Quebec Study Examines Sector Hazards and Strategies

Wind Energy Health Safety

Workers in the wind energy sector face a range of hazards and challenges, according to a new study released by Quebec’s Institut de recherche Robert-Sauvé en santé et en sécurité du travail (IRSST), one of Canada’s leading workplace health and safety research centres. Hazards and challenges include those associated with the mechanical aspects of wind turbines, cardiac risks, and electrical hazards associated with power circuits and control circuits, as well as getting access to company injury prevention plans and timely response from emergency services when performing winter work in isolated locations.

The wind energy sector is an emerging industry across Canada. In Quebec alone, an estimated 1,000 people work full time in the operation and maintenance of Québec wind farms, and another 2,000 are occasionally involved. Work at heights, in confined spaces, isolation, the absence of nearby emergency assistance, the physical requirements to climb towers, work at very low temperatures, and electrocution risks are many of the occupational health and safety challenges in this sector.

This study analyzes the accidents and critical incidents that have occurred in this sector, and injury prevention practices of wind farms located in Quebec and elsewhere in the world. In the process, the researchers created a scientific database on the typical risks to which this sector’s workers are exposed.

To analyze on-site working conditions, the researchers observed technicians performing their operation and maintenance tasks, as well as construction companies and subcontractors during the wind farm construction phase. These observations supplemented the data collection and helped characterize work hazards and procedures.

In many cases, it was noted in the field that only company managers have access toan injury prevention plan.Workers and technicians are aware that a plan exists, and some have read a summary of it, but they have problems getting access to the plan’s detailed guidelines and protocols. In other words, the company can meetgovernment requirements and show that a plan exists, but few workers know its detailed provisions.

The study is believed to be the first to create a health and safety profile of people connected to the industry. Researchers found that injury statistics are fragmentary and injury prevention programs in the industry are “an odd assortment and come in many forms, often simply borrowed from wind turbine manufacturers.” Nor did the researchers find clear, instructive examples of related practices elsewhere in the world. They recommended that companies shift towards implementing adapted prevention plans that comply with Quebec legislation and CSST requirements. In broader terms, the jurisdiction in which the companies are operating.

The project has resulted in a number of changes and advances in workplace accident prevention at several wind energy organizations and companies, the study says.

Find out more: http://www.irsst.qc.ca/en/publications-tools/publication/i/100813/n/wind-sector-safety-risks-prevention-strategies-r-858

 

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…