1-to-3 Power Source Generates 3-Phase Power from Single Phase Input Unique Technology available in 50, 75 and 100 HP Configurations

SinglePhase 1to3 400

May 21, 2019

Single Phase Power Solutions introduces the 1-to-3 Power Source features a BELLE Motor which uses Written-Pole technology to deliver three-phase power from single-phase utility service. This revolutionary approach eliminates the high fuel and maintenance costs, and the pollution of fossil-fuel-powered Gen-Sets, while delivering superior power quality to that of a conventional phase converter. It is far more cost effective than extending 3-phase power where it is not currently available. Available in 50, 75 and 100 HP configurations, the 1-to-3 Power Source™ is ideal for a broad range of industries and applications, including mining, agriculture, and commercial and industrial sites where three phase power is not available, and more.

A Written-Pole single-phase motor can drive a three-phase conventional generator to produce clean, balanced voltage. The proven converter circuit can start multiple smaller 3-phase motors. The 1-to-3 Power Source can start a single motor up to about 50% of tis rating, and other smaller motors up to its output rating, thus providing flexibility and cost savings.

Because of the high load synchronizing capability of the Written-Pole drive motor, a large flywheel can be added to greatly improve the motor starting capacity of the three-phase generator.

Cost Effective and Ongoing Cost Savings

Extending three-phase distribution is expensive, typically between $30K to $110K per mile. Using a 1-to-3 Power Source avoids that cost. Utilities often amortize the high cost to extend distribution, charging customers monthly fees whether they use the power or not. Use of a 1-to-3 Power Source avoids these charges, which can range from $12K to $60K per year. The highly efficient written-Pole® Motor driving the 1-to-3 achieves a full load efficiency exceeding 88%, which can reduce energy costs by thousands of dollars each year. Since the 1-to-3 input runs at unity power factor, there is no power factor penalty, a potentially significant cost avoidance.

Low Maintenance

The 1-to-3™ can replace the diesel or gas engines that are often used as the prime movers for pumps and generator sets. In addition to adding fuel, these engines require significant maintenance and upkeep such as filters, spark plugs, belts, oil changes, and more. The Written-Pole® motor requires very little maintenance in comparison. Aire and noise pollution are also reduced, but most importantly reliability is greatly improved with the 1-to-3™.

Power Quality

The 1-to-3 allows weak single-phase lines to deliver strong thre-phase power with excellent voltage regulation and precise 60 Hz frequency. The generator output voltage provides well-balanced three-phase power capable of staring and running large three-phase motors and power quality-sensitive electronic controls. This equipment isolates the application (and the utility) from harmonics that are harmful to sensitive loads.

Efficiency

Written-Pole motors start using only 1.7x their rated running current. This eliminates the excess voltage sag or “flicker” that can cause problems on distribution lines. The efficiency rating of the motor is 95.5% and the generator efficiency is 93.5%, resulting in an overall efficiency of 89% with 10% electrical isolation. With the 1-to-3 Power Source customers served by single phase lines can get high-quality power for three-phase applications. Unlike conventional phase converters, the 1-to-3 provides true, balanced, three-phase power, eliminates disruptive harmonic feedback, is a unity power factor load to the utility, and with an added flywheel, can ride through momentary power interruptions with ease.

Source

Related Articles


Latest Articles

  • ESA 2025 Annual Licence Holder Meeting

    ESA 2025 Annual Licence Holder Meeting

    December 8, 2025 This year marked ESA’s 20th Annual Licence Holder Meeting — a milestone celebrating two decades of collaboration, innovation and safety leadership made possible by Ontario’s licence holder community. The meeting was held on Wednesday, November 26, 2025 Agenda Highlights Watch a recording of the 2025 Licence Holder Meeting. Read More…

  • BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    December 8, 2025 Get funding from BC Hydro for businesses upgrading eligible equipment with energy-efficient models. Funding rates vary depending on the equipment being upgraded, with past participants receiving an average of 30% for upfront costs. Incentives are available for: Bonus offer BC Hydro is currently offering a 30% bonus incentive on all business energy-saving incentives projects… Read More…

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…

  • Why Choosing the Right USB Charger Matters

    Why Choosing the Right USB Charger Matters

    December 1, 2025 Not all USB Chargers are Created Equal As the number of devices used daily increases, so does the need for a charger that delivers safe speeds and maximum charging potential. A high-quality USB charger delivers efficient charging without risk of damage, but the sea of USB chargers and outlets available on online… Read More…


Changing Scene

  • BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    December 8, 2025 As the BC Legislature wraps up the final week of the Fall session, BCCA is very pleased to see Bill 20 receive Royal Assent and officially become the Construction Prompt Payment Act, SBC 2025, c 24. This marks a significant milestone for BC’s construction sector. This achievement reflects decades of consistent, principled… Read More…

  • Federal Government Announces New Measures to Support Steel and Lumber

    Federal Government Announces New Measures to Support Steel and Lumber

    December 8, 2025 The world is changing rapidly. The United States, the world’s largest economy, is fundamentally reshaping all its trade relationships, causing major disruption and upheaval for Canadians. It is time to transform our economy from one that is reliant on a single trade partner to one that is stronger, more self-sufficient, and resilient… Read More…

  • Skills Ontario Celebrates the Expansion of Trades & Tech Truck Program

    Skills Ontario Celebrates the Expansion of Trades & Tech Truck Program

    December 1, 2025 Skills Ontario is expanding its fleet of Trades & Tech mobile unit thanks to support from the Ontario Government. The government announced this morning it’s investment in Skills Ontario to expand experiential opportunities for Ontario’s future workforce.    “Ontario’s future relies on a strong, skilled workforce,” said David Piccini, Minister of Labour, Immigration,… Read More…

  • BC’s Canadian Mutual Recognition Agreement aims to Facilitate Interprovincial Trade

    BC’s Canadian Mutual Recognition Agreement aims to Facilitate Interprovincial Trade

    December 1, 2025 A new agreement signed by all provinces, territories, and the federal government will break down interprovincial trade barriers, making it easier for B.C. businesses to sell products across Canada, and for people to buy Canadian-made goods.   “When threats to Canada’s economic security land at our doorstep, we’re at our best when we work together as… Read More…