Fluke 393 with Solar Irradiance Meter and TLPV Test Leads

March 21, 2025

Fluke 393 FC Clamp Meter:

  • CAT III 1500 V rated for safe, high-voltage measurements
  • Thin jaw design for easy access to cables in crowded combiner boxes
  • IP54 rated for durability in outdoor environments 
  • DC power measurement, audio polarity, and visual continuity features for efficient solar testing
Fluke Solar Site Survey Irradiance Meter:
  • Measures solar irradiance, ambient temperature, PV module temperature, array orientation, and tilt angles
  • Provides instantaneous measurements to determine watts per square meter of solar irradiation per IEC 62446-1 standards
  • High-contrast LCD display for easy readability in direct sunlight
  • IRR2-BT wirelessly communicates with SMFT-1000 for accurate I-V curve measurements
Fluke TLPV1 Test Lead Set:
  • Designed for safe PV measurements with Staubli MC4 connectors
  • Ideal for regular testing and troubleshooting of Staubli MC4 PV panels
  • Includes Fluke TLPV-UTOOL for easy connector disconnect
  • Fluke LeadWrap for organized test lead management
Fluke TLPV2 Solar Clamp Test Lead Set:
  • MC4 connectors for seamless connection between solar panels and inverters
  • Ensures safe DC power measurements on photovoltaic systems
  • Facilitates troubleshooting and maintenance of solar PV circuits
  • Nickel-plated contacts for long-lasting durability
  • Includes PV unlocking tool for easy disconnect of Staubli MC4 connectors

This bundle offers all the tools needed for accurate, safe, and efficient solar system testing, from installation to maintenance.

Go HERE for more information

Related Articles


Latest Articles

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed… Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will… Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in… Read More…

  • Residential Investment in Building Construction Declines in September

    Residential Investment in Building Construction Declines in September

    December 15, 2025 Overall, investment in building construction decreased 1.1% to $22.4 billion in September. Investment in the residential sector declined 1.7%, while that in the non-residential sector was virtually unchanged. Year over year, investment in building construction grew 6.0% in September. On a constant dollar basis (2023=100), the total value of investment in building construction in September decreased 1.4%… Read More…


Changing Scene