Yaskawa: R1000 Regenerative Unit

R1000 yaskawa 400

May 17, 2019

Looking for a smart and efficient alternative to dynamic braking? Look no further. The R1000 Regenerative Braking Unit is your answer.

Unlike dynamic braking, which dissipates all braking energy in the form of heat, the R1000 avoids wasted energy by delivering it back to your power source for use by other loads. Since the R1000 only transfers power during regeneration (not motoring), it is very economical for regenerative applications, and return on investment is often less than 1 year. Not only does this save energy and money, but it also eliminates the need to safely locate braking resistors.

Highlights:

  • Compatible with all conventional drives having full power access to DC bus
  • Rated for 100% power, 25% duty cycle (60 second maximum on time), or 80% continuous
  • Overload capability of 150% for 30 seconds
  • 0.9 Power Factor at full load
  • Overcurrent and Overheat Protection
  • Embedded Modbus RTU Communications
  • Removable Terminal Block
  • Multi-language LCD Display
  • Communication options for all major industrial networks provides high speed control and monitoring, reducing installation cost
  • DriveWizard computer software for easy configuration
  • USB Copy Unit and Keypad configuration storage provide speed and convenience for duplicate configuration of multiple drives
  • Made with RoHS compliant materials

For more information, visit HERE.

Related Articles


Latest Articles


Changing Scene

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…

  • Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    July 31, 2026 Toronto Pearson has announced contracts to NORR-DIALOG and PCL Construction, who will design and construct another major infrastructure program. The $1.5-billion investment to launch the Terminal 1 and Terminal 3 Revitalization Program has been awarded to NORR-DIALOG, a joint venture between two firms both Ontario-incorporated, and PCL Construction, a global firm created and headquartered… Read More…

  • D.A.D. Sales Welcomes new Team Member – Tom Graham

    D.A.D. Sales Welcomes new Team Member – Tom Graham

    July 31, 2026 D.A.D. Sales announced the addition of Tom Graham as Construction Sales Representative on the D.A.D. Sales team, supporting Northern Alberta. “Tom brings valuable industry experience, a strong understanding of the construction market, and firsthand insight as a skilled tradesman. He understands our customers’ businesses and the realities they face in the field.… Read More…

  • Franklin Empire Opens New Full-Line Branch in Peterborough

    Franklin Empire Opens New Full-Line Branch in Peterborough

    July 31, 2026 Franklin Empire is pleased to announce the opening of their new Peterborough branch, bringing together electrical, automation, and Process Instrumentation expertise under one roof. This new location expands their ability to better serve contractors, industrial facilities, OEMs, municipalities, and commercial customers throughout the Peterborough region with a complete range of products, technical… Read More…