Establishing When the CE Code Becomes Mandatory

Electricians With Tools

 

Pierre McDonald

Safety requirements are constantly changing. We often see this with the new car ads that come out every model year with manufacturers claiming their vehicle is the safest in its class. Does the same hold true for electricalcodes and standards?Committees work under increasing pressure as a publication deadline approaches, only to finalize safety requirements in a revised document to be “put out there for use by the industry.” Some codes and standards have a history and are expected, while others are new and have yet to be accepted. In both cases these documents are put forward with the anticipation they will contribute to a safer environment.

In June 2015, the Canadian Advisory Council on Electrical Safety(CACES) met at its annual meeting. This council is an influential body regarding electrical safety, and comprises regulatory members representing every province and territory, as well as representatives of certification bodies, Inspection bodies and standard development organizations. They meet to discuss codes, standards, safety issues, and how they can all work together for a safer electrical industry. One of the summary discussions on the agenda was when the regulatory authorities anticipate the newly published Canadian Electrical Code (CE Code) might become a mandatory requirement within each of their jurisdictions.

The CE Code adoption process varies in each jurisdiction as the provinces and territories have the right to mandate electrical safety as they see fit. Some jurisdictions will adopt the CE Code as published while others amend certain requirements to fit their needs. Not only what is adopted differs from jurisdiction to jurisdiction,but the adoption process itself varies throughout Canada. Some jurisdictions have the CE Code automatically come into force after a fixed time has passed from the code publication date, while other jurisdictions consult with stakeholders and users prior to CE Code adoption. This process could vary from a few months to well over a year and perhaps longer, depending on government priorities at the time. Pressure is front and centre for national harmonization of standards and automatic adoption of codes.

With regard to equipment standards, these requirements are basically set through the Canadian Electrical Code Part II standards and those standards published by ULC Standards (see Appendix A of the 2015 CE Code). These standards ensure that equipment installed in conjunction with the CECode will be compatible and safe to use under the installation rules. The following table illustrates the adoption dates as to when the 2015 CE Code has become or will become adopted in the provincial and territorial jurisdictions in Canada. Jurisdictions that have already adopted the 2015 edition CE Code include the Yukon Territory, the Northwest Territory, Manitoba, Nova Scotia, and Newfoundland and Labrador. Others will follow over the next several months
Codes Table

(Note that certain Municipalities also adopt the CE Code outside of provincial legislation, e.g., St John’s, Winnipeg)

While it is anticipated that the CE Code will be adopted within the above time periods, provincial and territorial legislators always have the final decision. Legislative priorities change very quickly, which could result in substantial delays. Legislation is not an exact science;check with the authority having jurisdiction.

Additional information on the CE Code and other codes or standard requirements within each jurisdiction can be obtained by contacting the appropriate provincial or territorial authority.
For contact information on code authorities (building, fire, gas, plumbing, electrical and environmental) responsible for codes in Canada, please use the following link from the ULC website: http://canada.ul.com/codeauthorities/codeauthoritiesincanada/.

So, does the revision and subsequent adoption of electrical codes and standards always make for a safer electrical installation? While this is one piece of the puzzle, a safe installation requires that all puzzle pieces fit together as intended. From the work done by codes and standards committees through the manufacturers, testing and certification bodies, and Installers right down to the end users, electrical safety needs every part to fit together for a safe electrical environment.


Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

Other articles by Pierre McDonald:

2015 CE Code: Changes on “Approved Electrical Equipment” 

Code and Public Safety 

Section 62: Fixed Electric Heating Systems 

Now Available: CAN/ULC Standard on Electric Utility Workplace Electrical Safety

UL Code Link 

CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories 

Canadian CE Code Changes: Section 20 and More 

Meeting National Building Code of Canada Requirements 

Conductor Ampacities and Their Temperature Rating 

Codes and Standards – Provincial Legislation and the Administrative Requirements of the CE Code 

Changes to Section 12 Wiring Methods 

Section 4 Conductors — Changes from the Canadian Electrical Code’s 2009, 21st Edition to the 2012, 22nd Edition 

 

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…