Meeting National Building Code of Canada Requirements

Building Code Requirements

 

Pierre McDonald

For an electrical installation, meeting the minimum code requirements is not achieved simply by following the installation requirements of the Canadian Electrical Code Part 1 (CE Code). While electricians might believe that they are responsible just for that part of the installation that meets the CE Code, it might be shocking (no pun intended) to learn that they must also meet certain requirements of the National Building Code of Canada (NBCC). 

Here’s an example: for residential construction, the vapour barrier is an important part of the NBCC requirements, yet it is the electrician who is charged with installing vapour hats around all exterior wall and ceiling outlets. This is a very small example of requirements outside of the CE Code that should be understood by electrical tradespeople.

The CE Code includes an Appendix G, which is an informative appendix that lists requirements related to installations that are not governed by Rules of the CE Code, but are required by the NBCC. CE Code rules that are referenced to the NBCC will have the words “See Appendix G” in brackets associated with them. These references only cover those rules that are part of the fire protection requirements contained within the NBCC so you will not find the reference to the vapour barrier requirement mentioned above. (FYI, see NBCC 9.25.3 for Air Barrier Systems and 9.25.4 for Vapour Barriers.)

The application of Appendix G is stated as follows. It should be noted that the appendix is based on the 2015 edition CE Code and the 2010 edition NBCC:

• G2.1 – The intent of this Appendix is to advise Canadian Electrical Code, Part I users of performance requirements for electrically connected fire-protective equipment required by the National Building Code of Canada.

• G2.2 – Special fire protection requirements, such as use of thermal insulation, fire spread, flame spread requirements for electrical wiring and cables, flame-spread requirements for combustible raceways, and construction of electrical equipment vaults are covered by this Code (e.g., Rules 2-126, 2-128, 2-130, 2-132, 26-354, etc.).

• G2.3 – Provincial and municipal building codes may deviate from the National Building Code of Canada, and users of this list should also check those codes.

Looking into a few examples as to how this appendix will assist, we can begin with the CE Code Rules 2-128 Fire Spread, 2-130 Flame spread requirements for electrical wiring and cables, and 2-132 Flame spread requirements for totally enclosed non-metallic raceways. All mandate that they meet some requirements within the NBCC. While there are also Appendix B notes to these rules, the Appendix G notes refers the reader to several sections, articles and sentences within the NBCC. For example, Rule 2-128, refers the reader to:

• 3.1.9.1.(1) and (2), Fire stopping of service penetrations through fire-rated assemblies of fire separations

• 3.1.9.3., Penetration of fire-rated assemblies or fire separations by wires, cables, boxes, and raceways

• 3.1.13.4., Flame-spread rating for combustible light diffusers and lenses 

• 9.10.9.6., Electrical wiring and boxes and penetrating a fire separation

Rule 2-130 references:

• 3.1.4.3.(1), Wires and cables in combustible buildings

• 3.1.5.18.(1), Wires and cables in noncombustible buildings

• 3.1.5.18.(2) and (3), Wires and cables within plenums of noncombustible buildings or wiring and cables that extend from plenums

• 3.4.4.4.(1)(b), Restrictions on wiring and raceways penetrating an exit enclosure

• 3.6.4.3.(1), Equipment and wiring within plenums

And Rule 2-132 references

• 3.1.5.20., Combustible raceways in noncombustible buildings

• 3.1.5.20.(2), Combustible raceways within plenums of noncombustible buildings

In a nutshell, these references point the code user to requirements that could affect the installation or at least provide additional information for the installation. Details of these references should be fully investigated and understood by the electrical installer to ensure compliance with the CE Code rules. These references include:

• Fire stop requirements that are subjected to the fire test method in CAN/ULC-S115 – Fire Tests for Fire stop Systems
• Requirements for wiring, cables, conduit, outlet boxes and similar equipment that are allowed to penetrate a fire rated assembly under certain conditions
• Information regarding flame spread ratings of combustible light diffusers and lenses, as well as limits on the installation of these products
• Information regarding the FT rating of wires and cables, including optical fibre cables as well as installation requirements in combustible and non-combustible installations

Section 32 and certain rules within Section 32 also have substantial references in Appendix G to the sections, articles and sentences within the NBCC. This stands to reason as Section 32 “applies to the installation of electrical local fire alarm systems, permanently connected carbon monoxide alarms, and fire pumps required by the National Building Code of Canada.” While the rules in Section 32 cover conductors, wiring methods, equipment bonding, electrical supervision, circuitry and over current devices for power supplies, and smoke alarms and carbon monoxide alarms in residential occupancies, the substantial requirements for installating fire alarm systems exists within the NBCC. It is the NBCC which mandates when a fire alarm system must be installed, zoning and annunciation of fire alarm systems, elevator emergency recall (alternate floor recall for elevators), visual signal devices in a fire alarm system, and the mandatory use of CAN/ULC-S524 – Installation of Fire Alarm Systems as per 3.2.4.5, to mention just a few.

