Canadian Electrical Industry News Week

Electrical Code Updates

Bill Burr

The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. In this article: Section 8 — circuit loading and demand factors.

This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook,* but will hopefully provide some help in navigating the Code.

Section 8 is a general section of the code. It provides you the information you need to selectthe rating of a circuit, feeder or service (i.e., ampacity of the circuit conductors and rating/setting of the circuit over current devices). Rule 8-104 describes the rating of a circuit (feeder or service) and establishes the criteria between the calculated load and circuit (feeder or service) rating. As well, it determines branch circuit positions for dwelling units.

The special terminology used in this section includes:

• Basic Load—only lighting and receptacle circuits based on the dimensions of specific building occupancy as listed in Table 14
• Calculated load – the load calculated in accordance with the rules in this section
• Demonstrated Load— the historical demand watt information recorded over 24 months for the same type of facility

The General section outlines methods of calculating voltage drop, maximum circuit loading, use of demand factors, number of branch circuit positions and determination of living areas.It specifies standard voltage divisers to be used when calculating currents from watts or volt-amperes in low voltage systems; maximum allowable voltage drop in installations; maximum circuit loading based on the overcurrent device used; and the calculated load. You will also find here the factors for determining a continuous, cyclic, or intermittent load, and how this affects the selection of conductors and equipment.

This section also outlines conditions for Use of demand factors; that is, where

• the size required for conductors and switches is not available in a standard size
• two or more loads are installed, but only one can be used at a time
• air conditioning and electric space heating are installed and only the greater load is used for calculating demand
• loads of a cyclic nature are installed such that the maximum load cannot be supplied at one time)

Where additional loads are added to an existing service or feeder, Rule 8-106(9) permits the load to be calculated by adding the sum of the additional loads to the maximum existing demand load measured over 12 months.Other demand factors can be based on demonstrated load calculations by a qualified person, as determined by the authority having jurisdiction.

Another function of this section is to outline the number of branch circuit positions needed for dwelling units. This is based on the ampacity of the service and whether a central electric furnace is intended.

The Services and feeders section outlines the methods of calculating the minimum ampacity of service or feeder conductors for various types of occupancies. Although the various options and conditions may seem complicated, methodically working through the demand factors for each type of occupancy will allow you to determine the correct ampacity for service or feeder conductors.

The methods for determining demand factors for dwelling units are divided intosingle dwellings and apartment and similar buildings.For single dwellings you are given two options depending on the size of the dwelling.In the first criterion, where the living area of the dwelling exceeds 90 m2, the basic load is 5000w and additional loads are added with various demand factors as listed in Rule8-200 (1)(a)(ii to vii). The second criterion is to use a basic load of 100 A if the floor area is 80m2 or more, or 60 A if the floor area is less than 80 m2. Note that Rule8-110 designates how to determine the living area.

For two or more dwelling units of row houses, the minimum ampacity of service or feeder conductors from a main service is based on the above demand factors for each single dwelling, excluding electric space heating and air-conditioning loads, plus the demand factors outlined in Rule 8-202(3).

For apartments and similar buildings, the minimum ampacity of service or feeder conductors from a main service is calculated according to Rule 8-202.As with single dwellings and row houses above, the basic load is based on living area plus the demand factors for various other loads as outlined in Rule 8-202 (1 to 4). It should be noted that the load calculated for a single dwelling or for dwelling units in an apartment building is not considered to be continuous. However, a house load (i.e., load of equipment installed in a common area of an apartment building) is considered to be continuous for the purpose of Rule 8-104.

There are specific rules for determining the ampacity of service or feeder conductors for schools (Rule 8-204), hospitals (Rule 8-206), and hotels, motels, dormitories, and buildings of similar occupancy (Rule 8-208). For other occupancies, as listed in Table 14, the calculations are in Rule 8-210.

One other consideration is exit, emergency and show window lighting where the loads may be spread throughout the building. Exit and emergency lighting demand shall be determined by connected load. In the case of show window lighting, demand is based on 650W/m measured along the base of the windows.

This section also outlines required branch circuit positions and demand factors. Rule 8-300 provides demand loads for branch circuits supplying electric ranges and cooking units. Rule 8-302 specifies that branch circuits supplying data processing equipment be considered continuous loads. Rule 8-304 specifies that the maximum number of outlets per any 2-wire circuit is 12, unless the actual connected load is known and the load current doesn’t exceed 80% of the overcurrent device rating.This means that the load of a typical 2-wire circuit protected by a 15 A rated overcurrent device is considered to be 12 A.

Rule 8-400 provides guidance for the number and loading of branch circuits for automobile heater receptacles generally, and where the loading on each receptacle is controlled or restricted.

