Intermatic NightFox Pro Series Electronic Photocontrols

Intermatic NightFox Pro Series Electronic Photocontrols

Feb 24, 2021

NightFox Pro Series Photocontrols offer protection to typical, enhanced, or extreme electrical transients as laid out by ANSI C136.2.

• ELC model safeguards applications against 6kV/3kA surge events or a typical level per ANSI C136.2

• EK and LED models provide protection for increased levels per ANSI C136.2

• Customers have the option of setting an extreme level of protection at 20kV/10kA transients per ANSI C136.2 – by requesting a larger 1020J MOV component

Lab testing to ANSI C136.2 requirements confirms that, in addition to using the proper MOV component, other relevant electronic components and designs adequately meet typical, enhanced or extreme levels as labeled by ANSI C136.2.

• Maintenance-free installations with a control solution tested and warrantied to match life expectancy of LED fixtures

• Made for 10- to 20-year life with capabilities like zero-cross switching technology conformal coated PCB assemblies and 2, 6, 8 A electronic ballast/LED driver ratings

• Tested at full load to 5, 10, and 15 k ON/OFF cycles with NEMA 410 in-rush load abilities

• Extended warranties that validate our testing by backing products with up to 12-year warranties

Go HERE for more information.

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed… Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…


Changing Scene