Bridgeport Mighty-Seal Raintight Reducing Sealing Washers

Nesco Mighty Seal

 

Nesco Canada Bridgeport Fittings offering is expanded to offer Raintight Sealing Reducing washers that maintain the 3R rating of any enclosure when installing raceways in oversized knockouts, or when concentric knock-out rings break out larger than expected. These items are listed for use with Bridgeport’s Raintight Connectors as well as Rigid/IMC conduit. 

Nesco Mighty Seal Application

Simply install the EPDM rubber-coated galvanized washer on the exterior of the enclosure and the non-coated washer (provided) on the interior between the fitting and the locknut, or between two locknuts when using rigid conduit.  

www.nescocanada.com

Related Products:
Bridgeport Grounding Locknuts from 3/4” to 4” Trade Sizes
Bridgeport Mighty- Merge EMT to FMC Transition Couplings

 

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene