Guide to the Canadian Electrical Code, Part 1, 25th Edition– A Road Map: Section 84

February 28, 2023

By William (Bill) Burr


[i] Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

Section 84 — Interconnection of Electric Power Production Sources

(Note that Section 82 has been deleted from the Code) (The 25th Edition of the CE-C, Part I, (C22.1-21) * is available from CSA Group. This discussion of Section 84 is based on this edition).

Rule 84-000 notes that this is a supplementary or amendatory section of the code and applies only to the installation of power production sources interconnected with a supply authority system. These power production sources normally consist of consumer-owned electrical power generation equipment such as generators, photovoltaic systems, fuel cells, and micro-turbines that supply power to a local load and optionally to the supply authority system; and provide requirements for the electrical installation of consumer-owned electric power generation equipment that may operate in parallel with the supply authority system. Appendix B and the CEC Handbook have additional information and descriptions of these installations.

Section 84

Rule 84-002 states that arrangements for interconnection must be in accordance and compatible with the requirements of the supply authority. They must be no hazard to personnel or the public from a fault on either the supply authority system or the consumer-owned installation.

Rule 84-004 requires the provision of protection against backfeed into a supply authority system fault on all interconnected electric power sources. This type of electrical problem requires the supply authority system to be de-energized as soon as possible. The outputs of interconnected electric power production sources must provide protection against backfeed.

Rule 84-006 requires that electric power production sources be equipped with the means and equipment to establish and maintain a synchronous condition with the interconnected supply system and prevent any adverse effect. To ensure proper synchronization. Designers and installers need to pay attention to the phase relationship of the two sources if there is a voltage transformation between the two. The synchronization must be maintained once it is established with the use of voltage regulation.

Rule 84-008 requires that where there is a loss of voltage in one or more phases of the supply authority system, the interconnected electric power production source must be automatically disconnected and not be reconnected until the normal voltage of the supply authority system is restored. This is often referred to as anti-islanding protection. The supply authority may approve an alternate procedure where an inverter, designed to also serve as a disconnection device, that is suitable for interconnection with electric power production sources, may be used.

Rule 84-010 requires that where conductors and equipment are energized from both directions, overcurrent protection must be provided from each supply source.

Rule 84-012 requires that the rating of overcurrent protection for a transformer that is energized from both directions is determined under Section 26, by considering first one side of the transformer and then the other side, as the primary.

Rule 84-014 requires that each interconnected electric power production source installation must have additional devices as necessary for system stability and equipment protection. Other types of protection such as loss-of-excitation protection and over-excitation protection are also sometimes required to ensure system stability in the interest of public safety and equipment protection.

Rule 84-016 requires that ground fault protection per Rule 14-102 be provided.

Rule 84-018 requires that a consumer-owned power production system must monitor and automatically disconnect all phases from the interconnected system when there is a loss of power in any one phase.

Rule 84-020 requires that all ungrounded conductors of any electric power production source of an interconnected system, be provided with a disconnecting means that simultaneously disconnects all circuits supplied by the electric power production source equipment.

Rule 84-022 requires that all ungrounded conductors of any supply authority system electric power production source of an interconnected system, be provided with a disconnecting means that simultaneously disconnects all ungrounded conductors, avoiding imbalanced system voltages and false trips by protection devices and provides safety to personnel servicing the equipment. This gives the supply authority a single point of access to isolate one or more power production sources.

Rule 84-024 provides the general requirements for all disconnecting means used in an interconnected consumer-owned electric power production source installation so that personnel working on the electrical installation must be able to simultaneously disconnect all ungrounded conductors of the circuit, verify visually that the contact of the disconnecting means is open, and lock the disconnecting means in the open position. Additionally, the disconnecting means must:

  • be capable of being energized from both sides.
  • have contact operation verifiable by direct visible means if required by the supply authority (in accordance with Rule 84-002, to provide added assurance to supply authority workers that the circuit is open before work is initiated).
  • conform to Sections 14, 28, and 36 if it includes an overcurrent device.
  • be capable of being opened at rated load.
  • be capable of being closed with safety to the operator with a fault on the system.
  • disconnect all ungrounded conductors of the circuit simultaneously.
  • bear a warning to the effect that inside parts can be energized when the disconnecting means is open.
  • be readily accessible, and
  • where a main fusible disconnecting means is used, an isolating switch must be provided to allow the fuses to be dead during handling.

Rule 84-026 requires that isolating means be provided to isolate equipment that is energized from both directions from all ungrounded conductors of each source of supply. Electrical equipment (e.g., transformers, distribution equipment, fusible switches, and circuit breakers) energized from both directions cannot be serviced safely if there is no isolating switch to isolate it from both sources. The disconnecting means often acts as an isolating switch.

