Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)

Code Changes Roundup

Bill Burr

Read Part 2 Here

Often, users encounter situations where they find themselves at odds with the rules contained in the Canadian Electrical Code, Part I (the Code).These situations can occur for designers, consultants, installers, inspectors, manufacturers, students, instructors and standards developers alike, and usually result from a misreading, misunderstanding, misapplication or inability to locate the requirement that is needed or relevant to their tasks.

The Code is a comprehensive document. Sometimes, trying to find information quickly can seem quite daunting.Over the next series of articles, I will provide a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook2, but will hopefully provide some help in navigating the Code.

Introductory pages and preface

The first few pages contain the Table of Contents, the names of the main technical committee and sub-committee members, and the all-important information in the preface. Why is the preface so important? Well, the preface, in addition to a list of reference publications, explains how the Code is organized. This arrangement of the outline provides a road map to finding your way. With this tool you can direct yourself to the exact rule or sub-rule that is the subject of your quest.

The first guidepost, indicated in the preface, is that 

• Sections 0 to 16 and Section 26 are general sections that apply to all installations

• all other sections, which apply to specific situations, amend or supplement these general sections.

The usefuleness of this key distinction will become clearer later in our exploration. The preface doesn’t mention this, but Appendix A and C are normative (mandatory), and all the other appendices are informatory (non-mandatory) parts of the Code. The Tables and Drawings pages are also normative. 

Section 0

Moving on to Section 0, we discover the object and scope of the Code, and the definitions of terms contained in the code.

Object

The object states that this Code establishes safety standards for the installation and maintenance of electrical equipment, where consideration has been given to the prevention of fire and shock hazards, as well as proper maintenance and operation.It also notes that the Code addresses the fundamental principles of protection for safety contained in Section 13 of IEC 60364-1, which is the International Electrotechnical Commission (IEC) standard for low voltage installations (1000 volts or less). You can examine these principles in Appendix K.

We are made aware, by the Object statement, that compliance with the requirements of the Code and proper maintenance will ensure an essentially safe installation, as protection against electric shock, thermal effects, over-current, fault currents, and over-voltage will be met.Also noted is that alternatives to the Code that comply with the fundamental principles of IEC 60364-1 may also be used to achieve safe installations, but only if used in conjunction with acceptable means to assess compliance, by the authorities enforcing the Code.This provision is intended for and usually applies to an industrial installation, under a specific safety management program developed with the authority having jurisdiction. Since the Code is adopted into law by each jurisdiction, any amendments or alternatives must also be adopted into law in that jurisdiction.

Scope

As we move to the Scope statement, we discover that basically all electrical work and equipment is covered by the Code with the exception of

• installations employed by a utility in its function as a power or communication utility

• electric railways

• aircraft

• ships that are not connected to a shore supply for more than five months

If you are looking for rules that apply to a mine or quarry, there are additional requirements in CSA M421.

Definitions

Next up are the definitions. The definitions contained in Section 0 are for specific words or terms used in the Code to aid in understanding and interpretation. An ordinary dictionary meaning applies for any word or term that is not specifically defined in Section 0.These definitions apply generally throughout the CE Code. However, some sections also contain definitions that apply to terms used only in that particular section.It is very important that you check these definitions when reading any specific rules.Although you may have a general idea of the meaning of a term, the Code definition can sometimes affect the application of the rule. 

As an example let’s look at the definition of the word Approved(as applied to electrical equipment).It is generally acknowledged that electrical equipment needs to be certified by a certification organization to be approved.But wait! There’s more! According to the definition, that certification organization needs to be accredited by the Standards Council of Canada (SCC), and in addition, the product needs to be certified that it meets the requirements of

• CSA safety standards for electrical products (Part II standards), or

• other standards developed by an SCC accredited standards development organization (SDO) or other recognized documents where CSA Standards do not exist for that product.

