Eaton HALO Home Internet Access Bridge

Eaton

 

October 12, 2018

The HALO Home Internet Access Bridge (Bridge) enables you to control your HALO Home devices and accessories from anywhere in the world. The Bridge establishes a secure connection between your local Bluetooth network and the HALO Home Cloud, enabling you to take advantage of an ever-increasing lineup of Cloud services, including Amazon Alexa and Google Assistant.

Wireless router and Internet connection are required.

Key features include;

Wireless System

–  Utilizes Bluetooth Mesh 4.0

–  Wireless range of up to 50 feet of closest HALO Home Bluetooth devices and Wi-Fi router.

– 4GHz signal frequency

Features

–  Using the HALO Home app and the HHIAB each lighting fixture has the ability for:

– Control your lighting system from anywhere in the world

– Control your lighting system using Amazon Alexa and Google Assistant

Integration

–  HHIAB allows for integration and control of any Halo Home device through the following Cloud services; Amazon Alexa, Google Assistant

Indicators

– Bluetooth and Wi-Fi LED indicators inform you once connection is made

Manual Reset

– Manual reset button located on the device to reset to factory settings

Driver

– For use with 110/220V compatible sockets

Compatible Products

– Any HALO Home lighting device and the HALO Home app

Compliance

– cULus listed

– EMI/RFI emissions per FCC 47CFR Part 15 consumer limits

Warranty

Five-year limited warranty

For more information http://www.cooperindustries.com/content/public/en/lighting/connected_systems/halo_home/_939000.html

 

 

Related Articles


Latest Articles


Changing Scene

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…

  • Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    July 31, 2026 Toronto Pearson has announced contracts to NORR-DIALOG and PCL Construction, who will design and construct another major infrastructure program. The $1.5-billion investment to launch the Terminal 1 and Terminal 3 Revitalization Program has been awarded to NORR-DIALOG, a joint venture between two firms both Ontario-incorporated, and PCL Construction, a global firm created and headquartered… Read More…

  • D.A.D. Sales Welcomes new Team Member – Tom Graham

    D.A.D. Sales Welcomes new Team Member – Tom Graham

    July 31, 2026 D.A.D. Sales announced the addition of Tom Graham as Construction Sales Representative on the D.A.D. Sales team, supporting Northern Alberta. “Tom brings valuable industry experience, a strong understanding of the construction market, and firsthand insight as a skilled tradesman. He understands our customers’ businesses and the realities they face in the field.… Read More…

  • Franklin Empire Opens New Full-Line Branch in Peterborough

    Franklin Empire Opens New Full-Line Branch in Peterborough

    July 31, 2026 Franklin Empire is pleased to announce the opening of their new Peterborough branch, bringing together electrical, automation, and Process Instrumentation expertise under one roof. This new location expands their ability to better serve contractors, industrial facilities, OEMs, municipalities, and commercial customers throughout the Peterborough region with a complete range of products, technical… Read More…