Establishing When the CE Code Becomes Mandatory

Electricians With Tools

 

Pierre McDonald

Safety requirements are constantly changing. We often see this with the new car ads that come out every model year with manufacturers claiming their vehicle is the safest in its class. Does the same hold true for electricalcodes and standards?Committees work under increasing pressure as a publication deadline approaches, only to finalize safety requirements in a revised document to be “put out there for use by the industry.” Some codes and standards have a history and are expected, while others are new and have yet to be accepted. In both cases these documents are put forward with the anticipation they will contribute to a safer environment.

In June 2015, the Canadian Advisory Council on Electrical Safety(CACES) met at its annual meeting. This council is an influential body regarding electrical safety, and comprises regulatory members representing every province and territory, as well as representatives of certification bodies, Inspection bodies and standard development organizations. They meet to discuss codes, standards, safety issues, and how they can all work together for a safer electrical industry. One of the summary discussions on the agenda was when the regulatory authorities anticipate the newly published Canadian Electrical Code (CE Code) might become a mandatory requirement within each of their jurisdictions.

The CE Code adoption process varies in each jurisdiction as the provinces and territories have the right to mandate electrical safety as they see fit. Some jurisdictions will adopt the CE Code as published while others amend certain requirements to fit their needs. Not only what is adopted differs from jurisdiction to jurisdiction,but the adoption process itself varies throughout Canada. Some jurisdictions have the CE Code automatically come into force after a fixed time has passed from the code publication date, while other jurisdictions consult with stakeholders and users prior to CE Code adoption. This process could vary from a few months to well over a year and perhaps longer, depending on government priorities at the time. Pressure is front and centre for national harmonization of standards and automatic adoption of codes.

With regard to equipment standards, these requirements are basically set through the Canadian Electrical Code Part II standards and those standards published by ULC Standards (see Appendix A of the 2015 CE Code). These standards ensure that equipment installed in conjunction with the CECode will be compatible and safe to use under the installation rules. The following table illustrates the adoption dates as to when the 2015 CE Code has become or will become adopted in the provincial and territorial jurisdictions in Canada. Jurisdictions that have already adopted the 2015 edition CE Code include the Yukon Territory, the Northwest Territory, Manitoba, Nova Scotia, and Newfoundland and Labrador. Others will follow over the next several months
Codes Table

(Note that certain Municipalities also adopt the CE Code outside of provincial legislation, e.g., St John’s, Winnipeg)

While it is anticipated that the CE Code will be adopted within the above time periods, provincial and territorial legislators always have the final decision. Legislative priorities change very quickly, which could result in substantial delays. Legislation is not an exact science;check with the authority having jurisdiction.

Additional information on the CE Code and other codes or standard requirements within each jurisdiction can be obtained by contacting the appropriate provincial or territorial authority.
For contact information on code authorities (building, fire, gas, plumbing, electrical and environmental) responsible for codes in Canada, please use the following link from the ULC website: http://canada.ul.com/codeauthorities/codeauthoritiesincanada/.

So, does the revision and subsequent adoption of electrical codes and standards always make for a safer electrical installation? While this is one piece of the puzzle, a safe installation requires that all puzzle pieces fit together as intended. From the work done by codes and standards committees through the manufacturers, testing and certification bodies, and Installers right down to the end users, electrical safety needs every part to fit together for a safe electrical environment.


Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

Other articles by Pierre McDonald:

2015 CE Code: Changes on “Approved Electrical Equipment” 

Code and Public Safety 

Section 62: Fixed Electric Heating Systems 

Now Available: CAN/ULC Standard on Electric Utility Workplace Electrical Safety

UL Code Link 

CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories 

Canadian CE Code Changes: Section 20 and More 

Meeting National Building Code of Canada Requirements 

Conductor Ampacities and Their Temperature Rating 

Codes and Standards – Provincial Legislation and the Administrative Requirements of the CE Code 

Changes to Section 12 Wiring Methods 

Section 4 Conductors — Changes from the Canadian Electrical Code’s 2009, 21st Edition to the 2012, 22nd Edition 

 

Related Articles


Latest Articles

  • EV Landscape in Canada: EV Sales, Charging Infrastructure, Incentives, Trends

    EV Landscape in Canada: EV Sales, Charging Infrastructure, Incentives, Trends

    September 22, 2025 By Blake Marchand In Canada, the pressure that US tariffs have put on automakers has led to a recent decision by the federal government to pause and review their EV Availability Standard (EVAS), which set targets for automakers on EV sales and range of models. With that recent announcement, I thought it… Read More…

  • Cooper Lighting Solutions Commits to Canadian Acquisition

    Cooper Lighting Solutions Commits to Canadian Acquisition

    September 22, 2025 Cooper Lighting Solutions, part of the global Signify family, just made a noteworthy move by acquiring Calgary-based Nemalux, a company that has quietly built a reputation over the past two decades for making “tough-as-nails” LED lighting. Nemalux specializes in fixtures designed for the truly harsh places like oil rigs, mines, ships, and… Read More…

  • Major Projects Under Consideration by the Federal Government

    Major Projects Under Consideration by the Federal Government

    Projects deemed to be of national importance and significance are being referred to the Major Projects Office who will continue to work with proponents, provinces, territories and Indigenous Peoples to find the right way forward for these projects. The initial projects under consideration are: LNG Canada Phase 2 – Kitimat, BC Proponent: LNG Canada This project would double… Read More…

  • EFC Urges Federal Government to Maintain the EV Availability Standard to Ensure Affordability, Consumer Choice, and Industry Certainty

    EFC Urges Federal Government to Maintain the EV Availability Standard to Ensure Affordability, Consumer Choice, and Industry Certainty

    Electro-Federation Canada (EFC), the national association representing over 230 member companies in the electrical industry, including manufacturers, distributors, and technology providers that power Canada’s electrification infrastructure, is calling on the federal government to maintain the Electric Vehicle (EV) Availability Standard and preserve policies that send strong and consistent signals to consumers, manufacturers, and investors. At… Read More…


Changing Scene

  • Cooper Lighting Solutions Commits to Canadian Acquisition

    Cooper Lighting Solutions Commits to Canadian Acquisition

    September 22, 2025 Cooper Lighting Solutions, part of the global Signify family, just made a noteworthy move by acquiring Calgary-based Nemalux, a company that has quietly built a reputation over the past two decades for making “tough-as-nails” LED lighting. Nemalux specializes in fixtures designed for the truly harsh places like oil rigs, mines, ships, and… Read More…

  • Greenlee Experience 2025 – Recap

    September 18, 2025  Greenlee brought together electrical and utility professionals for its fourth annual Greenlee Experience, a three-day VIP event   at one of its manufacturing facilities. This exclusive event was created to honor professionals in the electrical and utility trades, while offering a behind-the-scenes look at the brand’s legacy of innovation. “It was an absolute joy… Read More…

  • Ontario Investing $10 million to Build New South Bowmanville Recreation Centre

    Ontario Investing $10 million to Build New South Bowmanville Recreation Centre

    September 18, 2025 The Ontario government is investing $10 million to support the construction of the South Bowmanville Recreation Centre in the Municipality of Clarington. This project is part of the $200 million Community Sport and Recreation Infrastructure Fund (CSRIF) — a provincewide initiative to help communities revitalize local facilities, grow the economy and promote active,… Read More…

  • Ontario Investing $19.5 Million to Build New Recreation Complex in Cambridge

    September 18, 2025 The Ontario government is investing $19.5 million to protect jobs and support the construction of a new multi-purpose recreation complex in the City of Cambridge. This project is part of the $200 million Community Sport and Recreation Infrastructure Fund (CSRIF), a provincewide initiative to revitalize local facilities, grow the economy and promote active, healthy… Read More…