How to Build a Control System

Control System

Nov 3, 2020

By Jeremy Day

Building a control system for a modern lighting installation can seem like an impossibly complex task. To simplify it, a systematic approach to understanding the needs of the design, facility, and user can be employed. In this white paper, we aim to define the questions one must answer to construct an appropriate control system.

First, and perhaps counterintuitively, one must start with the control narrative. A lighting programming and control narrative is a document that is essential to coordinate the design/construction process with a fully realized final architectural product. It defines how lighting will integrate into the space and, ultimately, how humans will interact with that same space. With the direction of the narrative, the necessary functionality of the control system can be defined. Is the intent for lights to automatically turn on and off with an astronomical time clock? Should lights be dimmed via daylight harvesting? What kind of shows or effects are desired? The answers to these questions will directly determine the size and scale of the control system. Without this narrative, assumptions will have to be made. The balancing act will be between providing a highly flexible control system and a system that is adequately capable yet cost effective.

Questions to ask yourself

1. What is the standard order of operations for a normal day?

2. What special events or holidays need a special program or scene?

3. What happens automatically vs. what happens via manual intervention?

Second, the number of controllable zones must be determined. An outdoor façade installation may have a floodlights-only zone, or it could also include linear grazing fixtures as well as direct view elements. Each of these zones will need to be controlled independently, and the control system must be sized appropriately. 

Questions to ask yourself

4. How many individually controllable zones are there (e.g. downlights, cove, accent, indirect, colour per room)?

Of note, to create a dynamic lighting system, the number of channels needed to put the system together must be well understood. A channel is defined as a single controlled attribute. For simple dimming only lights, one channel would be needed to control that dimmed intensity. For tunable white lights, two or three channels would be needed to adjust intensity and colour temperature, depending on the exact configuration of that fixture. A colour changing RGBW light would most likely need four channels, one for each Red, Green, Blue, and White control.

A simple system composed of only a white light fixture with a dimmable, static colour temperature will need only one DMX channel per zone. A more complex system, such as a linear run of colour-changing RGBW fixtures, could potentially need four channels per foot (or even eight per foot in exceptional circumstances). Of course, if the control narrative is clearly defined as “this linear run will only fade from Colour 1 to Colour 2 in unison,” that would eliminate the need for individually addressed fixtures and could significantly reduce the cost of the control system.

Figure 1Figure 2

Another consideration is requirements for Input and Output (I/O) signalling and integration. Some common examples of these I/Os are:

• fire alarms
• emergency conditions
• building automation systems
• occupancy and daylight sensors
• shades
• wind or other atmospheric sensors
• A/V integration

The control narrative will describe the necessary interactions, but the physical locations and quantities of I/O will determine the number of interfaces in the control system. A system composed of only a few lights might still require a larger more sophisticated control system based purely on the complexity of the I/O needs.

Figure 3

Questions to ask yourself

5. How many of each control I/O are required and at what locations?

The next key component to consider is user interfaces: How will the users interact with the system, turn lights on and off, raise and lower, change colours, advance scenes, etc.? Where will these interactions take place? You might need a keypad at every office and door, but what about the exterior lights? Where will they be controlled? In addition to physical control stations like keypads and touchscreens, virtual control like web pages and smart devices need to be considered and allotted for. 

Questions to ask yourself

6. List each user interface, including keypads, touchscreens, web access terminals, smart devices.

Figure 4

Finally, a consideration to make is whether to base a control system off DMX/RDM (a digital, daisy chained system for smaller systems) or Ethernet (a highly flexible and scalable system for projects of all sizes and complexities). Below are some key advantages of each protocol.

[Figure 5

Now that the requirements of the control system have been defined, the type, scale, and specifics of the control system can be chosen. Often tiers exist in control systems, sometimes defined by the number of universes, user interfaces, or I/O triggering. One specific requirement may bump the system up into a higher tier. Having a complete understanding of the scope of the control system will ensure that all requirements are covered by the capabilities of the control system. Lumenpulse sales engineers are experienced in the consultation and execution of control systems of all sizes and are available to consult on the needs, options, and budgets of this critical element of all lighting systems.

