Energized Electrical Work Permit YES or NO?

EIN author TerryBecker 400

November 11, 2021

By Terry Becker, P.Eng., CESCP, IEEE Senior Member

All energized electrical work tasks performed require an Energized Electrical Work Permit (EEWP) to be issued, unless exempted as outlined in the CSA Z462 Workplace electrical safety Standard, Clause 4.3 Work Involving Electrical Hazards.

Ensuring your company’s Electrical Safety Program clearly documents the EEWP policy, process and exemptions will ensure clarity and value added in eliminating exposure to arc flash and shock hazards and doesn’t result in unnecessary bureaucracy.

The CSA Z462 Workplace electrical safety Standard has always required that an Energized Electrical Work Permit (EEWP) to be issued for all energized electrical work tasks unless exempted.  The problem is miss interpretation in industry of this requirement related to the justification for energized electrical work if an Electrically Safe Work Condition cannot be established.  This misunderstanding can also be linked to the CE Code Part I, Rule 2-304 Disconnection which in some Provinces has unfortunately been miscommunicated to industry and misunderstood that it is against the law to have a Qualified Person perform any energized electrical work tasks.  This CE Code Part I rule does not prohibit energized electrical work, it in fact points to CSA Z462 in reference to the rule.

In CSA Z462 Clause 4.3.2  Energized Electrical Work Permit it states:

“When work is performed as permitted in accordance with Clause 4.1.6.2, an energized electrical work permit shall be required and documented under any of the following conditions:

  1. When work is performed within the restricted approach boundary; or
  2. When the worker interacts with the equipment when conductors or circuit parts are not exposed but an increased likelihood of injury from an exposure to an arc flash hazard exists.”

An example EEWP is illustrated in Figure 1 below, based on the recommendations of CSA Z462 Clause 4.3.2.2.  If the EEWP process is understood correctly an EEWP would be required rarely and specific only to justified energized electrical equipment repair or alteration related work tasks (reference CSA Z462 Table 2, removal or installation of circuit breakers, insertion or removal individual starter buckets from MCC, insertion or removal of plug-in devices into or from busways).

Figure 1 – Example EEWP based on CSA Z462 Clause 4.3.2.3.2

 EEWP 2

 

Some of the incorrect interpretation and misinformation in industry is most likely based on information provided in generic CSA Z462 “arc flash awareness” or “arc flash training.”  Ultimately employers need to review the CSA Z462 Workplace electrical safety Standard directly in developing and implementing a compliant Electrical Safety Program and ensuring they clearly understand what CSA Z462 is requiring as a mandatory practice or policy.   Additional interpretation with respect to when an EEWP is actually required should be undertaken.

With respect Clause 4.1.6.2 Energized Work CSA Z462 outlines when energized electrical work can be performed if an “Electrically Safe Work Condition” cannot be established.  Energized electrical work tasks can be performed when the employer can demonstrate that de-energizing:

  1. Introduces additional hazards or increased risk, or
  2. When the work task to be performed is infeasible in a de-energized state because of equipment design or operational limitations, or
  3. Electrical equipment operates at ≤30VAC or ≤60VDC.

When I review the requirements for an EEWP related to policy requirements in an employer’s Electrical Safety Program I ensure that a review of when the electrical equipment can be turned off and isolated is analyzed.  Does the employer’s business allow for electrical equipment be turned off after 5PM where the business is not a continuous process?  Is there an opportunity to schedule work where a short duration shutdown can be planned for not only electrical equipment maintenance but process/mechanical equipment maintenance?  How urgent is it to add additional circuit breakers to panelboards?  Ultimately our goal is to eliminate any energized repair or alteration related work tasks on electrical equipment.

Currently in CSA Z462 exemptions are listed when an EEWP is not required.  Clause 4.3.2.3 Exemptions to Work Permit, identifies the following exemptions as long as the Qualified Person is provided with and uses appropriate safe work practices and PPE in accordance with CSA Z462 Clause 4 Work Involving Electrical Hazards:

  1. Testing, troubleshooting, or voltage measuring;
  2. Thermography, ultrasound, or visual inspections if the restricted approach boundary is not crossed;
  3. Access and egress to an area with energized electrical equipment if no electrical work is performed and the Restricted Approach Boundary is not crossed; and
  4. General housekeeping and miscellaneous non-electrical work tasks if the Restricted Approach Boundary is not crossed.

What I find in industry across Canada when I work with employers to develop an Electrical Safety Program is there is a belief that an EEWP is required for all energized electrical equipment work tasks related to operating, switching or maintenance.   Even to enter a defined electrical room an EEWP would be required.  This is not true.  It is recommended that other specific work tasks should are reviewed by the employer and additional work task exemptions that would not require an EEWP to be issued are included in the employer’s Electrical Safety Program.  This will add clarity with respect to operating energized electrical equipment, and to ensure the EEWP doesn’t become a bureaucratic process when it shouldn’t be.