In the next installment we will look at Section 10 — Grounding and bonding.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 - Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 - Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

AD Spotlight

Changing Scene

  • Prev
With the COVID-19 crisis underway, EFC is working diligently to provide current electrical ...
The All-In-One Beacon LED Tower by Lind Equipment won two innovation awards in two separate ...
Signify has completed the acquisition of Cooper Lighting Solutions from Eaton. The transaction ...
EFC’s exciting new product section on Electric Vehicle Systems conducted its first face-to-face ...
Canadian battery material specialist Hydro-Québec partners with Mercedes-Benz AG as part ...
Employer response to emerging technologies’ impact on the electricity sector workforce is critical ...
The National Electrical Manufacturers Association (NEMA) has published two new standards on ...
This fall, Canada's elite electricians and apprentices will be heading to Nashville, Tennessee for ...
The Electrical industry is “Powering a Changing World” in areas such as digitization, ...
Prior to joining ABB in 2017 as Executive Vice President of the Electrification business, Deschenes ...

E.B. Horsman & SonE.B. Horsman & Son (EBH), one of the fastest-growing, independently owned full-line electrical distributors in Western Canada, announced that it is a 2020 winner of the Canada’s Best Managed Companies Platinum Club designation, having retained its Best Managed status for 11 consecutive years.

During the past year, the company remained successful amidst changing market conditions by focusing on its six pillars: operational excellence, growth and expansion, talent management and development, collaboration and communication, enhanced customer experience and market awareness. 

Read More

 

 

 

COVID-19Below Electrical Industry News Week has collected the latest updates from companies in the industry. The majority are not experiencing major impacts with respect to supply chain and production, but are implementing changes to adhere to the recommendations of the World Health Organization, Health Canada and Center for Disease Control.

This list will continue to be updated as companies update their current situation. 

 

 

Read More

 

 

Wifi 6I once took a class where the professor would explain concepts in two ways. First, he would dive into the mathematics behind the idea, filling the whiteboard with equations and showing how they all related to one another. He tagged this “for the engineers,” Then, he would explain the concept again, but this time, with no math at all. This he said, was “for the poets.” 

So why is datacom cabling twisted, but power cabling is not? It’s all about bandwidth. Power signals are of such low frequencies that they don’t need to worry about bandwidth, but datacom cables do. 

Read More

 

 

Product News

  • Prev
Legrand has launched new temporary power cable protectors. Available in Heavy-Duty 3-channel ...
Cementex has introduced a new Digital Voltage Phasing Meter Set, ideal for measuring overhead ...
LED T8 Dual Mode U-Bend Replacement Lamps can be installed using a ballast or direct line voltage, ...
Rittal is replacing AE and CM compact enclosures with the new AX enclosures, and the KL, EB and BG ...
B&R's new digital output module X20DO4332-1 has integrated pulse width modulation and ...
VFD-SC series VFD (Variable Frequency Drive) / Servo cable offers 4 conductors, available in 16 AWG ...
The new, most economical and affordable ultra-thin Wafer 4” and 6” LED downlights provide ...
The economical Juno SlimBasics surface mount downlight in 5” and 7” delivers uniform light coverage ...
The CSS LED strip light is the single lensed version of Lithonia’s CDS Strip.     ...
The Tempesta LED series emergency unit has been designed to be efficient, architecturally pleasing ...

 

Cementex Voltage Phasing MeterCementex has introduced a new Digital Voltage Phasing Meter Set, ideal for measuring overhead and underground voltages. The new Digital Voltage Phasing Meter Set handles 0–40 kilovolts (kV) and can be used on higher voltages up to 240 kV if used with additional pairs of extension resistors. The device automatically adjusts the voltage display to match resistors if used.

 

 

Read More

 

 

Peers & Profiles

  • Prev
 Will West is a first-year apprentice working in the solar industry with Hakai Energy ...
“It’s definitely the Olympics of our trade,” said Lance Giesbrecht of the Ideal National ...
Tommy Carducci is a 14-year industry veteran working with Seneca Electrical and was one of 18 ...
Legend Power Systems is an innovative Canadian company headquartered out of Vancouver, B.C. Their ...
Founded in 1942, Franklin Empire is Canada’s largest independent electrical distributor.   ...
Nick Foster is Territory Manager, New Brunswick & P.E.I for Leviton. Foster was recently ...
Held from November 7th to 9th in Orlando, Florida and aired on ESPN 2, the Ideal National ...
Headquartered in Vancouver, Legend Power Systems is a global onsite energy management technology ...
LDS caught up with General Manager of EiKO’s Canadian division, Stephen Lee who was kind enough ...
“I had an awesome time, it was a lot of fun,” said Zach Agombar, who competed his way to 8th place ...

William WestBy Blake Marchand

Will West is a first-year apprentice working in the solar industry with Hakai Energy Solutions. Will was able to qualify for the Ideal Industries 2019 National Championships as the top apprentice from the Canada A Region.

Held from November 7th to 9th in Orlando, Florida and aired on ESPN 2, the Ideal National Championships gives electricians a chance to display their skills in a high-level competition. The event expanded internationally for the first time this year — over 55,000 electricians from 5 countries attempted to qualify for a chance to compete in the championship event.

Read More

 

 

Copper $US Dollar price per pound

Kerrwil Publications Great Place to Work. Certified December 2019 - December 2020

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2020 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil