Siemens 600V Meter Centre — Made in Canada for Canada

Siemens Meter Centre

Designed in Canada, Siemens’ new 600V Meter Centre offers an ideal solution for restricted space projects. Each meter stack houses features designed with the contractor in mind, to maximize productivity and minimize labour costs for shopping centres, condominiums and industrial complexes.

The 600V Meter Centre incorporates feedback from Canadian contractors experienced with 600V meter centres. To generate feedback, Siemens hosted a workshop at its Drummondville, PQ plant, where participants reviewed preliminary design/prototype and specific regional customer needs.

Features and benefits

Compact design: Compact 4 meter socket configuration allowing up to 200A sub-service capacity.        

Flexibility:All 600V meter stacks are of uniform design with flexibility in mind. Meter sockets rated for 200A max allowing sub-service capacity from 70 to 200A in one column.         

Ease of installation: Large and accessible wireway separated from meter area to facilitate cabling at 600V and easy access to horizontal bars connections and bottom plate to simply the installation process.     

Cold metering: Siemens meter centres are designed for cold metering. In cold metering, the sub service breakers are connected on the line side of the meter sockets, protecting the meter and all electrical equipment fed.
Manufactured in Canada: Fast delivery, better service and easy access to a full range of accessories and replacement parts.

Find out more: www.siemens.ca/metercentres

 >> Source ALL of your Canadian Electrical products in the Goldbook Directory <<

Other Products:

Siemens Launches FirstSurge Total Home Surge Protection

Siemens: Quick Ship Program for SMP Switchboard Products

Siemens Integrated Power Systems (IPS) Switchboards: Compact Solution Saving Time and Cost

Siemens P3 Type Lighting Panel

Siemens Canada Power Product Podcast Series: SentronMolded Case Circuit Breakers (MCCB)

Related Articles


Latest Articles


Changing Scene

  • Mac’s II Agencies Strengthens Lighting Division

    Mac’s II Agencies Strengthens Lighting Division

    March 19, 2025 Mac’s II Agencies Announces Jamie Capell as the New Sales Manager for Lighting Specification Mac’s II Agencies is pleased to announce the expansion of its lighting division with the addition of Jamie Capell as the Sales Manager for Lighting Specification. Jamie brings 25 years of experience in the lighting and electrical industry, most notably… Read More…

  • RENO Lighting Announce New Vice President of Sales

    RENO Lighting Announce New Vice President of Sales

    March 19, 2025 It is with great excitement that RENO introduce Jean-Claude Lespérance as Vice President of Sales at RENO Lighting. With over 35 years of experience in the Canadian electrical industry, Jean-Claude brings unrivalled knowledge of the market and strong relationship with key industry stakeholders, suppliers, and customers. Holding a college diploma in Electrodynamics… Read More…

  • Canada Invests in Deep Energy Retrofits for Affordable Housing in Hamilton

    Canada Invests in Deep Energy Retrofits for Affordable Housing in Hamilton

    March 13, 2025 There is a need and an opportunity for Canada to strengthen energy security and affordability for all Canadians. Canada’s buildings sector is the third-largest contributor to greenhouse gas emissions across the country. By increasing the scale and pace of building retrofits, we can make homes and buildings more energy-efficient and improve reliability in units.  The federal… Read More…

  • Tesla Products Excluded from BC Hydro Incentive Program

    Tesla Products Excluded from BC Hydro Incentive Program

    March 13, 2025 CBC has reported that BC Hydro is excluding Tesla products from their EV charger incentive program. However, products purchased prior to March 12 will still be eligible. “As of March 12, Tesla chargers, energy storage batteries and inverters are not eligible for rebates, according to B.C. Hydro. Those who have purchased or… Read More…