Recessed Floor Box Kit for Existing Floors

Arlington FLBR5 400

Apr 12, 2019

Arlington’s NEW FLBR5420 series RECESSED FLOOR BOX KITS feature TWO low voltage openings, ULTRA-THIN stamped steel flange – and FLUSH-to-the-floor in-use and blank covers.

An ultra thin flange and recessed wiring device reduce the trip hazard caused by protruding plugs. You’ll have power and TWO low voltage openings, without a divider – And easy Installation with a 5″ hole saw.

Installation is quick and easy with a 5″ hole saw. Four mounting wing screws attach the 24.5 cubic inch box securely to the floor.

• UL Listed 20A tamper-resistant decorator-style receptacle.
• Covers: SIX finishes/colors Metal in brass-plated, nickel-plated and antique bronze-plated zinc.

Go HERE for more information

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Pool Bonding Requirements

    Winnipeg Information Bulletin: Pool Bonding Requirements

    May 4, 2026 Pool bonding is electrical work and thus requires an electrical permit. Section 68 of the Manitoba Electrical Code (MEC) outlines rules for electrical installations and equipment in or adjacent to pools, tubs, and spas, focusing on reducing the risk of electrical shock in wet environments, and establishing an effective equipotential plane. A Read More…

  • Common Lighting Pitfalls and How to Avoid Them

    Common Lighting Pitfalls and How to Avoid Them

    May 4, 2026 By CSC LED Fast-paced projects leave little room for error. Even experienced teams can encounter common lighting pitfalls that slow down installs, create uneven results, or add unnecessary costs. Understanding what to look out for—and planning ahead—can save time, reduce rework, and improve the final outcome. Here are five areas where projects Read More…

  • HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    May 1, 2026 In multifamily buildings, the electricity meters are supplied by transformers or by the main electrical service panel, whose capacity has not initially been planned to supply an electric vehicle charging infrastructure for 100% of the units simultaneously. RVE’s HUB is an energy management system (EVEMS) that eliminates the need to upgrade electrical infrastructure; Read More…

  • ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    May 1, 2026 This proposed change intends to reflect the current industry trend towards increasing standard equipment sizes of inverters, commonly reaching values greater than 10kW, and supports harmonization within the industry. The OEB (Ontario Energy Board) issued proposed amendments in October 2025 which included increasing the maximum threshold capacity for a micro-embedded generation facility Read More…


Changing Scene