Case Study: Centre Block Rehabilitation

EIN Lind CS Centre Block 400

February 16, 2022

The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. The Centre Block Rehabilitation will modernize the century-old building for future generations while preserving its heritage as the heart of Canadian democracy.

TWZ Group is the electrical contractor responsible for the temporary lighting on this complex restoration

project. TWZ Group Inc is a consortium of three electrical contractors, Ziebarth Electric, Wired Synergy and Toban Electric.

Committed to environmental sustainability and ensuring the best value for Canadians possible, the project team adopted LED Jobsite lighting throughout the project.

When compared to traditional bulb-based temporary lighting, LED Jobsite lighting reduces energy consumption by 65%. The project team is reducing the electrical consumption even further by implementing strict timing protocols to ensure non-essential lighting is turned off overnight.

Over the service-life of the lights, the energy usage is projected to be reduced by over 5.5 million kilowatt hours, which is equal to powering more than 2,700 homes per year.

The CO2 emissions will be reduced by more than 4,000 metric tons and is equivalent to removing 1,243 cars from the road.

EIN Lind CS 1

 

LED Jobsite lights require significantly less circuits, less maintenance, and are easier to install, relocate and uninstall. During the start of the restoration, the project team appreciated being able to increase efficiency while reducing the project’s carbon footprint.

 

EIN Jobsite CS 2

ON THE JOBSITE:

WASTE DIVERTED

An added environmental benefit is the significant amount of waste diverted from landfills because LED

Jobsite lights are a reusable asset and the modular cords are field serviceable. Also, CFL bulbs contain mercury and are considered hazardous waste. When moving to LED lights harmful toxins are no longer an issue.

FLEXIBILITY AND VERSATILITY

Centre Block is one of the most important buildings in Canada and the protection of its many heritage components is a critical concern for the construction team.

With a project of such complexity and scale, using a modular daisy-chain verses traditional cumbersome stringlights provides a greater level of flexibility to light the project.

LED Jobsite lights have enabled the project to hang less temporary lights, use less installation points, less circuits and less energy, all while also illuminating more space.

 

EIN Lind Case Study

www.ledjobsite.com

Related Articles


Latest Articles


Changing Scene

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…

  • Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    July 31, 2026 Toronto Pearson has announced contracts to NORR-DIALOG and PCL Construction, who will design and construct another major infrastructure program. The $1.5-billion investment to launch the Terminal 1 and Terminal 3 Revitalization Program has been awarded to NORR-DIALOG, a joint venture between two firms both Ontario-incorporated, and PCL Construction, a global firm created and headquartered… Read More…

  • D.A.D. Sales Welcomes new Team Member – Tom Graham

    D.A.D. Sales Welcomes new Team Member – Tom Graham

    July 31, 2026 D.A.D. Sales announced the addition of Tom Graham as Construction Sales Representative on the D.A.D. Sales team, supporting Northern Alberta. “Tom brings valuable industry experience, a strong understanding of the construction market, and firsthand insight as a skilled tradesman. He understands our customers’ businesses and the realities they face in the field.… Read More…

  • Franklin Empire Opens New Full-Line Branch in Peterborough

    Franklin Empire Opens New Full-Line Branch in Peterborough

    July 31, 2026 Franklin Empire is pleased to announce the opening of their new Peterborough branch, bringing together electrical, automation, and Process Instrumentation expertise under one roof. This new location expands their ability to better serve contractors, industrial facilities, OEMs, municipalities, and commercial customers throughout the Peterborough region with a complete range of products, technical… Read More…