22 CE Code Changes Related to Wiring Devices and Cable Management, Part 1

July 21, 2016

Appearing below are the first 8 of 22 examples of Canadian Electrical Code changes involving wiring devices and cable management, compiled by Legrand. This is the first of a three-article series on the 22 changes. Watch for Parts 2 and 3 in the next two issues of Electrical Industry News Week.

1. Rule 12-904, Subrule (2) —Conductors in Raceways

Conductors that are connected to different power or distribution transformers or other different sources of voltage are allowed to be contained within cable tray (shown in image).

The intent of Subrule (2) within Rule 12-904 is to prevent conductors connected to different power or distribution transformers or other different sources of voltage from becoming crossed and impressing another voltage on a circuit.

This is accomplished by prohibiting these different voltage source conductors from being installed in the same raceway or compartment channel of a multiple-channel raceway. However, a change to Subrule (2) now exempts conductors that are run in cable tray, provided that they meet the installation requirements summarized within the content of Rule 12-2202.

2. Rule 12-2200, Subrule (7) — Method of Installation: Cable Trays 2

Cable trays shall be permitted to have reduced clearances through chases, under gratings and process pipes, and around other such obstructions.

Although the proceeding Subrule (6) of Rule 12-2200 requires that adequate working clearances be provided to provide access to cable tray installations, modular assemblies such as natural gas compressor stations and gas plants may be required to have the electrical installation completed using a cable and cable tray as the wiring method. Due to the constraints of space in these units and within similar installations, it is often difficult to maintain these clearances as outlined. As a result, Subrule (7) now allows for reduced clearances in installations where the cable tray passes through chases, under grating, under process pipes and around other similar obstructions.

3. Rule 12-2208, Subrules (3) and (4) — Provisions for Bonding Cable Tray Systems 3

A new exception allowing metal cable tray to not be bonded to ground has been added.

While taking care to ensure that cable trays are installed as a complete system before any conductors or cables are run, metal cable tray is not required to be bonded to ground where all of the cables contained within the tray either have an interlocking metal armour, or have a continuous metal sheath that is permitted to be used as abonding method.

All metal cable trays that are not bonded due to this exception must be conspicuously marked with this warning notice: “INTERLOCKING METAL ARMOUR CABLES OR CONTINUOUS METAL SHEATH CABLES ONLY”.

4. Rule 12-3000, Subrule (10) and Rule 12-3002, Subrule (2) — Floor Boxes and Flush-Mounted Cover

New requirements for installations of floor boxes and flush-mount floor box covers.

Rule 12-3000, Subrule (10) was added to specify that floor boxes (similar to existing installation requirements of cabinets, outlets and terminal fittings) are also to be installed in accordance with the manufacturer’s installation instructions for the type of floor intended, as well as the requirement that these instructions are to be provided with the floor box product. Similarly, Rule 12-3002, Subrule (2) was added to establish a requirement that flush-mounted floor box covers are to be specifically approved for the type of floor, with accompanying instructions.

5. Rule 12-2208, Subrules (3) and (4) — Outlet Boxes, Cabinets and Fittings

Installation requirements addressing environmental ingress protection has been expanded to include wet locations.

New Subrule (3) requires that wet location cover plates are to be installed to ensure that the intended seal between the outlet box and the cover prevents exterior elements from entering the enclosure and causing corrosion. Correspondingly, new Subrule (4) requires that flush boxes, cabinets and fittings are to be of a type suitable for the intended locations, including those installation environments considered to be wet locations.

6. Rule 24-106, Subrule (7) — Receptacles in Basic Care Areas

Isolated ground receptacles are no longer permitted in basic care areas.

Subrule (7) was added to disallow the use of isolated ground type receptacles in basic care areas, as there was concern that redundant grounding required in these areas may not be adequately achieved when using isolated ground receptacles.

7. Rule 26-700, Subrule (13) — General Requirements: Receptacles

Receptacles considered to be inaccessible are not required to be tamper resistant. When receptacles of CSA configurations 5-15R and 5-20R are for dedicated stationary appliances or installed over 2 m from the floor or finished grade, they are deemed to be inaccessible to children. New Subrule (13) provides this exemption to Subrule (12) that pertains to child care facilities; receptacles that are located as described here within these locations are not required to be tamper resistant.

