Duncan Instruments MD10KVx Digital Insulation Tester

Tester

November 13, 2107

Duncan Instruments Digital Insulation Tester is ideal for a wide range of testing of insulatresistance up to 10 TOhm.

Features:

Test Voltages(T.V):
500 V, 1,000 V, 5,000 V, 10,000 V directly, one button selectable.
500 V to 10 kV in 25 V, 100 V or 500 V steps. DC, negative.
Max. Resistance Reading
10 TOhm @ 10 kV.
Overvoltage category
CAT. III 600V
Display
Digital and bargraph reading.
Test voltages accuracy
± 3% of nominal test voltages on 10 GOhm
Safety Class
In accordance with IEC 1010-1
MegaLogg2 Software
With graphic, tabular views, automatic report generator
Environmental protection
IP54 (with closed lid).
BatteryCharger
AC adapter 18 V – 2 A. (Input 90 – 260 V~ 45-65 Hz).
Dimensions & Weight
406 x 330 x 174mm & Approx. 6.3Kg

 

For more information:

http://www.duncaninstr.com/md10kvx.htm

Related Articles


Latest Articles

  • Canada’s Electrical Industry Faces a Shifting Economic Landscape: Reflections from EFC’s Forecast Webinar

    Canada’s Electrical Industry Faces a Shifting Economic Landscape: Reflections from EFC’s Forecast Webinar

    November 28, 2025 By Electro-Federation Canada Canada’s electrical industry is navigating a period of significant change shaped by global uncertainty, evolving trade dynamics, and accelerating investment needs at home. During Electro-Federation Canada’s (EFC) Economic Forecast Webinar in September, two leading economists outlined trends that continue to influence the industry as businesses look toward 2026. The… Read More…

  • ESA 2025 Annual Licence Holder Meeting

    ESA 2025 Annual Licence Holder Meeting

    December 8, 2025 This year marked ESA’s 20th Annual Licence Holder Meeting — a milestone celebrating two decades of collaboration, innovation and safety leadership made possible by Ontario’s licence holder community. The meeting was held on Wednesday, November 26, 2025 Agenda Highlights Watch a recording of the 2025 Licence Holder Meeting. Read More…

  • BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    December 8, 2025 Get funding from BC Hydro for businesses upgrading eligible equipment with energy-efficient models. Funding rates vary depending on the equipment being upgraded, with past participants receiving an average of 30% for upfront costs. Incentives are available for: Bonus offer BC Hydro is currently offering a 30% bonus incentive on all business energy-saving incentives projects… Read More…

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…


Changing Scene