E36300 Series Programmable DC Power Supplies from Keysight Technologies

Keysight dcpower 400
The E36312A/GPB from Keysight Technologies is an E36300 series triple output programmable DC power supply. Besides 0.01% load and line regulation, the E36312A can also maintain a steady output when power line and load changes occur, giving more peace of mind. It features more convenient and productive with intuitive and easy to use front panel interface.
 
The 4.3” LCD colour display can show the voltage and current of all three channels at the same time and the colour coded channel also simplifies manual set-up. It has low current measurement (< 80µA), low acoustic noise (< 50dB), 0.36mV/0.3mA (CH1), 1.5mV/0.1mA (CH2&3) programming resolution and 0.24mV/0.2mA (CH1), 1mV/160µA (CH2), 1mV/80µA (CH3) readback resolution.
 
The E36312A features data logger, output sequencing, output LIST mode, auto series/parallel mode, convenient front and rear output terminals, improved measurement accuracy with 4-wire sensing, front panel USB, digital I/O port and electrically isolated outputs.
 
  • 80W power output, 0 to 6V/0 to 5A (CH1), 0 to 25V/0 to 1A (CH2), 0 to 25V/ 0 to 1A (CH3) DC output
  • More test throughput via connectivity and easy to use SCPI programming language
  • More protection for device under test (DUT), 100, 115 or 230V AC input (±10%), 47 to 63Hz, 250VA
  • Two individual knobs for voltage and current, less cost and saves space with independent outputs
  • USB 2.0, LAN, GPIB interface, transient response time of < 50µsec, built-in battery back-up RTC
  • UL 61010-1 3rd edition, CAN/CSA-C22.2 no61010-1-12, IEC 61010-1:2010 3rd edition safety approvals
  • < 350µVrms/2mVpp output ripple and noise (20Hz to 20MHz) in normal mode voltage
  • 0.03% +2mV /0.04% + 3mA (CH1), 0.03% +5mV/0.04% +2mA (CH2, 3) programming accuracy
  • 0.04% +2mV/0.04% + 3mA (CH1), 0.04% + 5mV/0.04% + 3mA (CH2, 3) readback accuracy
  • 145 x 216 x 367mm (H x W x D) dimension, 8.3Kg weight, 0 to 40°C operating temperature

Go HERE for more information

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Pool Bonding Requirements

    Winnipeg Information Bulletin: Pool Bonding Requirements

    May 4, 2026 Pool bonding is electrical work and thus requires an electrical permit. Section 68 of the Manitoba Electrical Code (MEC) outlines rules for electrical installations and equipment in or adjacent to pools, tubs, and spas, focusing on reducing the risk of electrical shock in wet environments, and establishing an effective equipotential plane. A Read More…

  • Common Lighting Pitfalls and How to Avoid Them

    Common Lighting Pitfalls and How to Avoid Them

    May 4, 2026 By CSC LED Fast-paced projects leave little room for error. Even experienced teams can encounter common lighting pitfalls that slow down installs, create uneven results, or add unnecessary costs. Understanding what to look out for—and planning ahead—can save time, reduce rework, and improve the final outcome. Here are five areas where projects Read More…

  • HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    May 1, 2026 In multifamily buildings, the electricity meters are supplied by transformers or by the main electrical service panel, whose capacity has not initially been planned to supply an electric vehicle charging infrastructure for 100% of the units simultaneously. RVE’s HUB is an energy management system (EVEMS) that eliminates the need to upgrade electrical infrastructure; Read More…

  • ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    May 1, 2026 This proposed change intends to reflect the current industry trend towards increasing standard equipment sizes of inverters, commonly reaching values greater than 10kW, and supports harmonization within the industry. The OEB (Ontario Energy Board) issued proposed amendments in October 2025 which included increasing the maximum threshold capacity for a micro-embedded generation facility Read More…


Changing Scene