BC Hydro Energy Storage Incentive

August 18, 2025

Energy storage systems (ESS) provide reliability and resiliency for businesses and the grid alike while helping to reduce GHG emissions as an alternative to diesel backup generation. Storing energy can help manage peak demand charges, reduce peak loads on the grid and provide electricity during outages. 

The offer

BC Hydro are offering incentives to their business customers to support the acquisition, installation, and operation of ESS. Once installed, BC Hydro will have the ability to dispatch the ESS automatically in response to changing conditions on the grid. These dispatch signals trigger the battery to discharge, powering the facility it’s attached to and reducing demand on the grid. The battery will then recharge later in the day or at night.

How it works

The incentive provided is based on the amount of battery capacity the customer nominates to be available for demand flexibility or demand response events.  The incentive is calculated as the lesser of:

  • $10,000 X kW nominated
  • $10,000 X kWh/4 nominated
  • 80% of eligible project costs.

Eligibility

To be eligible for BC Hydro’s energy storage incentive (ESI), customers must meet the following criteria:

  • Be on a general service or irrigation rate under the Electric Tariff.
  • Plan to install a new battery. Batteries that have already been purchased
    or installed are not eligible.
  • Have an operating smart meter
  • Must complete applicable net metering or generator interconnections process. Systems must be non-exporting to the grid.
  • Must install and energize an ESS that meets all the system requirements of the program within 24 months of completing a distribution generator interconnections facility study or the net metering application process.
  • Agree to a 10-year contract to provide demand flexibility services via the ESS to BC Hydro.
  • Provide reliable demand flexibility year-round within the following
    parameters:
    • Maximum duration (hours /event): 4
    • Maximum daily frequency: 2
    • Minimum hours between events: 5
  • Must reliably respond to flexibility dispatch events. Performance is considered reliable when the ESS is charged to provide at least 85% of its nominated capacity for 85% of all demand response events, as measured at the start of the event. Reliability is assessed annually.
  • Must connect to BC Hydro software platform via IEEE 2030.5, SCADA, established API or other method approved by BC Hydro to receive event signals.

How to apply

See BC Hydro’s energy storage system (ESS) application process [PDF, 96 KB] for details. You’ll also need our incentive application workbook [XLS, 167 KB] to begin the process. 

Resources

For more information, see our Customer manual – Energy storage systems [PDF, 635 KB].

Note

Tesla products are not eligible

The Government of B.C. and BC Hydro are taking action to preference Canadian goods in our rebate programs going forward and to exclude, where practicable, U.S. produced goods. As of March 12, 2025, Tesla products are not eligible for Energy Storage Incentive offer. If you’re already reviewing Tesla products as a solution for your energy storage system needs, please note that the requirements and technical specifications can readily be transferred to another manufacturer/ vendor.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Mac’s II Agencies Re-Envisions EV Charging Solutions with Two Leading Brands

    Mac’s II Agencies Re-Envisions EV Charging Solutions with Two Leading Brands

    April 9, 2026 Mac’s II Agencies has announced a strategic revision of its electric vehicle charging portfolio with the addition of Wallbox, and an expanded partnership with RVE. These partnerships position Mac’s II Agencies to deliver end-to-end EV charging solutions for residential developments and commercial applications throughout British Columbia and Yukon in a whole new way. Since Read More…

  • EB Horsman Introduces New Lower Mainland District Manager

    EB Horsman Introduces New Lower Mainland District Manager

    April 9, 2026 EB Horsman is pleased to announce the appointment of Shane Smith as Lower Mainland District Manager, effective April 1, 2026. With nearly two decades of experience at EB Horsman & Son, Shane has built a strong foundation across multiple areas of the business. Since joining the company in 2007, he has progressed Read More…

  • Nominations are Open for NETCO 2026 Leadership Excellence Award

    Nominations are Open for NETCO 2026 Leadership Excellence Award

    April 9, 2026 NETCO is pleased to announce that nominations are now open for the 2026 Leadership Excellence Award. Established in 2016, this national award recognizes an individual who has made outstanding contributions to apprenticeship training and continuing electrical training across Canada. The recipient is honoured annually at the NETCO National Training Conference. NETCO are seeking nominations for Read More…

  • Bartle & Gibson Announces New Partnership with Eaton

    Bartle & Gibson Announces New Partnership with Eaton

    April 9, 2026 Bartle & Gibson Co. Ltd., an Alberta-based premier distributor of plumbing, heating, and electrical products, and Eaton Industries (Canada) Company have announced a new regional partnership that expands access to Eaton’s electrical solutions across Western Canada. This agreement enables customers throughout the Western provinces to procure a broad range of Eaton products, Read More…