Section 40 — Electric Cranes and Hoists

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook but will hopefully provide some help in navigating the Code. These notes are based on the 25th edition.

Section 40

Rule 40-000 ScopeThis is a supplementary or amendatory section of the code and applies to the installation of electrical equipment and circuits for electric cranes, hoists, and monorails. The CEC Handbook provides additional notes and diagrams to better explain this section.

Rule 40-002 Supply conductor sizesBecause of the short duty of crane and hoist motors, insulated supply conductors are selected from Table 58, which specifically applies to Crane and Hoist installations.

Rule 40-004 Conductor protectionInsulated conductors supplying main contact conductors must be installed in approved protective wiring methods—such as rigid conduit, electrical metallic tubing, or sheathed cables—unless Rule 40-018 provides an exception. If a flexible connection to equipment is required, armoured or unarmoured cable, festoon cable, or flexible cord may be used, provided take-up devices are included to prevent cable damage and keep it clear of the operating area.

Rule 40-006 Overcurrent protectionFor main contact insulated supply conductors or directly supplied equipment, the overcurrent protection must be selected as per Rule 28-200 and Tables 29 and D16 for the motor load, plus any allowance as per Rule 14-104 where conductors have been selected with capacity for the other loads on the crane or hoist.

Rule 40-008 Disconnecting meansAll ungrounded conductorsof the main contact conductors must be capable of being simultaneously disconnected quickly for safety in an emergency and for maintenance. The disconnect must be within sight of the main contact conductors or the equipment. In addition, the disconnect must be accessible and be operable from the ground or floor over which the crane or hoist operates.

Rule 40-010 Main contact conductorsThis rule requires thatwhere there are bare main contact conductors, they must have an ampacity not less than the conductors supplying them and, if wire conductors, shall be not smaller than No. 4 AWG copper, or No. 2AWG aluminum. If the conductors are more than 18 m long, then the minimum size must be No. 2 AWG copper or No. 1/0 AWG aluminum unless intermediate strain relief is provided by clamp type insulating supports. Bare conductors may be hard drawn copper, aluminum wire, or steel or other suitable metal in the form of angles, tees, T-rails, or other rigid shapes.

Rule 40-012 Spacing of main contact conductorsBecause bare main contact conductors depend on free air space to provide insulation between phases and to ground, this rule outlines the minimum support separation required of main contact conductors installed in a horizontal plane of 75mm for monorail hoists and 155 mm for other than monorail hoists. If installed in other than a horizontal plane, the separation of the main contact conductor supports must be 200mm. They should also be supported so that the extreme limit of displacement maintains a separation of 38mm from any surface. Where the bare main contact conductors are rigid, the supports must provide a minimum separation of 25mm between conductors, collectors, and any surface.

Rule 40-014 Supporting of main contact conductorsIn addition to the spacing required in Rule 40-012, the main contact conductors must be stretched between strain insulators at each end and supported throughout the length at 6m intervals.  If building conditions preclude supporting at 6m intervals, it may be increased to a maximum of 12m intervals providing the separation between contact conductors is increased by the same proportion. In the case of rigid main contact conductors, insulated supports must be spaced at intervals of up to 80 times the vertical height of the conductor but not more than 4.5m. Refer to the CEC Handbook for diagrams illustrating support spacing and calculation notes.

Rule 40-016 Joints in rigid contact conductorsThis rule outlines the importance of ensuring that any joints made in rigid main contact conductors must maintain the same ampacity of the conductors over the joint to eliminate any overheating.

Rule 40-018 Use of track as a conductor – This rule permits a single monorail, tramrail or crane runway track to be used as one of the main contact conductors or supply circuit conductors for one phase of a 3-phase circuit, providing it is derived from a single isolating transformer, does not exceed 300 v, is bonded to ground (see Rule 10-1100 to 10-1108), and any joints meet Rule 40-016.

Rule 40-020 Guarding of contact conductorsRequires that all contact conductors be guarded against inadvertent contact with bare current-carrying parts unless incorporated in an enclosed contact assembly. In addition, as long as a minimum clearance of 6 m between bare contact conductors and grade, floor, or any working surface (including a catwalk) is maintained, guarding of bare contact conductors may not be required.

