Sterling SFTL 1000V CAT IV Protection Fused Leads Set

EIN Sterling SFTL Leads

January 10, 2022

Maintenance of electrical and electronic equipment exposes the technician to potentially lethal voltages and short circuit current.

Fused test leads are essential protection where personel is exposed to potentially lethal voltages and short circuit current. Electrical instruments have fuses inside them, but those fuses do not always provide enough protection, especially when used on high energy circuits. The closer the fuse to the connection, the better protection it is providing to the operator. Therefore fused test leads with fuses installed right at the connection point provide the best protection.

  • Very flexible 1.1 Meter, Silicone rubber jacket, multistranded copper, 18AWG
  • Termination: Right angle, sleeved 4mm banana
  • Fuse: 0.5A, 1000V, 50KA rupture
  • Wear Guard Damage Control
  • Safety: ANSI/UL 61100-031-2010, CSA C22.2 No. 61010-031-07
  • Rating: CATIV 1000V
  • Comes with E-Z off protective cap

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…