Guide to the Canadian Electrical Code, Part 1[i] – A Road Map: Section 40 — Electric Cranes and Hoists

August 1, 2025

by William (Bill) Burr[i]

Section 40 — Electric Cranes and Hoists

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook but will hopefully provide some help in navigating the Code. These notes are based on the 25th edition.

Section 40

Rule 40-000 ScopeThis is a supplementary or amendatory section of the code and applies to the installation of electrical equipment and circuits for electric cranes, hoists, and monorails. The CEC Handbook provides additional notes and diagrams to better explain this section.

Rule 40-002 Supply conductor sizesBecause of the short duty of crane and hoist motors, insulated supply conductors are selected from Table 58, which specifically applies to Crane and Hoist installations.

Rule 40-004 Conductor protectionInsulated conductors supplying main contact conductors must be installed in approved protective wiring methods—such as rigid conduit, electrical metallic tubing, or sheathed cables—unless Rule 40-018 provides an exception. If a flexible connection to equipment is required, armoured or unarmoured cable, festoon cable, or flexible cord may be used, provided take-up devices are included to prevent cable damage and keep it clear of the operating area.

Rule 40-006 Overcurrent protectionFor main contact insulated supply conductors or directly supplied equipment, the overcurrent protection must be selected as per Rule 28-200 and Tables 29 and D16 for the motor load, plus any allowance as per Rule 14-104 where conductors have been selected with capacity for the other loads on the crane or hoist.

Rule 40-008 Disconnecting meansAll ungrounded conductorsof the main contact conductors must be capable of being simultaneously disconnected quickly for safety in an emergency and for maintenance. The disconnect must be within sight of the main contact conductors or the equipment. In addition, the disconnect must be accessible and be operable from the ground or floor over which the crane or hoist operates.

Rule 40-010 Main contact conductorsThis rule requires thatwhere there are bare main contact conductors, they must have an ampacity not less than the conductors supplying them and, if wire conductors, shall be not smaller than No. 4 AWG copper, or No. 2AWG aluminum. If the conductors are more than 18 m long, then the minimum size must be No. 2 AWG copper or No. 1/0 AWG aluminum unless intermediate strain relief is provided by clamp type insulating supports. Bare conductors may be hard drawn copper, aluminum wire, or steel or other suitable metal in the form of angles, tees, T-rails, or other rigid shapes.

Rule 40-012 Spacing of main contact conductorsBecause bare main contact conductors depend on free air space to provide insulation between phases and to ground, this rule outlines the minimum support separation required of main contact conductors installed in a horizontal plane of 75mm for monorail hoists and 155 mm for other than monorail hoists. If installed in other than a horizontal plane, the separation of the main contact conductor supports must be 200mm. They should also be supported so that the extreme limit of displacement maintains a separation of 38mm from any surface. Where the bare main contact conductors are rigid, the supports must provide a minimum separation of 25mm between conductors, collectors, and any surface.

Rule 40-014 Supporting of main contact conductorsIn addition to the spacing required in Rule 40-012, the main contact conductors must be stretched between strain insulators at each end and supported throughout the length at 6m intervals.  If building conditions preclude supporting at 6m intervals, it may be increased to a maximum of 12m intervals providing the separation between contact conductors is increased by the same proportion. In the case of rigid main contact conductors, insulated supports must be spaced at intervals of up to 80 times the vertical height of the conductor but not more than 4.5m. Refer to the CEC Handbook for diagrams illustrating support spacing and calculation notes.

Rule 40-016 Joints in rigid contact conductorsThis rule outlines the importance of ensuring that any joints made in rigid main contact conductors must maintain the same ampacity of the conductors over the joint to eliminate any overheating.

Rule 40-018 Use of track as a conductor – This rule permits a single monorail, tramrail or crane runway track to be used as one of the main contact conductors or supply circuit conductors for one phase of a 3-phase circuit, providing it is derived from a single isolating transformer, does not exceed 300 v, is bonded to ground (see Rule 10-1100 to 10-1108), and any joints meet Rule 40-016.

Rule 40-020 Guarding of contact conductorsRequires that all contact conductors be guarded against inadvertent contact with bare current-carrying parts unless incorporated in an enclosed contact assembly. In addition, as long as a minimum clearance of 6 m between bare contact conductors and grade, floor, or any working surface (including a catwalk) is maintained, guarding of bare contact conductors may not be required.

Rule 40-022 Contact conductors not to supply other equipmentThis rule prohibits the contact conductors supplying the crane, hoist or monorail feeding other equipment not essential to the operation of the crane, hoist or monorail.

Rule 40-024 Bonding – As per Rule 10-406 all exposed non-current carrying parts shall be bonded to ground. In addition, in the case of a track or rail used as a conductor, it shall be bonded in accordance with Rule 40-018. Note that metal wheels on metal rails may provide a low impedance grounding path. A flexible supply connection as per Rule 40-004(2) must contain a bonding conductor.

View all of the Guide to the Canadian Electrical Code Installments




[i] Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

Related Articles


Latest Articles

  • Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    March 16, 2026 By Electro-Federation Canada Following EFC’s recent update on our 2026 Ottawa Day, we are pleased to share photo highlights from two days of engagement on Parliament Hill, where members met with federal decision-makers to discuss the future of Canada’s electricity system. More than 40 EFC member leaders and Government Relations representatives travelled Read More…

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…


Changing Scene

  • A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    March 16, 2026 Guillevin.com was built as a digital working tool, designed to support the way their customers plan, search for, and purchase products today. The goal is simple: to offer a fast, reliable, and intuitive online platform capable of supporting real-world operations; both on the job site and in the office. A platform built around Read More…

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…

  • KPMG Establishes Major Products Delivery Office

    KPMG Establishes Major Products Delivery Office

    March 13, 2026 KMPG: Complex projects require well-structured teams, appropriate delivery models tailored to the project’s needs, robust governance frameworks, and stable execution environments KPMG Canada is entering a defining era of major project development that has significant implications for the nation’s economic future, as the country works to establish new trade partnerships, develop its resources, reinforce self-reliance Read More…