8. Rule 26-702, Subrules (2) and (3) — Receptacles Exposed to the Weather

New marking requirements and broader usage opportunities for these environments.

Subrule (2) now requires that receptacles exposed to the weather of CSA configurations 5-15R, 5-20R, 5-20RA, 6-15R, 6-20R and 6-20RA that are provided with cover plates suitable for wet locations whether or not a plug is inserted into the receptacle are to be marked “Extra Duty”, with the marking to be visible after installation. Subrule (3) now permits the covers for these same CSA configurations to be marked “Wet Location Only When Cover Closed” or equivalent when: (a) installed facing downward at an angle of at least 45° or less from the horizontal, or (b) installed at least 1 m above finished grade and not in a wet location.

Watch for coverage of the remaining 14 examples in the next two issues, respectively, of Electrical Industry News Week.

 

Related Articles


Latest Articles

  • Take the Lesson

    Take the Lesson

    September 2, 2024 By Keith Sones, seasoned utility industry executive “I really don’t want to do this.” “You have to Keith. You have no choice. You can’t leave him hanging” replied my wife. I stared at the phone like a child looks at liver on their plate. They know you have to eat it but also… Read More…

  • Quebec Drives the Growth in Residential Building Construction in June, 2024

    Quebec Drives the Growth in Residential Building Construction in June, 2024

    Investment in building construction grew 2.8% to $21.4 billion in June, after a slight increase of 0.8% in May. These increases partly reflect April’s record high of $13.4 billion in total building permits value, since investment levels for a given period are driven by permits issued in prior months. The June increase in investment in building construction was primarily… Read More…

  • Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

    Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

    August 16, 2024 The new Western Memorial Regional Hospital in Corner Brook is home to Canada’s largest geothermal system, which has set a precedent for modern infrastructure for both Newfoundland and Labrador and North America. The geothermal field is approximately 600 feet below the hospital’s parking lot, and provides 100 per cent of the ground… Read More…

  • Brightening Communities: LED Technology in Action

    Brightening Communities: LED Technology in Action

    August 15, 2024 By Alex Price, Brand & Planning Manager, Current LightingTechnical Contributor: Gary Steinberg, Senior System Manager (Outdoor LED Fixtures), Current Lighting As the landscape of Canadian cities continues to evolve, the importance of outdoor lighting cannot be overstated. From enhancing public safety to promoting economic activity and fostering a sense of community, well-planned… Read More…


Changing Scene

  • Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

    Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

    Schneider Electric is transforming its Digital Buildings business in Canada with the launch of the SMART Buildings Division. This evolution marks a strategic move to deliver comprehensive solutions and services that support building owners and operators in achieving their decarbonization and sustainability goals. The demand for smart buildings is surging, driven by a global shift… Read More…

  • Introducing Alan Bearden as Interim President of Southwire Canada

    Introducing Alan Bearden as Interim President of Southwire Canada

    September 4, 2024 Southwire Canada is pleased to announce that Alan Bearden has been appointed Interim President. In this role, Alan will provide leadership and guidance for Southwire’s Canada-based organization, ensuring continuity and driving growth during this transitional period. Alan Bearden brings a wealth of experience to the position, having joined Southwire in 2008. Over… Read More…

  • A Partnership Between Electromag Graybar Canada and Phoenix Contact

    A Partnership Between Electromag Graybar Canada and Phoenix Contact

    September 3, 2024 Electromag Graybar Canada, a pioneer in industrial automation solutions and pneumatic products, is excited to announce a partnership with Phoenix Contact, a global leader in electrification, networking, and industrial automation. This collaboration, which initially began in the Langley and Ontario branches, is now expanding to Quebec. The alliance aims to provide cutting-edge… Read More…

  • Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

    Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

    September 2, 2024 William (Bill) C. Smith, Director, Transitional Business of Electrozad Supply Company Limited announced his retirement as of August 30th, 2024 after 49 years of leadership. Bill began his electrical career working part-time at Electrozad Supply while completing a Sales & Marketing Program at St. Clair College.  After his first full-time position in… Read More…