AEMC® Instruments Expands Data Logger Lineup with New L400 Series Built for Hands-Off Monitoring

May 14, 2026

When something goes sideways in an electrical system, the question is never if the data was there. It’s whether anyone was around to catch it. AEMC’s new L400 Series Data Loggers — the L411, L412, and L461 — are built to be the ones watching, so you or your customers don’t have to. Each model is purpose-built for a specific monitoring challenge:

L411: Single-channel TRMS AC current logger with an integrated MiniFlex® Rogowski sensor rated up to 3000 AAC. Ideal for flexible installation around large or awkward conductors where rigid CTs won’t fit.

L412: Dual-channel TRMS AC current logger with two probe terminals compatible with AEMC PEL current probes and sensors. One logger, two circuits, full sensor flexibility.

L461: Two-input, single-channel TRMS AC/DC voltage quality logger rated 1000 V CAT IV and 1500 VDC CAT III. Engineered for distribution monitoring and solar PV applications, with 1-second voltage quality analysis built in.

AEMC® Instruments Expands Data Logger Lineup with New L400 Series Built for Hands-Off Monitoring

KEY FEATURES

  • 1-second Trend Logging: available through the DataView® Control Panel
  • Continuous USB power: eliminates battery life limitations for uninterrupted monitoring No dead batteries mid-study.
  • Built-in web server (no app required): browser access to live data, configure recordings and time sync.
  • Remote Access: with DataViewSync extends the reach to anywhere in the world with internet access — perfect for fleet deployment.

APPLICATIONS

  • Load profiling and demand analysis
  • Predictive and preventive maintenance
  • Troubleshooting intermittent current issues
  • Validating solar PV performance
  • Long-term studies on distribution feeders

Cat. #2153.52 – Model L411

Cat. #2153.53 – Model L412

Cat. #2153.54 – Model L461

Source

Related Articles


Latest Articles

  • Engagement Begins on Prompt-Payment Legislation in BC

    Engagement Begins on Prompt-Payment Legislation in BC

    June 1, 2026 Engagement is now open to support the implementation of the new Construction Prompt Payment Act, which is designed to ensure fair, on-time payment for contractors and subcontractors. Engagement is taking place through the B.C. Construction Prompt Payment Act discussion paper. This paper has been distributed to partners in the construction industry to collect Read More…

  • Why New Pool and Hot Tub Code Changes Matter More Than Ever

    Why New Pool and Hot Tub Code Changes Matter More Than Ever

    June 1, 2026 As an electrical contractor, pools and hot tubs aren’t just another install. They’re high-liability environments where small oversights can turn into serious safety issues. And those risks aren’t theoretical. “We are seeing reports of shocks at hot tubs,” says ESA Technical Advisor Trevor Tremblay. “We had one example of people just relaxing Read More…

  • How Do I Choose the Right Conductor Material for Cables and Wires?

    How Do I Choose the Right Conductor Material for Cables and Wires?

    May 29, 2026 By Christian Dettmer, Head of Technical Department – HELU The conductor material is the heart of a cable or wire. It forms the core and ensures efficient transmission of energy, signals, or data. Depending on the area of application, the right choice is crucial for the reliability, service life, and performance of Read More…

  • University of Waterloo Students Help Decarbonize ESA’s Ontario-Wide Fleet

    University of Waterloo Students Help Decarbonize ESA’s Ontario-Wide Fleet

    May 29, 2026 By Chantal Vallis, Faculty of Environment – University of Waterloo Reducing a business’ carbon footprint is no small task. For Ontario’s Electrical Safety Authority, which operates province-wide and logs eight to nine million kilometers annually, the challenge is especially complex. Recognizing the scale of the issue, they turned to the next generation Read More…


Changing Scene