The same holds true regarding the rules for Fire Pumps, 32-200 to 32-212. It is the actual reference within Appendix G to the NBCC sentence 3.2.5.18. that mandates the use of NFPA 20 standard – Installation of Stationary Pumps for Fire Protection.In fact, Section 32 has 53 references to requirements in the NBCC. 

For some electrical installers this might not mean too much, while for others these requirements must be clearly laid out. This informative Appendix G first appeared in the 1998 edition CE Code and has provided references to those installers who must understand these requirements to fulfill contractual obligations. I have simplified the NBCC requirements to illustrate a few of the requirements associated with the NBCC that could affect the electrical Installer. It is clear that not all requirements regarding electrical installations are written in the CE Code and can easily be found. Using all the tools available, including the Appendix G references, will provide those answers.


 

Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

Other articles by Pierre McDonald:

2015 CE Code: Changes on “Approved Electrical Equipment” 

Code and Public Safety 

Section 62: Fixed Electric Heating Systems 

Now Available: CAN/ULC Standard on Electric Utility Workplace Electrical Safety

Establishing When the CE Code Becomes Mandatory
 

UL Code Link 

CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories 

Canadian CE Code Changes: Section 20 and More 

Conductor Ampacities and Their Temperature Rating 

Codes and Standards – Provincial Legislation and the Administrative Requirements of the CE Code 

Changes to Section 12 Wiring Methods 

Section 4 Conductors — Changes from the Canadian Electrical Code’s 2009, 21st Edition to the 2012, 22nd Edition 

Related Articles


Latest Articles

  • Early Identification of Critical Risks in Construction Can Save Lives

    Early Identification of Critical Risks in Construction Can Save Lives

    January 26, 2026 The Canadian Construction Safety Council (CCSC), a coalition of leading construction companies dedicated to building a safer Canada, has released its Critical Risks Guideline, a comprehensive framework designed to prevent serious injuries and fatalities (SIFs) in the construction industry.  “Safety is a shared responsibility, not a tool for competitive advantage,” says Ryan Tones, President, Peter Read More…

  • ANNQUAN Brand Power Strips Recalled Due to Fire Hazard

    ANNQUAN Brand Power Strips Recalled Due to Fire Hazard

    January 23, 2026 Summary Affected products This recall involves ANNQUAN-branded power strips models EX-D112-05 and EX-D106-25. Power strip model EX-D112-05 has a black metal enclosure with 12 receptacles made of yellow plastic. There is one on/off switch located at the end of the housing closest to the power cord. Power strip model EX-D106-25 has a yellow Read More…

  • Lighting Case Study: The Historic Congregation Emanu-El

    Lighting Case Study: The Historic Congregation Emanu-El

    January 23, 2026 By Mac’s II Agencies Nestled in the heart of Victoria, the historic Congregation Emanu-El presented a unique opportunity for Mac’s II Agencies to craft a lighting experience that enhances worship while respecting the architectural heritage of the space. True to our “Design, Supply, Support” approach, we led the project from design concept Read More…

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…


Changing Scene

  • Leviton Celebrates 120 Years of Innovation

    Leviton Celebrates 120 Years of Innovation

    January 26, 2026 Leviton is celebrating the 120th anniversary of its founding this year. Established in 1906, Leviton began as a small tin smithing business founded by Isidor Leviton, where he produced mantle tips used for gas lighting. Since those humble beginnings, Leviton has grown from a single-product manufacturer into a global leader delivering comprehensive Read More…

  • LaPlante Joins the Champion Fiberglass® Manufacturers Representative Network in Quebec

    LaPlante Joins the Champion Fiberglass® Manufacturers Representative Network in Quebec

    January 26, 2026 Champion Fiberglass® welcomes LaPlante as the new representative agency for Quebec. With deep roots in Canada’s electrical industry and a reputation built over multiple generations, the firm brings experience, steady leadership, and a clear understanding of the province’s commercial and industrial markets. LaPlante carries the distinction of being one of the oldest electrical Read More…

  • Mersen Canada Toronto Celebrate 2000 Days with No Lost Time Accidents

    Mersen Canada Toronto Celebrate 2000 Days with No Lost Time Accidents

    January 26, 2026 On December 29, 2025, MERSEN CANADA TORONTO Inc. achieved a significant safety milestone at its Canadian manufacturing facility, Mersen Canada Toronto Inc., marking 2,000 consecutive days without a lost-time accident. “This achievement would not have been possible without the employees’ consistent commitment to safety and their diligent adherence to established procedures,” said Read More…

  • New Skills Program to Help Veterans Build Construction Careers in Nova Scotia

    New Skills Program to Help Veterans Build Construction Careers in Nova Scotia

    January 23, 2026 The Province is helping Canadian Armed Forces veterans, reservists and their family members transition to construction careers. The assistance is through the new Skills Bridge initiative that will support up to 100 people over the next three years. The program, funded by the Province and delivered by the non-profit organization Helmets to Read More…