Eaton Bussman Arc Flash Suit Kit

EIN Eaton Arc Flash Suit 400

August 31, 2022

Suit specifications

  • Arc flash rated 12 cal/cm2
  • Meets ANSI/ISEA 125 Level 2 Conformity
  • Meets Arc Flash PPE Category 2
  • Hard hat is ratedType 1 Class C, G and E
  • Face shield is made from durable polycarbonate and has both anti-fog and scratch-resistant coatings
  • Face shield features a nearly clear grey color for 100% true color acuity
  • Coverall and balaclava are made from flame-resistant fabrics
  • Optional shield-mounted light is available for increased visibility in dark spaces

Arc flash suit kit includes

  • All items made in the USA
  • Hard hat and face shield Coverall with zip front
  • Balaclava to cover face and neck Nylon storage bag

Go HERE for more information

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed… Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…


Changing Scene