Underwriters Laboratories Grants UL 67 Approval And UL 60730-1 Certification To Koolbridge Solar For Its First-Ever Renewable Energy SMART LOAD CENTER

KoolBridge SMartLoad 400

Mar 8, 2019

Koolbridge Solar announced that its renewable energy product, the SMART LOAD CENTER (SLC), has been awarded UL (Underwriters Laboratories) approval.  UL is the world leader in advancing safety sciences and achieving the UL 67 and UL 60730-1 listing marks a breakthrough for the young North Carolina company.

“Being awarded UL 67 and UL 60730-1 certification for our SMART LOAD CENTER is up there as being one of my greatest accomplishments to date”, said Dr. Paul W. Dent, Founder, Chief Scientist and Director of Koolbridge Solar.  “Comparing this achievement to the 30+ patents that have been granted and/or filed on behalf of Koolbridge, as well as to the additional 350+ US Granted Patents and over 1,000 International patents granted in my name, I feel that this accomplishment is the highlight of my career.  I am very thankful for the proud team of electrical, mechanical and software engineers who greatly contributed to the success of this renewable energy product.”   Dr. Dent is considered the #1 patent inventor in the world for wireless communication technology according to Wikipedia’s List of Prolific Inventors.

The SMART LOAD CENTER provides Data Collection, Reporting, Monitoring, and Engagement by integrating today’s state of the art technology into a traditional breaker box format resulting in a solution that seamlessly provides a Residential Distributed Energy Software Management Solution for both solar and grid-based electricity throughout the home on a branch circuit-by-circuit basis.

Even when solar and grid power are both available, the intelligence built into the SLC gives preference for using someone’s own, free solar power by switching as many breaker circuits to solar as it can at that time.

Once full production begins, the SMART LOAD CENTER will be made available initially through US Solar Installers, Dealers and Resellers. 

The Koolbridge Solar SMART LOAD CENTER is a one of a kind intelligent breaker box with the following features:

  • Preset User Priorities – prioritizing loads to match available solar power to home power demand
  • Minimize reliance on the electrical grid
  • Maximizes use of your own free solar power
  • Communicates with PCs or laptops
  • Displays current and historical power usage by time, per circuit and per energy source
  • Time-of-day dependent operations may be programmed
  • Peak Demand Control
  • Real-time appliance power usage
  • Battery technology agnostic
  • Inverter agnostic (inverter must be a load-supporting inverter and inverter and battery must be compatible)
  • Integrated tracking of energy utilization independently for each branch circuit
  • Coordination of total load on inverter and grid to avoid falling foul of time-of-use tariffs
  • Dynamically adjusts loads to match the power available
  • Fits flush between 16” spaced wall studs in standard US wood frame construction

Go HERE for more information

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…