Bridgeport Fittings Launches New E-Z LOCK Connectors

EIN Bridgeport EZ 400

Oct 9, 2019

Bridgeport Fitting’s new E-Z LOCK connectors offer contractors superior installation speed in both snap-in and locknut styles. Plus, the connectors’ low-profile, single-barrel design allows for installation in tight, confined spaces.

When optimal installation speed is desired, contractors can use Bridgeport’s ASP line of E-Z LOCK connectors to snap quickly and securely into knockouts. When a traditional locknut installation is preferred, contractors can choose Bridgeport’s 590-DC2 series or duplex 3838-DC2, which come with Bridgeport’s legendary, serrated, and double-sided, locknut. All series utilize a steel, 4-tabbed, inner-locking device that ensures continuity and secure cable support.

All E-Z LOCK connectors are cULus or cETLus listed, for use with AC, AC90, ACG90, MC, MCI-A, HCFMCI-A, and MC-PCS cable. Not only that, both the 39ASP and the 74ASP connectors have just received cETLus listings. The 39ASP features a larger cable range, up to 8/3 and the ¾-inch trade size 74ASP, which is ideal for ½-inch FMC and up to 6/3 cable applications. These connectors will be available in the first quarter of 2020, while Bridgeport’s high-volume connectors, the 38ASP and 590-DC2, are in stock now and ready for immediate shipment.

Go HERE for a product demonstration video

Go HERE for more information

Related Articles


Latest Articles

  • Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    Shore-Side Electricity and Data Monitoring Take Hold in the Cruise Industry

    April 15, 2024 On July 7, 2023, the United Nations International Maritime Organization (IMO) and its participating maritime countries set their Greenhouse Gas (GHG) emissions strategy to achieve net zero “by or around” 2050. As a result, the shipping industry, including cruise lines, is adopting various strategies to achieve this ambitious goal, including new fuels,… Read More…

  • Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Project Spotlight: Sainte-Thérèse High School Lighting Upgrade

    Built in 1980, the building that houses Sainte-Thérèse high school, in Quebec Canada, was looking a little worse for the wear. Renovation work began with two major projects: introducing a multidisciplinary sports centre, as well as redesigning the parking lots.  The employee and visitor parking lots were completely reconfigured during phase 1 of the renovation… Read More…

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 10 – Grounding and Bonding

    April 8, 2024 By William (Bill) Burr[i] The Code is a comprehensive document. Sometimes, it can seem daunting to quickly find the information you need.  This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B, or the… Read More…

  • Investment in the Residential Sector Declines in January 2024

    Investment in the Residential Sector Declines in January 2024

    April 8, 2024 Investment in building construction declined 0.9% to $19.7 billion in January. The residential sector declined 1.4% to $13.6 billion, while investment in the non-residential sector edged up 0.2% to $6.1 billion. On a constant dollar basis (2017=100), investment in building construction fell 0.9% to $12.1 billion in January. Investment in the residential sector declines Investment in residential building construction declined… Read More…


Changing Scene