New Lutron Radio RA3 Lighting Control System

EIN Lutron RadioRA3

January 28, 2022

Orders for the new RadioRA 3 wireless processors and Sunnata RF keypads, dimmers, and switches have begun shipping to Lutron customers. Featuring the first-ever line of wall controls with both light bar design and IoT (Internet of Things) connectivity, a new all-in-one processor powered by PoE (Power over Ethernet), and new simpler PC programming software and app-based editing features, trained installers will now have access to install RadioRA 3 and transform how their customers experience lighting control.

Professionals can check with their local Lutron distributor for availability and/or to place an order. Customers that purchase direct from Lutron can see order status and Estimated Ship Dates by logging into Lutron’s myOrders.

 

 

The following new products are now shipping:

 Description Model # 
 RadioRA 3 Wireless Processor  RR-PROC3-KIT, RR-PROC3-CW
 RadioRA 3 Sunnata RF PRO LED+ Dimmer  RRST-PRO-N
 RadioRA 3 Sunnata RF Switch  RRST-8ANS
 RadioRA 3 Sunnata RF Keypads  RRST-W4B, RRST-W3RL, RRST-W2B
 RadioRA 3 Sunnata RF Companion Dimmer  RRST-RD
 RadioRA 3 Sunnata RF Companion Switch  RRST-RS

 

The latest Lutron Designer software (version 21.7) is also now available. New to this release includes conversion of RA2 projects to RA3! Simply open the RA2 project file in Lutron Designer, and the project will be automatically converted. For this feature, and all of the latest RadioRA 3 updates and improvements, be sure to download the latest Lutron Designer through myResources under the Technical Information section. For those that have not yet completed RadioRA 3 qualification, please first visit Lutron’s Lighting Control Institute to complete training and receive access to the RA3 setup tools.

Go HERE for more information

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…

  • EB Horsman Unveils New Mural at Campbell River Branch

    EB Horsman Unveils New Mural at Campbell River Branch

    July 14, 2025 EB Horsman & Son are thrilled to unveil a new mural at their Campbell River branch, painted by the talented Kwakwaka’wakw artist, Adam Lewis. “This stunning piece celebrates Indigenous heritage and our community spirit,” said EB Horsman on LinkedIn. “As we mark 125 years of serving Western Canada and 55 years in… Read More…

  • Glenco Electric Celebrate New Red Seal Team Members

    Glenco Electric Celebrate New Red Seal Team Members

    July 14, 2025 “The Red Seal Journeyman designation is the highest recognition in the trades, and we’re proud to have seen so many of our team members earn it under our watch,” said Glenco Electric on LinkedIn. “At Glenco, we’re big on mentorship and promoting from within. When you combine that with driven, hard-working professionals,… Read More…

  • Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    July 14, 2025 The governments of Canada and Ontario are investing up to $3 million and launching the third intake of the Agricultural Stewardship Initiative (ASI) to help farmers implement projects to improve the energy efficiency of their farming operations. To support the province’s plan to protect Ontario, this funding will help local agriculture, agri-food… Read More…