By adding exemptions for additional work tasks related to operating, switching and maintenance work tasks that are justified it clarifies for Management, Supervision and Qualified Persons when they DO NOT require an EEWP.  An employer could document additional exemptions based on infeasibility due to equipment design:

  1. Opening or closing a hinged door.
  2. Removing or installing a bolt on cover.
  3. Racking in or out power circuit breakers.
  4. Installing temporary protective grounds.
  5. Battery terminations.

As an example besides stating the exemptions a decision making flow chart as illustrated in Figure 2 below could be provided as a visual aid when communicating to staff and contractors when an EEWP would be required or not.

Figure 2 – EEWP Decision Making Flow Chart

 

TW Fig2 2

 

 

It is important that as we continue in industry across Canada to ensure shock and arc flash hazards are identified, risk assessments completed, and additional protective measures implemented to reduce risk if we cannot eliminate exposure that we ensure we do not shutdown industry with misinterpretation or conservative application of CSA Z462’s requirements.  CSA Z462 has made a significant positive impact on elimination and risk reduction when energized electrical work tasks are justified and completed, but needs to be specifically interpreted and applied through an employer’s Electrical Safety Program.

 

Related Articles


Latest Articles

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…

  • Why Choosing the Right USB Charger Matters

    Why Choosing the Right USB Charger Matters

    December 1, 2025 Not all USB Chargers are Created Equal As the number of devices used daily increases, so does the need for a charger that delivers safe speeds and maximum charging potential. A high-quality USB charger delivers efficient charging without risk of damage, but the sea of USB chargers and outlets available on online… Read More…

  • How Homebuilding Incentives Can Pay Off for Cities, Homeowners and Local Economies: New Concordia Study

    December 1, 2025 A new study from Concordia University’s John Molson School of Business finds that improving housing affordability isn’t just a social good — it’s an economic growth opportunity. Build and Benefit: How Homebuilding Incentives Can Pay Off for Cities, Homeowners and Local Economies reframes housing policy reform as a sustainable fiscal growth strategy, demonstrating meaningful… Read More…

  • The Importance of HazLoc LED Lighting for Safe Workplaces

    The Importance of HazLoc LED Lighting for Safe Workplaces

    November 30, 2025 By CSC LED In Canada’s industrial lighting sector, one of the most critical yet often overlooked safety components is lighting designed specifically for hazardous locations, otherwise known as HazLoc (hazardous location) LED lighting. For workplaces dealing with flammable gases, vapours, combustible dust, or ignitable fibres, standard LED fixtures simply don’t cut it…. Read More…


Changing Scene

  • Skills Ontario Celebrates the Expansion of Trades & Tech Truck Program

    Skills Ontario Celebrates the Expansion of Trades & Tech Truck Program

    December 1, 2025 Skills Ontario is expanding its fleet of Trades & Tech mobile unit thanks to support from the Ontario Government. The government announced this morning it’s investment in Skills Ontario to expand experiential opportunities for Ontario’s future workforce.    “Ontario’s future relies on a strong, skilled workforce,” said David Piccini, Minister of Labour, Immigration,… Read More…

  • BC’s Canadian Mutual Recognition Agreement aims to Facilitate Interprovincial Trade

    BC’s Canadian Mutual Recognition Agreement aims to Facilitate Interprovincial Trade

    December 1, 2025 A new agreement signed by all provinces, territories, and the federal government will break down interprovincial trade barriers, making it easier for B.C. businesses to sell products across Canada, and for people to buy Canadian-made goods.   “When threats to Canada’s economic security land at our doorstep, we’re at our best when we work together as… Read More…

  • EB Horsman’s Commitment to Giving Back – A Year in Recap 2024/2025

    EB Horsman’s Commitment to Giving Back – A Year in Recap 2024/2025

    December 1, 2025 EB Horsman Cares is the company’s community engagement program that supports local children’s hospitals, communities, and non-profit initiatives with donations, fundraising, volunteering, and scholarships.  Since 1993, BC Children’s Hospital has been the primary recipient of EB Horsman & Son’s fundraising. However, as EB Horsman has continued to expand its businesses across Western… Read More…

  • Build Canada Homes Introduces Policy Framework to Guide its Investments in Affordable Housing

    Build Canada Homes Introduces Policy Framework to Guide its Investments in Affordable Housing

    December 1, 2025 Central to that work, the Government of Canada is stepping up with the recently launched Build Canada Homes, new federal agency with a mandate to scale up the supply of affordable housing across Canada. Build Canada Homes will also help fight homelessness by building transitional and supportive housing – working with provinces,… Read More…