Magic Lite — Gen 3, Colour Adjustable Thin Line Down Lights with Attachable Colour Trim Rings

Magic Lite Gen 3

May 5, 2019

Magic Lite announces the launch of it’s Gen 3 Thin Line Down Light product range. This newest generation of popular Thin Line down lights boasts our highest lumen output and is stocked in 3000K, 4000K as well as colour adjustable (2700K/3000K/4000K).

To make things easy, fixtures come in standard white finish with Black, Bronze and Brushed Nickel attachable trim rings available. Additional accessories include goof rings and construction plates. Available in 3” – 12” sizes, round or square, recess and surface mount, this offering is the most extensive in the industry.

Go HERE for more information

Related Articles


Latest Articles

  • Winnipeg Information Bulletin: Pool Bonding Requirements

    Winnipeg Information Bulletin: Pool Bonding Requirements

    May 4, 2026 Pool bonding is electrical work and thus requires an electrical permit. Section 68 of the Manitoba Electrical Code (MEC) outlines rules for electrical installations and equipment in or adjacent to pools, tubs, and spas, focusing on reducing the risk of electrical shock in wet environments, and establishing an effective equipotential plane. A Read More…

  • Common Lighting Pitfalls and How to Avoid Them

    Common Lighting Pitfalls and How to Avoid Them

    May 4, 2026 By CSC LED Fast-paced projects leave little room for error. Even experienced teams can encounter common lighting pitfalls that slow down installs, create uneven results, or add unnecessary costs. Understanding what to look out for—and planning ahead—can save time, reduce rework, and improve the final outcome. Here are five areas where projects Read More…

  • HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    HUB from RVE: White Paper on Critical Risks of Primary-Side Only Monitoring

    May 1, 2026 In multifamily buildings, the electricity meters are supplied by transformers or by the main electrical service panel, whose capacity has not initially been planned to supply an electric vehicle charging infrastructure for 100% of the units simultaneously. RVE’s HUB is an energy management system (EVEMS) that eliminates the need to upgrade electrical infrastructure; Read More…

  • ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    ESA: Increase Plan Review Threshold for Distributed Energy Resources (DER) from 10kW to 12kW

    May 1, 2026 This proposed change intends to reflect the current industry trend towards increasing standard equipment sizes of inverters, commonly reaching values greater than 10kW, and supports harmonization within the industry. The OEB (Ontario Energy Board) issued proposed amendments in October 2025 which included increasing the maximum threshold capacity for a micro-embedded generation facility Read More…


Changing Scene