AddÉnergie to Expand FLO, Its Electric Vehicle Charging Network in Ontario

AddÉnergie to Expand FLO, Its Electric Vehicle Charging Network in Ontario

December 10, 2016

AddÉnergie has announced plans to install 25 fast-charging stations at Canadian Tire Gas+ locations throughout Ontario, with Natural Resources Canada contributing close to 50% of the $1.8-million investment.

The $1.8M program is funded by AddÉnergie, along with a repayable contribution of $837,500 by Natural Resources Canada through its Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative. This financing is part of a $62.5-million federal commitment made in Budget 2016 to fund new fast-charging infrastructure for electric vehicles (EVs) in Canada, as well as natural gas and hydrogen refueling stations along key transportation corridors.

“The support from Natural Resources Canada accelerates our efforts to deliver smart, reliable and safe charging solutions for EV drivers wherever they are — whether it’s at home, at work or on the go,” says AddÉnergie President and CEO Louis Tremblay.

Safe and reliable charging for Canadian EV drivers

The stations will be connected to the FLO charging network, operated by AddÉnergie in several Canadian provinces. FLO is Canada’s most comprehensive and reliable electric charging network, providing EV drivers with more than 2,500 charging stations from coast to coast.

The charging stations will be installed strategically along some of Ontario’s busiest highways to facilitate EV travel in and between cities. Each location will be equipped with a direct-current fast charger (DCFC) and a dual Level 2 curbside charging station to accommodate all types of electric vehicles.

All stations linked to the FLO network are connected and monitored remotely by AddÉnergie’s national operations centre. Free membership in the FLO community comes with a mobile app that allows EV drivers to easily locate available stations and pay for charging sessions.

DCFCs are designed to charge up to 80% of an EV’s capacity in 20-30 minutes, depending on the model. They are compatible with vehicles equipped with CHAdeMO or SAE Combo charging ports, such as the Nissan Leaf, Kia Soul EV, BMW i3 or Tesla Model S (adapter required). Dual Level 2 curbside charging stations will charge most electric vehicles to their full capacity in 3-4 hours and is compatible with both all-electric vehicles and plug-in hybrid cars. Capable of charging 2 EVs simultaneously, they are equipped with an automatic cable retrieval system to retract cables after each use.

The charging stations for the project are designed and developed by AddÉnergie at its facilities in Québec City, and will be manufactured at its plant in Shawinigan, Québec.

Related Articles


Latest Articles

  • ESA Provides an Update on its New Self-Serve Licensing Platform

    ESA Provides an Update on its New Self-Serve Licensing Platform

    March 27, 2026 In October 2025 Electrical Safety Authority (ESA) officially launched its new self-serve licensing platform, a modern system designed to transform how Master Electricians (MEs) and Licensed Electrical Contractors (LECs) manage their licensing needs. The platform replaces paper-based processes and provides a centralized, web-based experience for renewing and applying for licences, paying fees Read More…

  • BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    March 27, 2026 Starting April 1, 2026, our battery rebate offer is changing. The offer will include: Applications submitted before April 1, 2026, will be reviewed under the current rebate amounts. New requirement for working with contractors Beginning June 1, 2026, solar and battery installations must be completed by a Home Performance Contractor Network (HPCN) member to Read More…

  • CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    March 27, 2026 Canadian electrical regulators have identified that the online sales of unapproved consumer electrical products are of a serious concern, and with the growing number of online marketplaces globally there is likely a higher volume of unapproved, or non-compliant, consumer electrical products available for purchase to Canadian consumers. In 2025, Canadian Standards Association Read More…

  • Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    March 27, 2026 By Electro-Federation Canada The rapid growth of e-commerce has transformed how Canadians purchase electrical products, but it has also introduced new safety risks. EFC members have been raising concerns for several years about the increasing availability of unsafe and unapproved electrical products sold online, often without clear evidence of certification or compliance with Canadian requirements. To Read More…


Changing Scene

  • Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    March 27, 2026 — Skills Ontario welcomes the 2026 Ontario Budget: A Plan to Protect Ontario, released today by the Ontario Government and Minister of Finance Peter Bethlenfalvy, and applauds the continued commitment to investing in skilled trades, technologies, and workforce development. Skills Ontario was pleased to see the government maintain and strengthen its support Read More…

  • Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    April 27, 2026 Toronto Hydro is launching a trailblazing customer pilot project designed to help local builders electrify multiplex housing without complex service upgrades. Through Toronto Hydro’s Multiplex PowerPlay, up to six multiplex projects can qualify to receive funding toward a smart energy load management system. Smart load management systems continuously monitor total building energy Read More…

  • Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    March 25, 2026 Gescan, a Sonepar Company, is proud to highlight its continued commitment to supporting communities across Saskatchewan through their meaningful alliance with George Gordon Developments Ltd. (GGDL). With a strong focus on community development, workforce participation and inclusive growth, Gescan is working closely with GGDL to create training, employment and business opportunities for Saskatchewan residents. These efforts are particularly focused on supporting individuals Read More…

  • Electric Avenue Launches Incentive Program for EV Charging Installers

    Electric Avenue Launches Incentive Program for EV Charging Installers

    March 23, 2026 Halifax-based EV charging solutions provider Electric Avenue has announced the official launch of its new Contractor Incentive Program, a first-of-its-kind initiative in the EV charging industry, built exclusively for contractors who have completed the company’s Installer Certification course. The program rewards certified installers for every verified and networked installation they complete, offering cash Read More…