2021 Ontario Electrical Safety Code is Now Available

EIN ESA Logo

December 13, 2021

The 2021 edition of the Ontario Electrical Safety Code (OESC) has been finalized and is now available for purchase. The OESC comes into effect as regulation on May 5, 2022. Members of the electrical industry are encouraged to begin familiarizing themselves with the new OESC. Electrical work conducted after the effective date needs to meet its requirements.

“The health and safety of Ontarians has always been our government’s top priority, which is why we’re committed to keeping everyone safe from electrical harm and ensuring safety requirements are kept up-to-date,” said Ross Romano, Minister of Government and Consumer Services. “The updated Ontario Electrical Safety Code will enhance consumer safety and recognize industry best practices, while removing outdated provisions and reducing unnecessary regulatory burden on businesses.”

“Revisions to the Code are made through a broad consultative process with our safety partners provincially and nationally. The new edition provides Ontario businesses, consumers and homeowners with the nationally harmonized Code while reducing burden on businesses, strengthening consumer protection and contributing to a safer Ontario for all,” says Nansy Hanna, Senior Director, Engineering and Regulations, Electrical Safety Authority. 

The 2021 edition of the OESC includes the Canadian Electrical Code, Part I plus several Ontario-specific amendments. This new edition includes changes designed to enhance electrical safety and protect workers and the public including:

  • Provide requirements to support reduction in the potential for fires and the loss of animals in buildings housing livestock. 
  • Provide clear electrical safety installation requirements for Energy Storage Systems (ESS), and harmonize with other codes and standards. 
  • Requiring GFCI protection for all outdoor receptacles to mitigate the potential for electrical shock hazard 
  • Introduce guidance to electrical installations in flood hazard zones and when electrical equipment has been exposed to water to mitigate the potential risks. 
  • Keeping workers safe by requiring additional receptacle for mobile structures connected to transfer equipment. 
  • In Ontario, mitigate the potential for shock or electrocution when structures are erected in close proximity of customer owned powerlines.   
  • In Ontario, keep the reduced conductor sizes for services and feeders for dwelling units by following the current installation practice.

The new Code is now available for purchase. The hardcopy of the Code book will be available for $223, as well as an electronic and PDF-version available for $199. These prices will include free access to the bulletins on CSA Community of Interest website over the whole period of the Code cycle. Once purchased, the PDF-version can be accessed immediately, while the hardcopy versions will not be available until late January 2022.

ESA is partnering with the CSA Group to offer the Code book and all ESA bulletins – which provide important updates and interpretations – together for one price in a searchable, digital format for $199 – accessible on smart phones, tablets and desktops and compatible with Windows and iOS. The bulletin package will be available in May 2022. 

To order a copy of the OESC, please visit csa.org/oesc or call 800-463-6727. 

For more information on the new OESC, contact ESA’s Customer Service Centre at 1-877-372-7233 or visit esasafe.com/oesc.

Source

Related Articles


Latest Articles


Changing Scene

  • Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    Siemens to Establish Global AI Manufacturing Technologies R&D Center for Battery & EV Production in Canada

    May 26, 2025 Siemens will invest CAD $150 million over five years to establish a Global AI Manufacturing Technologies Research and Development (R&D) Center for Battery Production in Canada. The new R&D center, located initially at Siemens Canada’s head office in Oakville, as well as in Toronto and Kitchener-Waterloo, Ontario, will focus on developing cutting-edge AI manufacturing technologies with an initial emphasis… Read More…

  • Honda Postponing Ontario EV Supply Chain Investment by Two Years

    Honda Postponing Ontario EV Supply Chain Investment by Two Years

    May 26, 2025 Honda is postponing its plan to invest in a comprehensive EV supply chain in Ontario. The CBC reported that the investment is being push back by two years. “Due to the recent slowdown of the EV market, Honda Motor has announced an approximate two-year postponement of the comprehensive value chain investment project in Canada…. Read More…

  • Serge Leblanc Named Sonepar Canada Interim President

    Serge Leblanc Named Sonepar Canada Interim President

    May 26, 2025 George McClean, former President of Sonepar Canada, has decided to leave Sonepar for an opportunity outside of the electrical industry. Serge Leblanc, current President of Lumen Canada, has been appointed interim President of Sonepar Canada. Leblanc will manage both responsibilities until a successor is named.  Leblanc joined Lumen in 1997 and has… Read More…

  • Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    Ontario Building and Construction Tradeswomen Head to Queens Park to Advocate for Safer, More Inclusive Job Sites

    May 26, 2025 On Monday, May 26, the Ontario Building and Construction Tradeswomen (OBCT), will host its first-ever Advocacy Day at Queen’s Park. Tradeswomen from across the province will gather to meet with Members of Provincial Parliament, including Minister of Labour David Piccini, to advocate for progress in the skilled trades for tradeswomen. OBCT’s top priorities include:… Read More…