By Terry Becker, P.Eng., CESCP, IEEE Senior Member

The CSA Z462 Workplace electrical safety Standard published its 2021 Edition in January.  A mandatory requirement for an employer is developing, implementing, and auditing an Electrical Safety Program.  If you have an Electrical Safety Program, is it up to date in its policies, practices and procedural requirements, is it performing as expected?  Workers do not necessarily do what you expect, they do what you inspect!  Management of change is required.

I have been involved in supporting industry with respect to shock and arc flash hazards in the workplace and in understanding what needs to be done to ensure worker safety, that effective defendable due diligence is established, and evidence of compliance is available related to occupational health & safety regulations both Provincial, Territorially or Federally.  I am in Ontario this week completing a detailed Electrical Safety Audit at multiple enterprise facilities.

Historically I have identified that buying arc flash PPE, sending your Qualified Electrical Workers on “arc flash training” or “arc flash awareness” training, having an arc flash hazard incident energy analysis study completed, and applying arc flash & shock equipment labels to electrical equipment is not adequate due diligence. I call this “bottom up hierarchy or risk control methods.” 

Picture1

Figure 1 – Hierarchy or Risk Control Methods

In CSA Z462 Clause 4.1.7 Electrical Safety Program, Clause 4.1.7.2 Auditing it outlines mandatory requirements that the employer’s Electrical Safety Program be: “audited to verify that the principles and procedures of the Electrical Safety Program are in compliance with this Standard,” and that “field work be audited to verify that the requirements contained in the procedures of the Electrical Safety Program are being followed.”  Clause 4.1.7.2 also includes a requirement that separately mandates an employer’s lockout program and procedures shall be audited by a qualified person at intervals not to exceed 1 year.  The Electrical Safety Program audit frequency should not exceed one year, while field work audits should be completed annually.

With respect to developing the Electrical Safety Program, CSA Z462 Workplace electrical safety, Clause 4.1.7 Electrical Safety Program the notes reference the user of CSA Z462 to Annex A where a framework is provided for establishing a comprehensive Electrical Safety Program based on the requirements of CSA Z45001 and as a component of the employer’s overall occupational

health and safety program.

We can also reference “CSA Z45001 Occupational Health & Safety Management Systems – Requirements with Guidance for Use” directly, Clause 3.0 Terms and References directly for a detailed definition of audit:

“Systematic, independent and documented process for obtaining audit evidence and evaluating it objectively to determine the extent to which the audit criteria are fulfilled.

Note 1: An audit can be an internal audit (first party) or an external audit (second party or third party), and it can be a combined audit (combining two or more disciplines).

Note 2:  An internal audit is conducted by the organization itself, or by an external party on its behalf.

Note 3: Audit evidence and audit criteria are defined in ISO 19011.

Note 4: This constitutes one of the common terms and core definitions for ISO management system standards given in Annex SL of the Consolidated ISO Supplement to the ISO/IEC Directives, Part 1.”

Have you developed a compliant Electrical Safety Program and completed an audit of our Electrical Safety Program?

One of the key differences in the CSA Z462 Workplace electrical safety Standard, 2021 Edition is Annex A Aligning Implementation of this Standard with CSA Z45001 which was completely rewritten to cross reference CSA Z462’s requirements, mapping them to CSA Z45001. 

I would encourage you to review CSA Z462 Workplace electrical safety Standard, Clause 4.1.7 Electrical Safety Program and Annex A when you are identifying why you need a developed, implemented and audited Electrical Safety Program.

Without an electrical safety audit completed an employer has no documented validation or verification that:

  1. That the Electrical Safety Program’s framework/table of contents is compliant to CSA Z462’s requirements.
  2. The Electrical Safety Program is being utilized.
  3. That the Electrical Safety Program is being utilized correctly.
  4. That defined policies, practices and procedural requirements of the Electrical Safety Program are implemented, followed, and enforced where required.
  5. That the defined arc flash & shock PPE, tools & equipment in the Electrical Safety Program are available, compliant to standards, pre-use inspected before use, being worn/used by Qualified Persons, performing as expected, and are dielectrically tested where required.
  6. That identified worker roles in the Electrical Safety Program are following the requirements and rules as defined in the Electrical Safety Program.
  7. That qualified persons are competent, their human performance is normal, and that condition of electrical equipment is normal.
  8. Ultimately ensuring that the expected Hierarchy or Risk Control Methods required are implemented so that the determined residual risk levels for energized electrical work tasks are valid.

Completing both Internal and External Electrical Safety Audits ensures that the employer’s Electrical Safety Program is compliant in content and is performing as expected and provides measurable and sustainable results.  This in turn will ensure that if an employer’s Electrical Safety Program is ever tested based on a significant electrical incident it will pass.

Terry Becker, P.Eng., Certified Electrical Safety Compliance Professional (CESCP), IEEE Senior Member is the first past Vice-Chair of the CSA Z462 Workplace electrical safety Standard Technical Committee and currently a Voting Member and Clause 4.1 and Annexes Working Group Leader.  Terry is also a Voting Member on the CSA Z463 Maintenance of electrical systems Standard and a Voting Member of the IEEE 1584 Guide for Performing for Arc-Flash Hazard Calculations.   Terry has presented at Conferences and Workshops on electrical safety in Canada, the USA, India and Australia.  Terry is a Professional Engineer in the Provinces of BC, AB, SK, MN and ON.  Terry is an Electrical Safety Specialist, Management Consultant at TW Becker Electrical Safety Consulting Inc. www.twbesc.ca, and can be reached at 1-587-433-3777 or by email terry.becker@twbesc.ca.

Related Articles


Latest Articles

  • Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    Electrical Permit Requirements for Alarm System and Voice, Data, Video Installations

    January 19, 2026 Other than the exceptions listed below, electrical permits and inspections are required for all electrical work involved in the installation of intrusion and similar alarm systems in all structures. Electrical permits and inspections ensure that low -voltage systems are installed safely and in compliance with Code requirements. A permit and inspections must Read More…

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…


Changing Scene

  • Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    Leviton Canada Partners with The Titan Group to Strengthen Midwest Presence

    January 19, 2026 Leviton Canada is proud to announce its partnership with The Titan Group, who will now represent Leviton’s Residential and Commercial & Industrial product lines across the Midwest provinces, effective January 1, 2026. “We’re excited to begin our partnership with Titan,” said Bill Tischner, Western Sales Director. “Their industry expertise, commitment to service, Read More…

  • Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    Hammond Power Solutions Appoints Xavier Biot as Vice President, Strategic Accounts

    January 19, 2026 Hammond Power Solutions is pleased to announce the appointment of Xavier Biot as Vice President, Strategic Accounts. In this role, he will lead HPS’s strategic account teams. He will partner with customers to align transformer and power quality solutions with evolving electrification, sustainability, and operational needs. His focus will be on helping Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…

  • Federal Government Invests in Four Ontario Steel Companies

    Federal Government Invests in Four Ontario Steel Companies

    January 12, 2026 Through targeted investments, the Government of Canada is committed to providing support to help businesses in all sectors, including steel and automotive, to respond, adapt and compete amid shifting market conditions. Evan Solomon, Minister of Artificial Intelligence and Digital Innovation and Minister responsible for the Federal Economic Development Agency for Southern Ontario Read More…