Hydro-Québec Launches Subsidiary Specializing in Energy Storage Systems

EIN EVLO 400

Dec 11, 2020

Hydro-Québec has launched EVLO Energy Storage Inc. (EVLO), a subsidiary that designs, sells, and operates safe, efficient and sustainable energy storage systems.

These storage systems are intended mainly for power producers, transmission providers and distributors, as well as the commercial and industrial markets for medium- and large-scale storage. Their modular design means that they can be scaled to meet a wide variety of needs. EVLO systems also include power control and energy management software.

“Energy storage will play a crucial role in the energy transition,” declared Hydro-Québec President and CEO Sophie Brochu. “We firmly believe that the know-how Québec has acquired with regard to batteries will help develop solar and wind power. Our products will also have useful applications in existing power grids, such as in managing consumption peaks.”

Putting Québec’s know-how to work

EVLO technology is the result of more than 40 years of R&D on battery materials by Hydro-Québec, which has more than 800 patents in this field. EVLO storage systems have been tested in actual operating conditions on Hydro-Québec’s grid, not only for peak shaving at Hemmingford substation in the Montérégie region, but also in the Quaqtaq off-grid system in northern Québec, where they were subjected to extreme weather. The technology is also being used in the Lac- Mégantic microgrid and in Hydro-Québec’s solar farm in La Prairie.

Safe, environmentally friendly products

EVLO’s lithium iron phosphate (LFP) batteries are much safer than conventional lithium-ion batteries, since their molecular structure provides intrinsic protection against thermal runaway. They also have a smaller environmental footprint, not just because they are made from naturally abundant, nontoxic materials, but also because they can be recycled using a process that allows 99% of the active materials to be recovered and reused. Moreover, EVLO systems do not contain any cobalt or rare earth elements.

Systems designed for the changing needs of today’s power grids

Thanks to Hydro-Québec’s know-how in the operation, control and simulation of electric power systems, EVLO can develop products and services geared to the specific needs of power producers and distributors. This represents a significant competitive advantage.

EVLO’s first major storage project on the global market

EVLO is pleased to announce that it has signed a memorandum of understanding with Innergex énergie renouvelable inc. to participate in the Tonnerre project, in France. This project involves the installation of a 9-megawatthour (MWh) storage system in the transmission system operated by France’s national transmission provider, RTE, under a long-term agreement between RTE and Innergex, to help meet France’s capacity requirements. The system is slated for commissioning in 2021.

“Tonnerre is Innergex’s first stand-alone battery project, and we’re happy to be partnering with Hydro-Québec to showcase Québec expertise internationally,” said Michel Letellier, Innergex’s President and CEO. “Storage plays a key role in the global development of renewable energy options and is a growth driver for Innergex.”

Go HERE for more information

Related Articles


Latest Articles

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…

  • Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    Multi-Unit Construction Intentions Fuel Growth in the Residential Sector for July Building Permits

    September 15, 2024 Month over month, the total value of building permits in Canada surged 22.1% to $12.4 billion in July, rebounding from two consecutive monthly declines. Both the residential and non-residential sectors expanded in July. On a constant dollar basis (2017=100), the total value of building permits in July was up 22.9% compared with the previous month,… Read More…

  • B.C. Building Code Updated to Support More Homes

    B.C. Building Code Updated to Support More Homes

    September 15, 2024 Changes to the BC Building Code (BCBC) will allow single egress stair (SES) designs in low- and mid-rise buildings to support more multi-bedroom apartment options. The Province has updated the BCBC to remove the code requirement for a second egress, or exit, stairwell per floor in buildings up to six storeys. This change will… Read More…


Changing Scene

  • Leviton Canada Achieves Another Year of Carbon Neutrality

    Leviton Canada Achieves Another Year of Carbon Neutrality

    September 15, 2024 Leviton Canada proudly reaffirms its commitment to sustainability by achieving carbon neutrality once again in 2023. The company has significantly reduced their environmental footprint by 32% compared to 2022, with a substantial impact on transportation. Despite having energy-efficient lighting and relying on hydropower—a clean and renewable energy source—for their facility, transportation (both… Read More…

  • Grand Opening: Legrand BCS Office in Markham

    Grand Opening: Legrand BCS Office in Markham

    September 15, 2024 Legrand is thrilled to announce the grand opening of their new BCS facility in the heart of downtown Markham, ON, located at 85 Enterprise Blvd, Suite 400, which is set to take place on Thursday, September 19th, 2024. “Our facility in Vaughan will remain open to continue to stock inventory for Canada… Read More…

  • Gescan Announces Partnership with PataBid

    Gescan Announces Partnership with PataBid

    September 15, 2024 Gescan is excited to announce our partnership with PataBid Quantify. PataBid is a Canadian company, with software built for contractors which integrates live supplier pricing, manual drafting, and AI technology with human expertise to maximize take offs and bidding. Patabid’s Quantify software will allow contractors to access live pricing from Gescan’s website… Read More…

  • Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    Electrical Safety Authority Unveils ‘A-MAZE-ing’ Interactive Experience to Keep Kids Safe from Electrical Harm

    September 15, 2024 The Electrical Safety Authority (ESA) cut the ribbon on its new interactive experience, “The A-MAZE-ing Adventures of Carter Current”, located at the Peel Children’s Safety Village. The interactive space is designed to help educate and keep kids safe from electrical harm by learning about electrical hazards through play. “We are excited to partner with… Read More…