Rule 84-028 specifies that the grounding means at the service entrance may serve as the grounding means for the electric power production source in accordance with Sections 10 and 36. For renewable energy consumer-owned systems, the Rules in Section 64 apply.  In the case of a dc power source connected through a solid-state inverter, the inverter must not be grounded unless the inverter ac power is separated from the supply authority system by means of an isolating transformer.

Rule 84-030 requires that a warning notice and a single-line, permanent, legible diagram of the interconnected system be installed in a conspicuous place at the supply authority disconnecting means specified in Rule 84-022 and at the supply authority meter location.

In the next installment, we will be discussing Section 86 – Electrical Vehicle Charging Systems.

You can find the previous installment of Bill Burr’s Code series HERE.

Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

William (Bill) Burr is an associate member of the Canadian Electrical Code, Part 1, Technical Committee and formerly Chair of the Canadian Advisory Council on Electrical Safety (CACES), Chief Electrical and Elevator Inspector for the Province of BC & the Northwest Territories, Director of Electrical and Gas Standards Development and Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

Related Articles


Latest Articles

  • Efficiency Nova Scotia Rebates

    Efficiency Nova Scotia Rebates

    January 24, 2025 NEW Up to 75% of product costs in rebates for energy efficient products or interest-free financing for up to 24 months. Get rebates Before You Buy, at the counter, or After You Buy with mail-in and instant rebates. Before you Buy Instant Rebates No paperwork required. Save at the counter when you… Read More…

  • The Drive Towards Energy-Efficient Data Centres

    The Drive Towards Energy-Efficient Data Centres

    Data centres are the backbone of our digital world. They serve as the foundation for various online activities like streaming, e-commerce, website/app usage, Digital transformation. Read More…

  • Multi-Unit Construction Intentions Push Down the Residential Sector for November 2024 Building Permits

    Multi-Unit Construction Intentions Push Down the Residential Sector for November 2024 Building Permits

    January 20, 2025 The total value of building permits issued in Canada decreased by $739.5 million (-5.9%) to $11.7 billion in November, a second consecutive monthly decline. The residential sector led the decrease, followed by the non-residential sector. On a constant dollar basis (2017=100), the total value of building permits issued in November declined 5.8% from the previous… Read More…

  • Ontario Save On Energy Home Renovation Savings Program

    Ontario Save On Energy Home Renovation Savings Program

    January 20, 2025 On January 7, the Government of Ontario announced 14 new and expanded energy-efficiency programs, including the Home Renovation Savings Program, as part of a new $10.9 billion investment in energy efficiency to help families and businesses save money. Save on Energy and Enbridge Gas, with endorsement from the Ontario government, have partnered to… Read More…


Changing Scene

  • Agence Ricard Welcomes New Business Development Specialist for the South Shore of Montreal 

    Agence Ricard Welcomes New Business Development Specialist for the South Shore of Montreal 

    January 24, 2025 Agence Ricard is proud to announce the arrival of Fred Dozois as new business development specialist for the South Shore of Montreal. With over 10 years of experience in the electrical industry, Fred brings an impressive wealth of knowledge and skills that will strengthen the team at Ricard.  Recognized for his expertise,… Read More…

  • Graybar Transforming Branches From Coast to Coast

    Graybar Transforming Branches From Coast to Coast

    January 24, 2025 Exciting transformations are happening at Graybar Canada. Across the nation, Graybar branches are getting a refreshed look, inside and out. These updates reflect their dedication to maintaining modern, welcoming spaces that showcase the strength of their brand and world class manufacturer partners. From sleek new shelving to vibrant wall murals, these renovations are designed… Read More…

  • New Address for Franklin Empire London, ON Branch

    New Address for Franklin Empire London, ON Branch

    January 24, 2025 Franklin Empire are pleased to announce the new address of their London, Ontario branch. Address:552 Newbold StreetLondon, Ontario N6E 2S5 Source Read More…

  • Ontario Launches Regional Economic Development Through Immigration Pilot Program 

    Ontario Launches Regional Economic Development Through Immigration Pilot Program 

    January 24, 2025  The Ontario government has launched the Regional Economic Development through Immigration (REDI) pilot program to target highly-skilled immigration for four rural and northern regions with a high demand for skilled labour: Lanark, Leeds and Grenville, Sarnia-Lambton, and Thunder Bay. REDI enables local employers in these communities to attract up to 800 additional… Read More…