Rule 40-022 Contact conductors not to supply other equipmentThis rule prohibits the contact conductors supplying the crane, hoist or monorail feeding other equipment not essential to the operation of the crane, hoist or monorail.

Rule 40-024 Bonding – As per Rule 10-406 all exposed non-current carrying parts shall be bonded to ground. In addition, in the case of a track or rail used as a conductor, it shall be bonded in accordance with Rule 40-018. Note that metal wheels on metal rails may provide a low impedance grounding path. A flexible supply connection as per Rule 40-004(2) must contain a bonding conductor.

View all of the Guide to the Canadian Electrical Code Installments




[i] Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

Related Articles


Latest Articles

  • Hydro-Québec Announces New Grant to Accelerate Solar Self-Generation

    Hydro-Québec Announces New Grant to Accelerate Solar Self-Generation

    April 7, 2026 Hydro-Québec is launching a new grant for residential and business customers who want to install solar panels. The grant will provide for $1,000 per kW installed and covers up to 40% of eligible project costs, which can average between $5,000 and $6,000 for residential customers and approximately $45,000 for a business. The Read More…

  • Wesco’s Industrial Playbook Brings Application-Based Thinking to Canadian Industry

    Wesco’s Industrial Playbook Brings Application-Based Thinking to Canadian Industry

    April 6, 2026 Wesco has introduced its Industrial Playbook 2025, a Canadian-focused guide designed to help industrial customers, specifiers, and channel partners navigate a broad range of products, services, and application-specific solutions. Rather than functioning as a conventional line card or product catalogue, the playbook is structured as a practical resource built around real operating Read More…

  • ESA Provides an Update on its New Self-Serve Licensing Platform

    ESA Provides an Update on its New Self-Serve Licensing Platform

    March 27, 2026 In October 2025 Electrical Safety Authority (ESA) officially launched its new self-serve licensing platform, a modern system designed to transform how Master Electricians (MEs) and Licensed Electrical Contractors (LECs) manage their licensing needs. The platform replaces paper-based processes and provides a centralized, web-based experience for renewing and applying for licences, paying fees Read More…

  • BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    March 27, 2026 Starting April 1, 2026, our battery rebate offer is changing. The offer will include: Applications submitted before April 1, 2026, will be reviewed under the current rebate amounts. New requirement for working with contractors Beginning June 1, 2026, solar and battery installations must be completed by a Home Performance Contractor Network (HPCN) member to Read More…


Changing Scene

  • Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    March 27, 2026 — Skills Ontario welcomes the 2026 Ontario Budget: A Plan to Protect Ontario, released today by the Ontario Government and Minister of Finance Peter Bethlenfalvy, and applauds the continued commitment to investing in skilled trades, technologies, and workforce development. Skills Ontario was pleased to see the government maintain and strengthen its support Read More…

  • Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    April 27, 2026 Toronto Hydro is launching a trailblazing customer pilot project designed to help local builders electrify multiplex housing without complex service upgrades. Through Toronto Hydro’s Multiplex PowerPlay, up to six multiplex projects can qualify to receive funding toward a smart energy load management system. Smart load management systems continuously monitor total building energy Read More…

  • Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    March 25, 2026 Gescan, a Sonepar Company, is proud to highlight its continued commitment to supporting communities across Saskatchewan through their meaningful alliance with George Gordon Developments Ltd. (GGDL). With a strong focus on community development, workforce participation and inclusive growth, Gescan is working closely with GGDL to create training, employment and business opportunities for Saskatchewan residents. These efforts are particularly focused on supporting individuals Read More…

  • Electric Avenue Launches Incentive Program for EV Charging Installers

    Electric Avenue Launches Incentive Program for EV Charging Installers

    March 23, 2026 Halifax-based EV charging solutions provider Electric Avenue has announced the official launch of its new Contractor Incentive Program, a first-of-its-kind initiative in the EV charging industry, built exclusively for contractors who have completed the company’s Installer Certification course. The program rewards certified installers for every verified and networked installation they complete, offering cash Read More…