DCC-12 Electric Vehicle Energy Management System

EIN DCC 12 charger 400

 August 30, 2021

DCC-12, manufactured by Thermolec, is an Electric Vehicle Energy Management System (EVEMS) designed to allow the connection of a charger to the main feeder of the panel without affecting the load calculation. Unlike the DCC-9 and DCC-10, there is no circuit breaker inside the DCC-12 acting as the intermediary between the VE charger and the electrical panel.

Ideal for the installation of chargers in single-family homes with a full electrical panel.

The DCC-12 has a NEMA 3R enclosure approved for indoor and outdoor installations.

How it works:
DCC allows the connection of any EV charger to a fully loaded panel by managing the energy available at any given time, whether in a home or in a condo.

  1. DCC does a real-time reading of the total power consumption of a home or condo electrical panel;
  2. It detects when the total power consumption of the main circuit breaker exceeds 80% and temporarily de-energizes the charger.
  3. When DCC detects that the total power consumption of the electrical panel is less than 80% for more than 15 minutes it automatically re-energizes the charger.

DCC will only allow power to be delivered to the EV charger if the total demand of the panel is below its full capacity.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • ECABC Announces 2026 Hall of Fame Inductees

    ECABC Announces 2026 Hall of Fame Inductees

    April 30, 2026 ECABC is proud to announce that Bill Strain and Rob Tate will be inducted into the ECABC Electrical Hall of Fame this June. Bill and Rob have devoted their careers to the electrical contracting industry in British Columbia. Induction into the Electrical Hall of Fame is the highest honour the Association can Read More…

  • Nexans Initiates Copper Mark Recertification for Montreal Site

    Nexans Initiates Copper Mark Recertification for Montreal Site

    April 27, 2026 Nexans Canada Inc. has initiated the Copper Mark recertification process for its site located at 460 Durocher Avenue in Montreal. As part of this process, an independent external assessment of the site is scheduled for April 22–24, 2026. Copper Mark is an independent assurance framework designed to assess the responsible practices of industrial sites against recognized Read More…

  • Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    Fort Frances Memorial Sports Centre Adding Solar as Part of GICB Program

    April 27, 2026 The Fort Frances Memorial Sports Centre will generate solar energy following an investment of $589,762 from the federal government through the Green and Inclusive Community Buildings (GICB) program. This funding will reduce greenhouse gas emissions and annual electricity costs for the facility. A rooftop solar generation system will convert solar energy into Read More…

  • IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    IDEAL Electrical Announces $1M Donation and Partnership with Habitat for Humanity

    April 27, 2026 In 2026, IDEAL Electrical will support four global Habitat for Humanity activations across Greater Toronto, Greater Chicago, the United Kingdom and Los Angeles/Southern California. These efforts will bring together IDEAL employees, electricians and apprentices, industry partners and electrical influencers to contribute more than 500 volunteer hours, $100K in materials and invaluable electrical skills Read More…