6 Tactics to Maximize the Purchasing Function: Tactic 2 — Pricing

maximize purchasing power

 

Barry Olson

This article is the second in a series of six tactics in which the electrical contractor can maximize purchasing power and profitability though procurement.

Whether one has a dedicated purchasing team or relies on project managers to procure materials, consideration of these six specific tactics can help maximize profits and increase efficiencies.

Valuation of materials

I have noticed a common practice employed by purchasing staff and project managers in the past when buying out a project. The low quote used on bid day is reviewed for accuracy, and then the vendor is contacted and told they have a chance to write the order. Unfortunately, though, they are told they need to go back to their office and sharpen their pencil to do so. Sometimes the vendor is given a number to meet, but often the vendor is just told to return with their best and final number. An advanced version of this game includes multiple vendors pitted against each other in hopes of squeezing every last ounce of margin possible from the order (the fallacy of this strategy will be covered in another part of this series). The vendor, after a specified amount of time, brings back a new and revised quote and assures the buyer that the bottom has been reached. This statement can very well be true as the vendor has taken out any additional contingency money and may have even gone back to the agent for a better buy price. But how do you really know the price is right? The only way to really determine if the material is actually worth what you are paying for it is to do your homework.

Historical pricing

Much of the pricing data I have is stored in my brain from years of buying the same materials over and over again. Beyond that, I keep an electronic list of prices for just about everything I have sent out for quote. When I am buying a specific item, I refer to that list and look for a match. If I don’t have an exact match, I may have something that is similar or is in the same product family. Pricing for material is often relative. For instance, if I am buying a three-pole breaker, but I only have pricing for a two-pole breaker of the same series and manufacturer, I will find the list price of both breakers and apply the same multiplier against the three-pole breaker as was used for the two-pole breaker price. This gives me a benchmark from which to operate and get me close to the price I should expect to pay. One caveat here: make sure you are comparing the same manufacturer’s product and list prices.

Competitive comparisons

Pricing provided by equal product can be a useful tool as well. Often, when the specification calls out for a single source or manufacturer, it can be difficult to negotiate for a lower price. By using pricing examples for equal products, a fair market price can be better established. You can use this information as a point of leverage with the manufacturer or their agent. Unless the job requires that you match existing product on site, the hint of possibly substituting the specified product with one that offers equal performance may help get you that extra discount. Be careful to use tact with this approach, though, because making enemies with the people you depend on daily can negatively affect you in the long run.

Use your gut

Suppose you need to pick up a loaf of bread for dinner. You stop at the local corner store close to home and when you get to the checkout, the clerk rings up the loaf of bread at $20. Would you just pay the bill? Unless it’s a very special loaf of bread, I would wager you wouldn’t, but why not? The clerk has simply scanned the item and the register displayed a preprogramed price, so it must be correct. The fact is your brain already has an idea of the actual value of the product you are buying. The glaring difference between your established mental value and the read out on the register is why you realize something is amiss. The nice thing about this is that you can use this same system of valuation in your project buying activities.

Often, vendors or agents will use a lot price to hide these sneaky $20 loaves of bread, but with a little work on your part, you can uncover these nasty little surprises.

I usually create a spreadsheet detailing all parts of the package I plan to be buying. Of those parts, I assign a value for any item that I know the cost of. This doesn’t need to be an exact hard cost; just a ballpark amount will work. As you go through the list, fill in as many items as possible. What you will be left with are either special items or items not frequently purchased. At that point, go through the list again and pick out any items that you can plug in a reasonable guess for. For instance, suppose you have a 100-kilowatt (kW) uninterruptible power supply (UPS) and you do not have a historical price for that particular unit, but you do have a price for a 200-kW unit from a recent bid. Plug in the price in for the 200-kW unit. Price is not always relative in the sense that a 100-kW unit will be half the price of a 200-kW unit, but you do know that they should not be the same price. Once that is done, any additional items that do not carry a real price or an estimated value price need to be dealt with. Plug in a worst-case value for those items, and then compare the delta between the lot price from your vendor and your spreadsheet. Can you justify the difference? If so, you can assume you are not paying too much, if not, bring the vendor and let them explain the difference. This exercise can be done relatively quickly by an experienced buyer or estimator and can add thousands to your bottom line.


