Arc Flash Incident Involving a Maintenance Switch

Maintenance Switch

 

Feb 12, 2016

This case study article examines the plans and processes reviewed and considered, the strategy deployed to manage/reduce arc flash hazards, and then lessons learned in the implementation of new systems to improve electrical workplace safety. The setting: a chemical processing facility with a robust electrical workplace safety process. The site experienced an actual arc flash event while energized work was being performed.

Photo courtesy: www.utilityproducts.com

The facility was planning energized work for an existing 480 V low voltage switchgear assembly that was an existing piece of equipment in the plant. During a process upgrade in the facility, an energized work permit was issued to remove three abandoned load conductors from an existing 480 V low voltage switchgear assembly cable compartment.

The work permit was very detailed and included tools planned for use in the project and required PPE for workers performing the task based on the incident energy defined by a recently completed arc flash hazard assessment. The defined task for the work order required the site contractor to use a nylon rope, which was typical with this type of project, disconnecting the de-energized cables and working to raise them from the top cable compartment. Figure 10 showsa layout of the low voltage assembly involved in the work.

The de-energized cables were to be removed from Cubicle 5, with still energized conductors existing in Cubical 4 at the bottom of the cable wireway. The rope used was not able to grab the conductors and would slip off of the cable, so the electrical contractor elected to employ a “come along” to assist in the removal, as the come along could apply more force. The first conductor was successfully removed with this new tool. Upon removing the second conductor, a small arc flash was observed in the lower compartment. Simultaneously, the lights to the plant went out.The contractor stopped work and waited for plant electricians to arrive, not knowing what had just occurred.

The event caused the entire plant to shut down, stopping work on the project until an analysis could be completed. It was determined that the chain of the come along had drifted below where the work was being performed and into energized Cubicle 4. Fortunately, the damage to the wall of the switchgear and come along tool was minimal, which is shown in Figure 11.

Post event analysis proved that the chain of the come along had drifted below where the work was being performed and into an energized cubicle. The chain touched an energized terminal and arced to ground, touching both phase conductor and cabinet ground metal below the non-energized cubicle where the electrician was working. After reviewing minimal damage and completing the project while de-energized, the plant switchgear was cleaned and re-energized. Fortunately, total downtime for the plant due to this event was minimal. No loss of equipment or injury to any employee occurred as a result of this event.

 

Eaton Arc Flash Safety

 

Low voltage assembly involved in planned energized work. The planned task included removing cables from de-energized Cubicle 5 while Cubical 4 in an adjacent section was still energized.

The important take-away here is that the arc flash study was completed before energized work was performed. The upstreamlow voltage power circuit breaker with a special maintenance switch setting discussed previously employed technology to clear the fault faster than the microprocessor instantaneous setting of the circuit breaker trip unit.

Calculations were previously performed that quantified a reduction in incident energy from 17.7 cal/cm2 to2.9 cal/cm2 using the special maintenance setting. Both workersand equipment were saved as a result of a total clearing time at 40 milliseconds as defined by the manufacturer’s published trip curves[8].

Lessons learned

This case study unequivocally proves that planning for the unplanned event can save lives. Some of the key lessons learned here:
• mistakes will happen on even the best planned projects. A change in tools is what led to this arc flash event
• proper planning and leveraging of all accessible resources prevented what could have been a catastrophic event
• leveraging technology can often deliver a reduction in the available energy. Using more sensitive settings can save both people and equipment should an arc flash event occur

Eaton Come Along

At left, a “come along” tool used for energized work and at right, damage to panel after phase to ground arc flash event with an upstream device with maintenance setting capabilities.

This case study is one of four published online by Eaton and has been lightly edited by EIN. See all case studies: http://www.eaton.com/ecm/groups/public/@pub/@eaton/@corp/documents/content/pct_1562591.pdf.

 

Related Articles


Latest Articles


Changing Scene

  • LEDVANCE Canada Announces Leadership Updates

    LEDVANCE Canada Announces Leadership Updates

    February 19, 2026 LEDVANCE Canada is sharing two leadership updates that further strengthen support for customers and channel partners across the country. Lori Bagazzoli has been appointed Head of Strategic Sales – LEDVANCE Canada, with a focus on expanding support for the Project and Specification market and accelerating growth in strategic opportunities. In this role, Lori Bagazzoli Read More…

  • Franklin Empire Inc. Announces Acquisition of O’Neil Electric Supply, Strengthening its Presence in Ontario and Eastern Canada

    Franklin Empire Inc. Announces Acquisition of O’Neil Electric Supply, Strengthening its Presence in Ontario and Eastern Canada

    February 18, 2026 Franklin Empire Inc., a leading independent electrical distributor in Eastern Canada, is proud and excited to announce that it has entered into a definitive agreement to acquire O’Neil Electric Supply, an Ontario-based electrical distributor, subject to customary closing conditions, including receipt of required regulatory approvals. This strategic acquisition further strengthens Franklin Empire’s Read More…

  • Nominations Now Open for 8th Biennial MEET Innovation Awards

    Nominations Now Open for 8th Biennial MEET Innovation Awards

    February 13, 2026 The Mechanical Electrical Electronic Technology Show (MEET) is pleased to announce that the ‘MEET Innovation Awards’ will return as part of the 2026 edition of the show. The purpose of these awards is to recognize innovative products in the industry. Individuals and businesses are encouraged to nominate themselves or others by completing this online form no Read More…

  • 2026 ECABC Hall of Fame Nominations

    2026 ECABC Hall of Fame Nominations

    February 12, 2026 On June 2nd, ECABC will hold a Hall of Fame Induction Ceremony as part of their Awards Gala Dinner at the Association’s 2026 Conference and AGM in Kelowna. ECABC would like to invite you to nominate an extraordinary individual from the electrical industry to join the organizations esteemed Hall of Fame! Induction into the Read More…