Understanding of the desired functionality of the lighting system will help right-size the control system to meet all needs without overspending and overcomplicating a project. Control systems come in many shapes and sizes, with trade-offs in capabilities, cost, and complexity. Lumenpulse is here to help clients balance these elements and choose the correct system at the right price and feature set.

Jeremy Day is a Lumenpulse Application Engineering Director. This article was first published online by Lumenpulse: www.lumenpulse.com/knowledge/how-to-build-a-control-system

Related Articles


Latest Articles

  • EFC Supporting Industry Amongst Tariff Uncertainty

    EFC Supporting Industry Amongst Tariff Uncertainty

    As a major representative of the electrical and automation industry, Electro Federation Canada remains committed to supporting its members and the industry overall in navigating the complexities of international trade policies. Read More…

  • CanREA Launches New and Improved Go Solar Guide 2025

    CanREA Launches New and Improved Go Solar Guide 2025

    March 21, 2025 The Canadian Renewable Energy Association (CanREA) launched the 2025 edition of its annual Go Solar Guide today, encouraging Canadians to go solar. The 2025 version is new and improved: Now a web portal, it is free and accessible to everyone, anytime. “CanREA is proud to produce an annual consumer guide containing everything… Read More…

  • STANDATA Interpretation: 2024 Canadian Electrical Code, Part 1 Section 6 – Number of Supply Services Permitted

    STANDATA Interpretation: 2024 Canadian Electrical Code, Part 1 Section 6 – Number of Supply Services Permitted

    March 21, 2025 Purpose To clarify requirements for installations regarding the number of supply services permitted to be located on one unit of a building consisting of row housing for residential occupancies. Discussion There has been inconsistent application of the 2024 Canadian Electrical Code (CE Code) Part 1, Rule 6-102 regarding type and location where… Read More…

  • PEI Pauses Solar Electric Rebate Program

    PEI Pauses Solar Electric Rebate Program

    March 21, 2025 Rebate pre-approval letters for the Solar Energy Rebate program are currently on hold as the PEI government conducts a program review to ensure it continues to provide the best possible benefits to the most Islanders. We appreciate your patience. We do expect the program to be operational in the coming weeks. Check… Read More…


Changing Scene

  • Mersen Fuse Selection Guide

    Mersen Fuse Selection Guide

    March 21, 2025 Unlock Instant Access to the Mersen Fuse Selection Guide Learn how to match voltage ratings, nail amperage calculations, master interrupting ratings, and conquer temperature derating, all without breaking a sweat. Go HERE to download Read More…

  • EFC’s Business Sections Welcomes New Field Service Vice Chair

    EFC’s Business Sections Welcomes New Field Service Vice Chair

    March 21, 2025 EFC is pleased to announce Matthew De Ciantis, M&D De Ciantis Enterprises Inc., as the new Vice Chair of the Field Service Business Section. Matthew is a long-standing professional in the electrical industry who fulfilled many roles within his generational family electrical contracting company. Matthew’s experience and breadth of operational knowledge has… Read More…

  • EFC Welcomes New Manufacturer Member: NOARK Electric

    EFC Welcomes New Manufacturer Member: NOARK Electric

    March 21, 2025 NOARK Electric is a global manufacturer of low, medium and high low voltage electrical components for industrial applications. They specialize in providing electrical circuit protection and motor control solutions for OEMs, contractors, and distributors. Dedicated to quality and value, their mission is to deliver top-tier products at exceptional price, backed by world-class… Read More…

  • Mac’s II Agencies Strengthens Lighting Division

    Mac’s II Agencies Strengthens Lighting Division

    March 19, 2025 Mac’s II Agencies Announces Jamie Capell as the New Sales Manager for Lighting Specification Mac’s II Agencies is pleased to announce the expansion of its lighting division with the addition of Jamie Capell as the Sales Manager for Lighting Specification. Jamie brings 25 years of experience in the lighting and electrical industry, most notably… Read More…