FLO Introduces FLO Ultra™: a New DC Fast Charger Designed to Provide the Ultimate Fast Charging Experience

flo ultra

February 7, 2023

FLO introduced FLO Ultra, an ultra-fast charger engineered to maximize energy delivery with future-proof performance and smart design that enables the ultimate EV charging experience.

“EV demand and sales are topping all industry expectations and are now forecasted to exceed more than 45% of U.S. light duty vehicle sales by 2030,” said Nathan Yang, FLO Chief Product Officer. “As new EV drivers hit the road, they will be looking for fast charging that is safe, accessible, convenient, intuitive and reliable. This is why we designed FLO Ultra – to provide the ultimate EV charging experience.”

Rapid EV charging in a smart, flexible package

With a simple but revolutionary design, the FLO Ultra charger features two high-powered charging ports in one rugged aluminum enclosure. It will charge most EVs to 80% in 15 minutes with up to 320 kW* available using dynamic power sharing and up to 500 kW* with multiple electric vehicle charging stations connected together.

These level 3 EV chargers can be configured in a variety of ways, allowing for flexible parking options for drivers and easier installation for site hosts.

“FLO Ultra’s flexible and modular design accommodates charging on one or on both sides and parallel or pull-in parking for charging,” said Yang.

EV charging infrastructure designed to meet all drivers’ needs

The FLO Ultra charging station was designed for driver convenience and is brilliantly simple to use for EV drivers looking to charge and return to the road.

“Before FLO Ultra, fast chargers were often viewed as intimidating and imposing,” said Yang. “We want all drivers to feel comfortable, safe and secure when charging and FLO Ultra’s design reflects this. This is a charger for all drivers.”

With its sleek construction, the FLO Ultra charger has a low-horizontal profile while its highly visible illuminated canopies make it easy to locate. State-of-charge indicators quickly let drivers know if the DC fast charging station is available for immediate use.

The new charger also features a patent-pending, motorized cable management system. This system keeps cables off the ground while the extended reach allows for charging regardless of vehicle port placement. Most importantly, the motorized system makes the cables feel lighter and easier to maneuver, reducing strain on users. 

Additionally, the FLO Ultra charging station is equipped with an independent color touchscreen display for each charging port and supports flexible and secure payment options for quick and easy transactions.

Rugged durability, modular construction for industry-leading uptime

Like all of FLO’s charging products, the FLO Ultra charger is built to last. The enclosure is made of durable, recyclable aluminum designed to withstand extreme weather conditions. The EV fast charger is easily serviceable with large front and back doors and modular components for quick replacement. Finally, FLO Ultra is connected to the FLO network, which enable remote monitoring to assure swift diagnostic and proactive action to avoid potential issues.  

All these features contribute to industry-leading uptime. Uptime measures the availability of EV charging stations to users and is the percentage of time that a charging station is operational.** FLO has raised the bar with its optional FLO Performance Warranty, which guarantees a minimum of 98% uptime for all covered FLO chargers.

Built to last in North America

FLO Ultra chargers will be available starting in 2024 and will meet the National Electric Vehicle Infrastructure Program’s (NEVI) minimum standards, including Buy America requirements. NEVI will provide $5 billion in formula funding to states to build out charging infrastructure along highway corridors – filling gaps in rural, disadvantaged, and hard-to-reach locations while instilling public confidence in electric car charging stations.

* Dependent on the vehicle, configuration, and number of cars charging.
** To learn more about how FLO calculates uptime, visit: Reliability Blog Series #3: Calculating Standardized Charger Uptime (flo.com)

Source

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…