Arc Flash Alphabet Soup: Understanding the Hazard Behind the Acronyms and Technical Terms (Part 1)

Arcflash Alphabet Soup

Jim Pollard

Part 1 – Basic Terminology

Arc flash, a type of electrical explosion, is one of the most complex workplace risks that exist. It is often described using technical terminology and acronyms. Below are the most important ones with simple explanation.

 

 

 

 

 BASIC INDUSTRY TERMINOLOGY

 Technical Terminology  Simple Explanation
 CSA Z462 and NFPA 70E  Workplace electrical safety standards for Canada (CSA) and the United States (NFPA). These best practice standards are technically harmonized and follow the same revision cycle (every 3 years).
 Arc flash PPE  Personal protective equipment (PPE) designed and tested to provide protection from the heat created by an arc flash hazard.
 Calories per cm2   Measurement of heat imposed on a surface area that is used to describe both the heat from an arc flash hazard (incident energy) and the protection provided by arc flash PPE (arc ratings). 
 Incident energy      Heat created by an arc flash measured as cal/cm2 (calories per square centimetre). Incident energy can be estimated using engineering calculations.
 Arc flash risk assessment  A requirement in CSA Z462 or NFPA 70E used as a process of identifying if an arc flash hazard exists; if yes, determine safety related work practices, arc flash boundary and the arc flash PPE required.
 Hazard/risk category (HRC)  Old method that is no longer relevant, which involved using tables from CSAZ462 or NFPA 70E to select arc flash and shock PPE for various work tasks and equipment.
 Arc flash PPE category  New method of using the tables from CSA Z462 or NFPA 70E to identify when arc flash PPE is required, and if required to select arc flash PPE based on different types of equipment.
 Detailed equipment label  Applied to electrical equipment to communicate important information related to the arc flash and shock hazards. Either the incident energy or the arc flash PPE category (but not both) is used to identify the potential arc flash hazard severity.
 Arc ratings  The protection provided by protective clothing and other types of PPE from the heat (incident energy) created by an arc flash. Determined by testing and reported on the product label.
 Types of arc ratings  Arc thermal performance value (ATPV): expressed using cal/cm2 to identify the incident energy level at which there is a 50% probability of sufficient heat transfer to cause the onset of a second-degree skin burn injury. 
   • Breakopen threshold energy (Ebt): expressed using cal/cm2 that identifies the incident energy level at which there is a 50% probability of the formation of holes or tears in the garment layer closest to the skin.

Jim Pollard is a member of several technical committees, including CSA Z462. He is the owner of Unlimited PPE in Stoney Creek, Ont., and can be reached at jim@unlimitedppe.com or (905) 573-0300.

Reprinted by permission of Canadian Occupational Safety © Thomson Reuters Canada Ltd., April/May 2015, Toronto, Ontario, 1-800-387-5164. Web: www.cos-mag.com.

Related Articles


Latest Articles

  • Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    April 15, 2024 On July 7, 2023, the United Nations International Maritime Organization (IMO) and its participating maritime countries set their Greenhouse Gas (GHG) emissions strategy to achieve net zero “by or around” 2050. As a result, the shipping industry, including cruise lines, is adopting various strategies to achieve this ambitious goal, including new fuels,… Read More…

  • Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    April 8, 2024 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes, it can seem daunting to quickly find the information you need.  This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B, or the… Read More…

  • Investment in the Residential Sector Declines in January 2024

    Investment in the Residential Sector Declines in January 2024

    April 8, 2024 Investment in building construction declined 0.9% to $19.7 billion in January. The residential sector declined 1.4% to $13.6 billion, while investment in the non-residential sector edged up 0.2% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction fell 0.9% to $12.1 billion in January. Investment in the residential sector declines Investment in residential building construction declined… Read More…


Changing Scene