Shat-R-Shield Ironclad VR Pro

Shat-R-Shield Ironclad VR Pro

Nov 19, 2020

Shat-R-Shield’s Correctional Cell Fixture is designed to withstand extreme abuse by using materials that are virtually indestructible. Built with 1/2″ thick 304 Stainless Steel and a cast .400″ thick diffused lens, this light fixture is built to withstand hard/repetitive impacts and its tight design offers no point of entry.

The Ironclad® Vandal-Resistant (VR Pro) fixture uses an LED high efficiency light engine with a cool light that simulates daylight. The incorporated count light LED module can be turned on and off. Tested to Canadian and US standards by Underwriters’ Laboratories, this fixture carries a cULus rating.

 

Specifications:

Lumens: 4400 (42W)

Count Light Lumens: 680

Light Engine CCT: 5000K, 4000K, 3500K, 2700K

Count Light CCT: 2700K

Life Hours: L70>75,000 Hours; Projected > 100,000 Hours

Footcandles: 35ftc at the desk level; 22ftc at the floor

Voltage: Universal 120-277V

Weight: 7.9 lbs.

Warranty: 5 year limited warranty

Dimensions: 12.25″ diameter x 1.9″ tall

Go HERE for more information.

Related Articles


Latest Articles


Changing Scene

  • CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    CAF-FCA Welcomes Federal Apprenticeship Investments, Urges Focus on Implementation

    May 1, 2026 CAF-FCA welcomes the federal government’s strong focus on skilled trades in the 2026 Spring Economic Update, including new investments in apprenticeship pathways, financial supports, and employer incentives. These measures reflect long standing priorities advanced by employers and partners across the country. The Canadian Apprenticeship Forum (CAF-FCA) welcomes the Government of Canada’s renewed Read More…

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…