobo projects star patterns on the ground in memory of the tragedy’s victims.

It was important that the lighting design compliment the church as a warm, soft and comforting place of gathering for the people of Lac-Még
antic. Ombrages’ design looks to make sure that the lighting concept respects this, and doesn’t change the nature of the Heritage’s architecture. Lighting up the church is also a symbol of pride, a way to bring back life to the heart of the city and increase tourist attraction for the community of Lac-Mégantic.

The lighting project respects the Mont-Mégantic Dark Sky Reserve guidelines. Ombrages carefully choose the light fixtures and made sure that specifications, such as beam angle, cut-off and blue light, were controlled to minimize the lighting pollution and preserve the stars’ observation. To date, this is the first building illumination done and approved by the International Dark- Sky Association (IDA).

For this project, Ombrages’ team expertise didn’t just create the lighting concept; the team has been involved from the beginning up to the official launch after completion. Ombrages produced lighting concepts through rendering, photometric calculations, lighting layouts and construction drawings, as well as programming of the different scenes on site.

Project overview

Project: Sainte-Agnès Church Lac-Mégantic

  • Location: Lac-Mégantic, Canada
  • Lighting design: Ombrages, Canada
  • Lighting Suppliers: Lumenpulse
  • Client: Fabrique de la Paroisse Sainte-Agnès de Lac-Mégantic
  • Additional design: Rémi Boucher / Réserve internationale de ciel étoilé du Mont-Mégantic, Canada

All Canadian short-listed entries

The darc competition has four established categories — Structures, Places, Spaces and Art — each split into low and high budget (over £30,000 on luminaires) so that smaller projects can compete on a level playing field in every category. Here are all the Canadian entries for the 2016 darc awards:

 

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…