Case Study: Centre Block Rehabilitation

EIN Lind CS Centre Block 400

February 16, 2022

The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. The Centre Block Rehabilitation will modernize the century-old building for future generations while preserving its heritage as the heart of Canadian democracy.

TWZ Group is the electrical contractor responsible for the temporary lighting on this complex restoration

project. TWZ Group Inc is a consortium of three electrical contractors, Ziebarth Electric, Wired Synergy and Toban Electric.

Committed to environmental sustainability and ensuring the best value for Canadians possible, the project team adopted LED Jobsite lighting throughout the project.

When compared to traditional bulb-based temporary lighting, LED Jobsite lighting reduces energy consumption by 65%. The project team is reducing the electrical consumption even further by implementing strict timing protocols to ensure non-essential lighting is turned off overnight.

Over the service-life of the lights, the energy usage is projected to be reduced by over 5.5 million kilowatt hours, which is equal to powering more than 2,700 homes per year.

The CO2 emissions will be reduced by more than 4,000 metric tons and is equivalent to removing 1,243 cars from the road.

EIN Lind CS 1

 

LED Jobsite lights require significantly less circuits, less maintenance, and are easier to install, relocate and uninstall. During the start of the restoration, the project team appreciated being able to increase efficiency while reducing the project’s carbon footprint.

 

EIN Jobsite CS 2

ON THE JOBSITE:

WASTE DIVERTED

An added environmental benefit is the significant amount of waste diverted from landfills because LED

Jobsite lights are a reusable asset and the modular cords are field serviceable. Also, CFL bulbs contain mercury and are considered hazardous waste. When moving to LED lights harmful toxins are no longer an issue.

FLEXIBILITY AND VERSATILITY

Centre Block is one of the most important buildings in Canada and the protection of its many heritage components is a critical concern for the construction team.

With a project of such complexity and scale, using a modular daisy-chain verses traditional cumbersome stringlights provides a greater level of flexibility to light the project.

LED Jobsite lights have enabled the project to hang less temporary lights, use less installation points, less circuits and less energy, all while also illuminating more space.

 

EIN Lind Case Study

www.ledjobsite.com

Related Articles


Latest Articles


Changing Scene

  • Mersen Fuse Selection Guide

    Mersen Fuse Selection Guide

    March 21, 2025 Unlock Instant Access to the Mersen Fuse Selection Guide Learn how to match voltage ratings, nail amperage calculations, master interrupting ratings, and conquer temperature derating, all without breaking a sweat. Go HERE to download Read More…

  • EFC’s Business Sections Welcomes New Field Service Vice Chair

    EFC’s Business Sections Welcomes New Field Service Vice Chair

    March 21, 2025 EFC is pleased to announce Matthew De Ciantis, M&D De Ciantis Enterprises Inc., as the new Vice Chair of the Field Service Business Section. Matthew is a long-standing professional in the electrical industry who fulfilled many roles within his generational family electrical contracting company. Matthew’s experience and breadth of operational knowledge has… Read More…

  • EFC Welcomes New Manufacturer Member: NOARK Electric

    EFC Welcomes New Manufacturer Member: NOARK Electric

    March 21, 2025 NOARK Electric is a global manufacturer of low, medium and high low voltage electrical components for industrial applications. They specialize in providing electrical circuit protection and motor control solutions for OEMs, contractors, and distributors. Dedicated to quality and value, their mission is to deliver top-tier products at exceptional price, backed by world-class… Read More…

  • Mac’s II Agencies Strengthens Lighting Division

    Mac’s II Agencies Strengthens Lighting Division

    March 19, 2025 Mac’s II Agencies Announces Jamie Capell as the New Sales Manager for Lighting Specification Mac’s II Agencies is pleased to announce the expansion of its lighting division with the addition of Jamie Capell as the Sales Manager for Lighting Specification. Jamie brings 25 years of experience in the lighting and electrical industry, most notably… Read More…