Legrand Expands Industrial Watertight Product Line

Legrand Watertight Line

Feb 19, 2016

Legrand’s new Pass & Seymour watertight ground continuity monitoring (GCM) products include an integral indication of ground continuity and power status that also delivers continuous upstream monitoring for enhanced personal safety and added convenience in identification issues.

Watertight ground continuity monitoring

The new industrial watertight ground continuity monitoring products have a dual bright blue or red LED indicator, which is encased in a transparent thermoplastic elastomer. This allows the lights to be seen while providing a NEMA 6P/IP67 rating.

The blue light indicates the upstream circuit is grounded and wired properly from the receptacle back to the panel and from the cord set back to the plug. The red light indicates the open ground/reversed polarity of line conductor power is present in the device. If no light is indicated then there is no power, no open hot or neutral conductor, or no hot/ground reversal.

Black watertight plugs and connectors

New black industrial watertight plugs and connectors are made with thermoplastic elastomer all-black construction that stands up to impacts, oils, chemicals, heat, and weather. The nickel-plated blades and contacts are designed for long lasting, superior corrosion resistance and the multipoint sealing system provides environmental protection of NEMA 4, 4X, 6, 6P & IP67 ratings. The devices resist high-pressure hose down of 1,500 psi. The colour-coded sealing bushings offer a large range of cord diameters and the large ribs on the body allow for a superior grip when mating receptacles.

Watertight receptacles

New industrial watertight receptacles offer an impact-resistant Valox lid, cover plate, and receptacle body that withstands impacts, chemicals and corrosion. These receptacles come with spring-loaded flip covers that offer protection when the device is not in use and are made with a stainless steel hinge spring and pin for corrosion resistance.

Uses for these new products

All these new products can be used in food and beverage processing plants, petrochemical production facilities, pulp and paper mills, water and wastewater facilities, warehouse and refrigeration facilities, in mining operations and places where temporary power is used.

Find out more:http://www.legrand.ca/.

>> Source ALL of your Canadian Electrical products in the Goldbook Directory <<

 Other products:

Legrand Intuity Provides Whole Home Control of Technology

Legrand On-Q Digital Audio System: Connect a Home to Limitless Listening

Legrand Wiremold deQuorum Flip-Up Table Boxes

Legrand Adds Almost 50 New Networking Transceivers to Its Networking Product Line

Legrand Intuity Provides Whole Home Control of Technology

Legrand Expands Industrial Watertight Product Line

Legrand Launches Best-in-Class Architectural Dimming Panel Platform

Legrand Offers Desktop Power, Communications and USB Charging

Legrand Introduces New Harmony 0-10V Dimmer

Related Articles


Latest Articles

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…

  • Nova Scotia Invests in Generational Affordable Housing for Shannon Park

    Nova Scotia Invests in Generational Affordable Housing for Shannon Park

    December 15, 2025 Work to build more than 1,400 new homes across Nova Scotia – about two-thirds at Shannon Park in Dartmouth – will soon begin with funding from the Province and the federal government. Housing Minister John White and federal Minister of Housing and Infrastructure Gregor Robertson announced $300 million to build 1,430 new… Read More…


Changing Scene

  • CSA Group Receives Greater Toronto’s Top Employers Award for 10th Consecutive Year

    CSA Group Receives Greater Toronto’s Top Employers Award for 10th Consecutive Year

    December 15, 2025 For the tenth consecutive year, CSA Group has been awarded as one of Greater Toronto’s Top Employers for 2026 by Mediacorp Canada Inc. This milestone reflects CSA Group’s continued commitment to fostering a workplace culture that supports employee wellbeing, professional growth, and community engagement. CSA Group’s global headquarters, located in Toronto, offers… Read More…

  • Hydro Ottawa to Use AI-Enhanced Predictive Analytics to Improve Energy Efficiency

    Hydro Ottawa to Use AI-Enhanced Predictive Analytics to Improve Energy Efficiency

    December 15, 2025 With $6 million in federal funding, Hydro Ottawa is introducing the Ottawa Distributed Energy Resource Accelerator (ODERA) program. Through this program, Hydro Ottawa will use AI-enhanced predictive analytics to accurately forecast peak demand, which will then inform the real-time balancing of supply and demand. This will be achieved by using a technology… Read More…

  • Stanpro’s Katy’s Donation Day Breaks Record, Giving Back to Communities Across Canada

    Stanpro’s Katy’s Donation Day Breaks Record, Giving Back to Communities Across Canada

    December 15, 2025 Stanpro is proud to announce the results of its annual Katy’s Donation Day, held on December 3, 2025. This year, the initiative resulted in a record donation of over $100,000, making this the highest contribution in the history of this program. The funds raised will be distributed to over 80 charitable organizations… Read More…

  • EB Horsman Introduce Cory Carter as New Victoria Branch Manager

    EB Horsman Introduce Cory Carter as New Victoria Branch Manager

    December 15, 2025 EB Horsman is pleased to announce the appointment of Cory Carter as Branch Manager of our Victoria location, effective November 10, 2025. With over two decades of experience in the electrical, lighting, and retail industries, Cory brings a proven track record of leadership, sales growth, and customer relationship management. Throughout his career,… Read More…