What precautions should be taken when sizing heating cables on non-metallic piping?

 

Apr 23, 2018

Pipe tracing on non-metallic pipes such as PVC, PEX or CPVC that are used for water supply, waste and storm piping should be sized according to the diameter of the pipe, the lowest ambient temperature it will operate at, and the amount of insulation installed to keep it from freezing. Heating cables on plastic pipes should never exceed 5 watts per foot (15 watts per metre) to avoid damaging these pipes due to excessive heat from the cable. On larger pipes where you may need in excess of 5 watts per foot, install two or more runs of heating cable. The cables should have one run of aluminum high temperature tape installed directly on the pipe and then the cable is attached with another layer of tape over the cable and the first layer of aluminum tape. This aids in heat distribution. Pipe tracing charts are available from Britech. You can reach us at www.britech.ca and we will send you a catalogue.

Related Articles


Latest Articles

  • Navigating Tariff Uncertainty as an Electrical Contractor

    April 15, 2025 By Matthew Biswas These three words put me into a catatonic shock – Supply Chain Disruption. It seems like just yesterday I was standing at a counter asking for products I’d bought 100’s of times before and being told they are on backorder with no expected delivery date. Circuit breakers, dimmers, panels,… Read More…

  • Four Ways Permanent Power Enahnces Outdoor Spaces

    Four Ways Permanent Power Enahnces Outdoor Spaces

    April 14, 2025 Today’s workplaces are expanding beyond the four walls of an office. As technology continues to evolve, employees are looking for new and alternative workspaces to inspire creativity and increase productivity. This includes taking their work to outdoor spaces. Bringing technology to outdoor spaces has become a challenge for facility managers and property… Read More…

  • CAF-FCA Provides Recomendations on Apprenticeship Investment

    CAF-FCA Provides Recomendations on Apprenticeship Investment

    April 13, 2025 CAF-FCA have provided an outline of actionable recommendations—developed through national consultation—to enhance accessibility, reduce financial barriers, and better align apprenticeship training with industry needs. Source Read More…

  • New Report: Preparing Alberta’s Buildings for Severe Weather

    New Report: Preparing Alberta’s Buildings for Severe Weather

    April 13, 2025 Alberta is facing more severe weather events, with rising temperatures, wildfires, and more frequent extreme storms threatening homes and businesses. Our report, Preparing Alberta’s Buildings for Severe Weather−written in partnership with the Alberta Ecotrust Retrofit Accelerator program−highlights the need for deep retrofits to ensure the province’s buildings can withstand these changing conditions. Four… Read More…


Changing Scene