Greenlee Next-Gen Battery Powered Hydraulic Tools

November 14, 2016

Greenlee Textron Inc. new line of Next Generation battery-powered hydraulic tools include real-time communication technology and improved ergonomics, focus on optimizing the tool’s centre of gravity for the comfort of the worker, and provide a longer battery life supplied by an enhanced Makita platform.

“A lot has changed since Greenlee introduced the first battery-powered hydraulic cutters and crimpers back in 1995,” says Ryan Berg, Director of Product Management for Greenlee. “Today’s professional electricians want tools that have the latest in technological advances, such as a full diagnostic readout that prove the job was done correctly, a more ergonomic design and, of course, more power. Our new battery-powered hydraulic tools are packed with all of these features and many more.”

Tools in the new Next Generation line include 6-, 12-, and 15-ton crimping tools, as well as cable and bolt cutters, and a 10K PSI pump with removable heads that have the capabilities to do both.

Each product in this new line of tools features Bluetooth communication technology. This allows electricians to wirelessly manage their tools, access tool history, monitor service timelines, and customize tool operation to suit their preferences.

Each crimper is equipped with Intelli-CRIMP technology, a unique pressure sensor that monitors the crimping process, ensuring the correct amount of pressure is applied to each crimp. Crimpers equipped with this feature emit audible and visual alerts to notify the operator when a crimp is below specifications, giving assurance to the operator that the job was done right.

Some tools are also equipped with Auto Retraction Stop (ARS), which retracts the ram just enough to prepare the tool for the next cycle, saving time and energy. Retraction Stop Repeat (RSR) allows the operator to partially retract the ram and repeat that retraction for subsequent crimps.

The improved ergonomics of the Next Generation tools includes a reverse tapered hand grip for increased grip strength, and optimal hand positioning to help avoid user fatigue. The rugged housing construction protects internal components against dirt and water intrusion. There is also a larger hydraulic reservoir for increased oil capacity and application for in-line products. The enhanced tool design also features an LED display that exhibits real-time communication of tool details including: battery charge level, pressure sensor readings, and cycle information.

The new Next Generation tools also come with an upgraded high capacity Makita battery platform that includes an active battery monitoring system for longer lasting productivity. The upgraded power capacity also provides more battery supply, protection, and a fuel gauge to inform the user of the battery’s remaining amount of charge.

The new Greenlee Next Generation battery-powered hydraulic cutter and crimpers offer a high-quality solution for faster, safer and easier wire and cable termination. For more information, visit www.greenlee.com or call 1-800-435-0786.

 

Related Articles


Latest Articles

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…

  • Nova Scotia Invests in Generational Affordable Housing for Shannon Park

    Nova Scotia Invests in Generational Affordable Housing for Shannon Park

    December 15, 2025 Work to build more than 1,400 new homes across Nova Scotia – about two-thirds at Shannon Park in Dartmouth – will soon begin with funding from the Province and the federal government. Housing Minister John White and federal Minister of Housing and Infrastructure Gregor Robertson announced $300 million to build 1,430 new… Read More…


Changing Scene

  • CSA Group Receives Greater Toronto’s Top Employers Award for 10th Consecutive Year

    CSA Group Receives Greater Toronto’s Top Employers Award for 10th Consecutive Year

    December 15, 2025 For the tenth consecutive year, CSA Group has been awarded as one of Greater Toronto’s Top Employers for 2026 by Mediacorp Canada Inc. This milestone reflects CSA Group’s continued commitment to fostering a workplace culture that supports employee wellbeing, professional growth, and community engagement. CSA Group’s global headquarters, located in Toronto, offers… Read More…

  • Hydro Ottawa to Use AI-Enhanced Predictive Analytics to Improve Energy Efficiency

    Hydro Ottawa to Use AI-Enhanced Predictive Analytics to Improve Energy Efficiency

    December 15, 2025 With $6 million in federal funding, Hydro Ottawa is introducing the Ottawa Distributed Energy Resource Accelerator (ODERA) program. Through this program, Hydro Ottawa will use AI-enhanced predictive analytics to accurately forecast peak demand, which will then inform the real-time balancing of supply and demand. This will be achieved by using a technology… Read More…

  • Stanpro’s Katy’s Donation Day Breaks Record, Giving Back to Communities Across Canada

    Stanpro’s Katy’s Donation Day Breaks Record, Giving Back to Communities Across Canada

    December 15, 2025 Stanpro is proud to announce the results of its annual Katy’s Donation Day, held on December 3, 2025. This year, the initiative resulted in a record donation of over $100,000, making this the highest contribution in the history of this program. The funds raised will be distributed to over 80 charitable organizations… Read More…

  • EB Horsman Introduce Cory Carter as New Victoria Branch Manager

    EB Horsman Introduce Cory Carter as New Victoria Branch Manager

    December 15, 2025 EB Horsman is pleased to announce the appointment of Cory Carter as Branch Manager of our Victoria location, effective November 10, 2025. With over two decades of experience in the electrical, lighting, and retail industries, Cory brings a proven track record of leadership, sales growth, and customer relationship management. Throughout his career,… Read More…