Barry Olson has 25 years of purchasing experience with large union contractors and is currently the director of purchasing for SASCO in Southern California. He holds a Bachelor’s degree in organizational leadership, is nearing completion of a Master’s degree in the same discipline, and plans to continue his studies with a Ph.D. Barry can be contacted at BarryOlson@Outlook.com.

This article has been reprinted with permission of Electrical Contractor Magazine. These articles originally appeared on ECmag.com in 2015. Next in the series: time. Read the first article, on economies of scale: http://electricalindustry.ca/latest-news/1499-six-tactics-to-maximize-the-purchasing-function-tactic-1-economies-of-scale.

Read More Articles on Electrical Industry Canada by this Barry Olson:

6 Tactics to Maximize the Purchasing Function: Tactic 1 — Economies of Scale

6 Tactics to Maximize the Purchasing Function: Tactic 3 — Time

6 Tactics to Maximize the Purchasing Function: Tactic 4 — Influence

6 Tactics to Maximize the Purchasing Function: Tactic 5 – Know Your Prices

 

 

 

Related Articles


Latest Articles

  • Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    August 4, 2026 Prysmian’s proposed US$3.8-billion acquisition of Atkore is primarily a move to deepen the Italian cable manufacturer’s U.S. electrical-products presence, but it also carries a meaningful Canadian angle for the electrical channel. If the transaction closes as expected, Prysmian would add Atkore’s FRE Composites manufacturing operation in Saint-André-d’Argenteuil, Que., near Montréal, to its… Read More…

  • Technical Safety BC Top 5 Safety Risks in 2025

    Technical Safety BC Top 5 Safety Risks in 2025

    July 31, 2026 Each year, Technical Safety BC measures the data they receive through incident and hazard reports to analyze and rank the top safety risks encountered across the province. These risks were identified by collecting, assessing, and analyzing incident investigation data. The key metrics they look at when ranking the top five safety risks… Read More…

  • World Youth Day Spotlight: Supporting Habitat for Humanity Canada’s Youth Skills Building Program

    World Youth Day Spotlight: Supporting Habitat for Humanity Canada’s Youth Skills Building Program

    July 31, 2026 By Electro Federation Canada This World Youth Day, we are proud to recognize the positive impact EFC members continue to make through their support of Habitat Canada’s Youth Skills Building Program. Investing in the Next Generation of Talent Canada is experiencing a significant labour shortage that is delaying homebuilding, driving up costs,… Read More…

  • Current Carrying Capacity: How to Determine the Right Conductor Cross-Section

    Current Carrying Capacity: How to Determine the Right Conductor Cross-Section

    July 31, 2026 Current carrying capacity means the maximum current that a cable can transmit over sustained periods without overheating. Exceeding the permitted current capacity can damage the cable’s insulation and, in the worst case, result in fire. What determines the current carrying capacity? Different parameters influence how much electricity a cable can safely transmit.… Read More…


Changing Scene

  • Nexans Canada Celebrates 60 Years of Electrifying Canada from Fergus, Ontario

    Nexans Canada Celebrates 60 Years of Electrifying Canada from Fergus, Ontario

    Canada’s largest wire and cable manufacturer marks six decades of continuous manufacturing in Centre Wellington… Read More…

  • Mac’s II Agencies Expands Industrial Portfolio with Five Hubbell Brands

    Mac’s II Agencies Expands Industrial Portfolio with Five Hubbell Brands

    August 5, 2026 Mac’s II Agencies is expanding its electrical portfolio across British Columbia and Yukon with five leading brands from Hubbell, enhancing our ability to support hazardous location and industrial project business with reliable, field proven solutions for demanding environments. From explosion proof distribution equipment and industrial lighting to the connectors, glands, and hardware that tie… Read More…

  • Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    August 4, 2026 Prysmian’s proposed US$3.8-billion acquisition of Atkore is primarily a move to deepen the Italian cable manufacturer’s U.S. electrical-products presence, but it also carries a meaningful Canadian angle for the electrical channel. If the transaction closes as expected, Prysmian would add Atkore’s FRE Composites manufacturing operation in Saint-André-d’Argenteuil, Que., near Montréal, to its… Read More…

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…