Hammond Adds Dedicated Arduino and Beaglebone Development Board Enclosures

Hammond Board Enclosure

 

Feb 26, 2016

Hammond Manufacturing has further extended its family of design-specific plastic enclosures for housing small form factor development boards with the introduction of the

• Hamar, configured for the Arduino Leonardo, M0 Pro, Uno or Yún
• Hambb, optimized for the BeagleBone Green

All models are based on the general purpose 1593 Series, and are supplied ready to use with machined or molded I/O, power and expansion ports to suit the layout of components on the various boards. All versions are available in translucent blue, grey or black general purpose ABS with a satin finish, and are intended for use by both professional developers and hobbyists.

The Hamar is supplied as standard with four end panels, giving one unit that can be used with the four different Arduino boards. The HAMBB is specific to the BeagleBone Green. The BeagleBone and BeagleBone Black are also supported with individual design-specific enclosures.

The new additions to the family support 16 different designs of Raspberry Pi, Arduino, BeagleBone, freescale and Intel Galileo development boards. The traditional base and lid designs provide good mechanical protection combined with easy access for external interconnects.

Find out more: www.hammondmfg.com/1593HAM.htm.

 >> Source ALL of your Canadian Electrical products in the Goldbook Directory <<

 Other Products:

Hammond Power Solutions Launches Cast Resin Transformers

Hammond’s Latest Enclosure: Hot Design With a Cooling Capability

Hammond Adds New Size to Stomp Box Range For Deeper Switches

Hammond Launches Centurion R Reactor

HPS Offers Enclosed Option to Existing Centurion R Reactor Line

 

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…