|

ABB to Invest Over CA$130M in Canadian R&D and Manufacturing

August 18, 2025

ABB announced that it will invest more than CA$130 million (around US$100 million) to expand the R&D and production capacity of its advanced power protection and grid resilience technologies in Canada. The investment in Montreal, Quebec will combine ABB’s existing Iberville and Saint-Jean-sur-Richelieu facilities at a new greenfield location. This will enable ABB to meet increasing demand in key growth industries, including utilities, renewables, transportation, and residential and infrastructure projects across Canada.

130
  • New greenfield site will support future growth in key segments including utilities, renewables, buildings and infrastructure across Canada
  • Largest ABB investment in Canada to date will combine existing Iberville and Saint-Jean-sur-Richelieu facilities to expand production capacity
  • The new facility in Montreal will support more than 600 existing jobs – with new roles to be created as production expands
  • ABB has invested around US$275 million in Canada over the past ten years

The new 340,000 sq. ft. manufacturing and R&D facility will be more than 33 percent larger than the two locations it replaces and will incorporate advanced production automation and digital technologies. Combining the existing ABB operations at Iberville and Saint-Jean-sur-Richelieu will bring more than 600 existing employees from manufacturing, R&D, engineering, testing and support functions into one location. As new product lines are added and production increases in the future, further jobs will be created.

“Our investment will support our future growth in Canada, as demand increases with customers focused on grid resilience, power distribution and renewables, and in new transportation, buildings and infrastructure projects,” said Khalid Mandri, President, ABB Installation Products. “The teams in our advanced new facility will deliver products and innovation that will help power businesses and homes across the country. Together with recent investments made in the US and in Europe, the opening of this new facility will be a key part of our global growth strategy.”

The new site is expected to open in mid-2027 and will be located in the South Shore region of Montreal, Quebec. The new building will integrate clean, energy-efficient electrical equipment and heating systems to reduce energy consumption and cut carbon emissions by over 95 percent, compared with the two existing facilities.

The project is supported by funding of CA$16 million (US$12 million) from Investissement Québec.

Today, more than 80 percent of solutions sold in Canada by ABB Installation Products are made or assembled domestically, using 70 percent locally sourced materials—including 100 percent Canadian steel and aluminum.

This is ABB’s largest investment to date in Canada. Over the past decade, ABB has invested around US$275 million in its Canadian operations to support advanced manufacturing, innovation, and workforce development. These investments include upgrades to key facilities, the integration of cutting-edge automation technologies, and the expansion of local capabilities and production capacity.   

Source

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene