Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

provincial and federal government oil to electric rebate

August 16, 2024

The new Western Memorial Regional Hospital in Corner Brook is home to Canada’s largest geothermal system, which has set a precedent for modern infrastructure for both Newfoundland and Labrador and North America. The geothermal field is approximately 600 feet below the hospital’s parking lot, and provides 100 per cent of the ground source geothermal heating for the hospital – the largest solution of its kind for a health care facility in North America.

With efficiency and cost-savings at the forefront, this groundbreaking system provides approximately 12 per cent total cost savings over the life span of 30 years. The geothermal system was also key in eliminating cooling towers at the hospital, saving up to two million gallons of water per year.

Memorial
Western Memorial Regional Hospital – Photo Credit: Julian Parkinson – Photo source

The Leadership in Energy and Environmental Design® (LEED®) Silver Certification is issued by the Canada Green Building Council, LEED®, an international symbol of sustainability excellence and green building leadership. LEED® certification provides independent, third-party verification that a building project was designed and built, or operated, to achieve high performance in six areas of human and environmental health:

• Location and transportation
• Sustainable site development
• Water savings
• Energy efficiency
• Materials selection
• Indoor environmental quality

The new Western Regional Memorial Hospital was constructed and officially handed over by the Corner Brook Health Partnership (CBHP) to the province in November 2023. NL Health Services is now in operational control of the facility and opened the new hospital to the public earlier this spring.

The Corner Brook Health Partnership is comprised of the following members:

• Developer: Plenary Americas
• Design-builder: PCL/MARCO, A Joint Venture
• Architects: Parkin/B+H, A Joint Venture
• Facilities Management: Johnson Controls Inc.
• Mechanical/Electrical Subcontractors: Cahill Plan Group JV
• Structural Consultant: WSP Canada Group Limited
• LEED Consultant: Footprint
• Geothermal: Geosource Energy

Source

Related Articles


Latest Articles

  • Navigating Tariff Uncertainty as an Electrical Contractor

    April 15, 2025 By Matthew Biswas These three words put me into a catatonic shock – Supply Chain Disruption. It seems like just yesterday I was standing at a counter asking for products I’d bought 100’s of times before and being told they are on backorder with no expected delivery date. Circuit breakers, dimmers, panels,… Read More…

  • Four Ways Permanent Power Enahnces Outdoor Spaces

    Four Ways Permanent Power Enahnces Outdoor Spaces

    April 14, 2025 Today’s workplaces are expanding beyond the four walls of an office. As technology continues to evolve, employees are looking for new and alternative workspaces to inspire creativity and increase productivity. This includes taking their work to outdoor spaces. Bringing technology to outdoor spaces has become a challenge for facility managers and property… Read More…

  • CAF-FCA Provides Recomendations on Apprenticeship Investment

    CAF-FCA Provides Recomendations on Apprenticeship Investment

    April 13, 2025 CAF-FCA have provided an outline of actionable recommendations—developed through national consultation—to enhance accessibility, reduce financial barriers, and better align apprenticeship training with industry needs. Source Read More…

  • New Report: Preparing Alberta’s Buildings for Severe Weather

    New Report: Preparing Alberta’s Buildings for Severe Weather

    April 13, 2025 Alberta is facing more severe weather events, with rising temperatures, wildfires, and more frequent extreme storms threatening homes and businesses. Our report, Preparing Alberta’s Buildings for Severe Weather−written in partnership with the Alberta Ecotrust Retrofit Accelerator program−highlights the need for deep retrofits to ensure the province’s buildings can withstand these changing conditions. Four… Read More…


Changing Scene