In the case of non-CSA standards or other recognized documents, they must be correlated with the Code and also must not duplicate standards listed in Appendix A. The definition also conveys alternatively that equipment meeting the requirements of the regulatory authority is also considered approved. This normally refers to field evaluation by an accredited special inspection body that is recognized by the authority having jurisdiction and facilitates the approval of new or limited manufacture products. So you see, a lot of information is contained in this definition of Approved. The Appendix B note on this definition would also be very beneficial to the Code users.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • Future-Proofing your Business with Electrical Estimating Software

    Future-Proofing your Business with Electrical Estimating Software

    In today’s construction landscape, it’s crucial for construction business owners to seize every opportunity to future-proof their operations. Building a thriving electrical (or mechanical) contracting company entails more than just acquiring technical skills and setting up a business. Read More…

  • Ontario Drives Monthly Downturn in Residential Sector for March 2024 Building Permits

    Ontario Drives Monthly Downturn in Residential Sector for March 2024 Building Permits

    May 16, 2024 Month over month, the total value of building permits in Canada decreased 11.7% to $10.5 billion in March. Construction intentions in the non-residential component declined 16.7% to $4.0 billion, while the residential sector decreased by 8.3% to $6.5 billion. Declines were observed in all components except for the commercial component. On a constant dollar basis (2017=100), the total… Read More…

  • 25th Edition of the MEET Show Smashes Attendance Records

    25th Edition of the MEET Show Smashes Attendance Records

    May 16, 2024 By Electro-Federation Canada The energy and excitement was palpable at the 2024 edition of the MEET Show at the Moncton Coliseum on May 1 and 2. The biennial Mechanical, Electrical, Electronic, and Technology show – celebrating its 25th year in 2024 – saw record-breaking attendance, welcoming 6,626 industry professionals to one of… Read More…

  • Video: How to Easily Setup and Program Intermatic PE700 Series Wireless Timers

    Video: How to Easily Setup and Program Intermatic PE700 Series Wireless Timers

    May 10, 2024 Dive into the future & discover the ultimate convenience in pool & spa management with this “How to” video guide for setting up & programming the PE700 Series Pool & Spa Wireless Smart Timer, by Intermatic. Whether you are programming the 3-circuit model PE733P or the 2-circuit PE723P, this video is your… Read More…


Changing Scene

  • WOW Lighting and Controls adds Blink Charging to Line Card

    WOW Lighting and Controls adds Blink Charging to Line Card

    May 17, 2024 WOW Lighting and Controls are excited to introduce the newest addition to the Wow Lighting and Controls linecard: Blink Charging Co. Blink Charging Co. (Nasdaq: BLNK) is a global leader in electric vehicle (EV) charging equipment and services, enabling drivers, hosts, and fleets to easily transition to electric transportation through innovative charging solutions. Blink’s… Read More…

  • Join ECABC’s Call for Prompt Payment in BC

    Join ECABC’s Call for Prompt Payment in BC

    May 17, 2024 On Monday, May 6th, ECABC launched a campaign across its social media platforms to create awareness for the need for prompt payment laws in British Columbia, now. Year after year, BC’s lack of prompt payment has been the #1 issue for ECABC’s contractors. Why? Because prompt payment ensures that contractors and subcontractors receive… Read More…

  • ABB Invests in Ndustrial to Accelerate Decarbonization Through AI-Powered Energy Management Technologies

    ABB Invests in Ndustrial to Accelerate Decarbonization Through AI-Powered Energy Management Technologies

    May 17, 2024 ABB today announced a minority investment in Ndustrial, a US-based clean technology startup that has developed a leading-edge, AI-powered energy management platform. This innovative technology enables smarter, production-aware energy decisions in real time, helping customers reduce operating costs, optimize energy consumption and accelerate decarbonization. The investment was made through ABB Ventures. Financial… Read More…

  • Legislative Amendments Aim to Improve Benefits for Injured Workers in New Brunswick

    Legislative Amendments Aim to Improve Benefits for Injured Workers in New Brunswick

    May 17, 2024 The provincial government has introduced legislative amendments meant to improve benefits for injured workers and their families while ensuring sustainability of the workers’ compensation system. The changes, if approved, would apply to the Workers’ Compensation Act and the Firefighters’ Compensation Act. “We are proud to introduce changes that will see the amount payable to injured… Read More…